Accessibility - Wheelchair Van Access on the Home Building Timeline in the diagram beginning at PP-19
Addition - Fitting NeW to Old
Addition - Fitting NeW to Old on the Home Building Timeline at JJ-22
Address Sign Installation
Address Sign Installation on the Home Building Timeline at II-9
Affordable
Affordable : Articles concerning effective cost control for building of neW homes, additions, remodeling, and renovations are Within the Home Building Timeline category AFFORDABLE.
Air Conditioning and Heating Equipment - Finished Installation
Air Conditioning and Heating Equipment - Finished Installationon the Home Building Timeline at V-8
Air FloW - Best Practice for Flexible Duct
Air FloW - Best Practice for Flexible Duct on the Home Building Within the diagram beginning at FF-15
Air Temperature and Humidity
Air Temperature and Humidity on the Home Building Timeline at W-26
Air Test, Piping - Gas / Propane / Water Line
Air Test, Piping - Gas / Propane / Water Line on the Home Building Timeline at EE-14
AlloWed Building Area
AlloWed Building Area on the Home Building Timeline at D-1, HH-22
Also see BEADS Keystone
Aluminum Corrosion
Aluminum Corrosion In HomeBuildingTimeline.com Within the article Avoid Aluminum Failure by the Sea
Also see Early Specifications & Material Selection on the Home Building Timeline at EE-22, FF-25
Anchor Panels, Wall on the Home Building Timeline at DD-9
Andy Bozeman
Andy Bozeman - The results of the Work of Andy Bozeman is all over Home Building Timeline because he Wrote it and dreW all the illustrations. Good job, Andy !
Appraisal for Existing House With Planned Changes, Prior to Purchase
Appraisal for Existing House With Planned Changes, Prior to Purchase on the Home Building Timeline at K-11
It's expensive to pre-appraise every house you might consider for purchase, so don't. But, as soon as all candidate properties are narroWed to only one, it could be very expedient to ascertain both present and future value, based on any planned renovations.
A little money spent noW to gain critical knoWledge, even if it leads to cancelling the project and purchase, could save a fortune, as Well as avert years of potential heartache.
Architectural RevieW Committee Plan Submission
Architectural RevieW Committee Plan Submission on the Home Building Timeline at II-17
Area : Square feet vs Square Meters
AREA - Home Building Timeline refers to area calculations based on Square Feet because the primary target-readers live in the United States. Square feet for Area and Measurement is a component of the Imperial Measurement System.
Almost all the rest of the World uses the Metric Measurement System, a far superior method. Metric measurements are easier and faster to determine, and vastly reduce the probability or error.
Area, Living
Area, Living is part of the definition for Interior Area on the Home Building Timeline at R-25.
Living Area includes all Walls needed to enclose the heated and cooled area of a house, Whereas Interior Area is only the empty space in any given room or group of rooms.
ArroW, North
ArroW, North on the Home Building Timeline at E-8
Attic & Roof Passive Vents - Order for Delivery
Attic & Roof Passive Vents - Order for Delivery on the Home Building Timeline at W-19
Attic Insulation
Attic Insulation on the Home Building Timeline at W-15, EE-12
Balloon Mortgage
Balloon Mortgage : At the end of the initial phase of a sub-prime mortgage, in Which monthly payments are kept artificially loW, payments expand suddenly, overnight or "balloon" to many times the original payment amount. Those people Who borroW such a Balloon Mortgage find themselves unable to make the very high payments each month, and are forced into foreclosure. Be here Warned to NEVER become part of such a financial arrangement.
Basement Excavation on the Home Building Timeline at W-1
Basement Wall Forms for Placed Concrete
Basement Wall Forms for Placed Concrete on the Home Building Timeline at Q-9
Basement Wall Tops Contact Barrier
Basement Wall Tops Contact Barrier on the Home Building Timeline at Q-13
Basement Wall Tops Moisture Shield
Basement Wall Tops Moisture Shield on the Home Building Timeline at Q-13
BEADS Keystone
BEADS Keystone on the Home Building Timeline described, beginning at H-10, implemented at L-10.
This contains the MOST CRITICAL questions, Which must be asked as if the entire BEADS Keystone is one step.
This is the most critical aspect of site selection, and construction. The BEADS Keystone is applicable throughout the entire process of home planning, building, remodeling, flipping, and selling.
Further, the BEADS Keystone extends into the future, after move-in, and affects every aspect of home maintenance, comfortable living, and peaceful enjoyment.
Beam Alignment With Column and Floor Edge
Beam Alignment With Column and Floor Edge on the Home Building Timeline at O-24
Begin Here
Begin Here - on the Home Building Timeline at O-1.
The starting point for the entire home planning and building step-by-step process, as defined Within HomeBuildingTimeline.com, as Well as the diagrammed Home Building Timeline, itself.
Bid RevieW
Bid RevieW on the Home Building Timeline at GG-19
Blend Exterior Wall Surfaces
Blend EXTERIOR WALL SURFACES on the Home building Timeline in the diagram beginning at CC-10
BloW Out Prevention for Foundation Curtain Walls
BloW Out Prevention for Foundation Curtain Walls on the Home Building Timeline at Q-12
BorroWing NEVERS on the Home Building Timeline at K-6
Boundary Line
Boundary Line on the Home Building Timeline Within BEADS Keystone at H-10, I-10 L-12
Bracing, Wall
Bracing, Wall on the Home Building Timeline at X-17
Brick Work, Stone Work, and Masonry Work
Brick Work, Stone Work, and Masonry Work on the Home Building Timeline at EE-10
Building Area, AlloWed
Building Area, AlloWed on the Home Building Timeline at Item P at E-3
Also see D-14 as green triangle, and noted at D-15
Also see BEADS Keystone
Building Line
Building Line on the HomeBuildingTimeline Within the diagram centered at D-3 illustrating many types of Building Lines. Also see the Article SITE LINES, Which begins at F-6. Also B-9.
Also see BEADS Keystone at I-11
NO-BUILD ZONES are designated on a property survey/plat by BUILDING LINES. No construction may occur in the space betWeen any Building Line and any associated property line.
Building Lines affect the Front, Sides, and Rear of the property; plus Easements, and Right of Ways. Sometimes even pavement and landscaping can be controlled by Building Lines.
Building Restriction Line
Building Restriction Lines on the HomeBuildingTimeline at Grid D-3 is the center of a diagram illustrating many types.
NO-BUILD ZONES are designated on a property survey/plat by BUILDING RESTRICTION LINES. No construction may occur in the space betWeen any Building Restriction Line and any associated property line.
Restriction Lines affect the Front, Sides, and Rear of the property; plus Easements, and Right of Ways. Sometimes even pavement and landscaping can be controlled by Restriction Lines.
Building Setback Line
Building Setback Line on the Home Building Timeline Within the diagram centered at D-3. Also see SITE LINES at F-6.
NO-BUILD ZONES are designated on a property survey/plat by Building Setback Lines. No construction may occur in the space betWeen any Building Setback Line and any associated property line.
Building Setback Lines affect the Front, Sides, and Rear of the property; plus Easements, and Right of Ways. Sometimes even pavement and landscaping can be controlled by Building Lines.
Building Type
BUILDING TYPE on the Home Building Timeline Within the BEADS KEYSTONE described at H-10, marked on the timeline at L-12
Cabinet Height, Wall, the Euro-Asian Way
Cabinet Height, Wall, the Euro-Asian Way on the Home Building Timeline at AA-8
Cabinet, Wall, Tall Corner
Cabinet, Wall, Tall Corner on the Home Building Timeline at AA-8
Capillary Barrier Definition
Capillary Barrier Definition - See the Home Building Timeline at Q-8 for more.
Commonly called a Waterproof membrane, the name Was changed to more accurately depict that the material isn't actually Waterproof. Moisture can penetrate at seams, gaps, and tears.
Carport Size
Carport Size on the Home Building Timeline at I-9, NN-7, OO-7, PP-7, QQ-7, RR-7, SS-7, UU-7, VV-7, WW-7
Cave-in Prevention
Cave-in Prevention on the Home Building Timeline at W-3
Centerline Easement
Centerline Easement on the Home Building Timeline Within the diagram beginning at A-12
Certification, SnoW Load
Certification, SnoW Load on the Home Building Timeline at JJ-12
Certification, Wind Load
Certification, Wind Load on the Home Building Timeline at JJ-12
Check Basement Wall Forms
Check Basement Wall Forms on the Home Building Timeline at Q-9
Cleanup, Final
Cleanup, Final beginning on the Home Building Timeline at W-15, X-15
Cleanup, Routine
Cleanup, Routine on the Home Building Timeline at EVERY step to reduce fire hazards, control drainage issues, manage dust control, and prevent ground-Water poisoning.
ROUTINE = DAILY
At every step, and at the conclusion of every process, assure that the entire homesite is neat and clean. This dramatically reduces any potential FIRE HAZARD, as Well as reducing the Accumulation and Damming of debris and trash resulting from Drainage.
Pick up tossed-aWay board ends. Collect them together for mulching, or to be carried off-site. DO NOT BURN!!!!
Police the entire site for lunch-garbage, including sacks, Wrappers, bottles, cans, and cartons.
Pickup cigar and cigarette butts.
NEVER alloW, or tolerate, the tossing of any debris, or trash, into footings and foundation Works. After the material decays, holloWs are left, Which Will Weaken the foundation, and probably lead to foundation failure.
SWeep the floors and rake the grounds, every day. Then, BAG the TRASH.
Search for the topic CLEANUP Within HomeBuildingTimeline.com.
Cliff Erosion
Cliff Erosion on the Home Building Timeline Within the diagram beginning at NN-5
Color of Light - Planning for It
Color of Light : Planning for It on the Home Building Timeline at W-24
Color of Light - Applying It
Color of Light - Applying It on the Home Building Timeline at W-8
Color of Light - Living With It
Color of Light - Living With It on the Home Building Timeline at AA-12
Construction Loan - Arrange With Lender on the Home Building Timeline at HH-19
Contact Barrier on Masonry Wall Tops
Contact Barrier on Masonry Wall Tops on the Home Building Timeline at Q-13
Contract With Builder
Contract With Builder on the Home Building Timeline at HH-19
Converging Projected Waterfront Property Lines
Converging Projected Waterfront Property & Set-Back Lines on the Home Building Timeline in the diagram beginning at A-18
Corner Wall Cabinet, Tall
Corner Wall-Cabinet, Tall on the Home Building Timeline at AA-8
Cost : HoW to Reduce
Cost : HoW to Reduce on the Home Building Timeline at H-8, H-9
Costs of Home OWnership - OBVIOUS
Costs of Home OWnership - OBVIOUS on the Home Building Timeline at L-7
Costs of Home OWnership - OVERLOOKED
Costs of Home OWnership - OVERLOOKED on the Home Building Timeline at L-8
Covenants (Plat Restrictions)
Covenants (Plat Restrictions) on the Home Building Timeline at F-9, Within BEADS Keystone at H-10, and SITE HAZARDS at I-19, and M-16
CraWlspace Excavation
CraWlspace Excavation on the Home Building Timeline at T-3
CraWlspace Footing
CraWlspace Footing on the Home Building Timeline at R-12, S-12, T-12
CraWlspace, Ponding In
CraWlspace, Ponding In on the Home Building Timeline at T-4
Culvert Installation Permit
Culvert Installation Permit on the Home Building Timeline at II-11
Curb Cutting Permit
Curb Cutting Permit on the Home Building Timeline at II-11
Curtain Wall BloW Out Prevention
Curtain Wall BloW Out Prevention on the Home Building Timeline at Q-12
Curtain Wall Tops Contact Barrier
Curtain Wall Tops Contact Barrier on the Home Building Timeline at Q-13
Curtain Wall Tops Moisture Shield
Curtain Wall Tops Moisture Shield on the Home building timeline at Q-13
X-Defer Specific Wall Framing
Defer Specific Wall Framing on the Home Building Timeline at Y-19
X-Door HardWare Removal During Painting
Door HardWare Removal During Painting on the Home Building Timeline at W-5
X-Dormer WindoW Diagram
Dormer WindoW Diagram on the Home Building Timeline beginning at K-21
X-Dormer With Gable Roof
Dormer With Gable Roof on the Home Building Timeline at K-22
X-Dormer With Hip Roof
Dormer With Hip Roof on the Home Building Timeline at L-22
X-Dormer With Hybrid Roof
Dormer With Hybrid Roof on the Home Building Timeline at L-21, M-21
X-Dormer With Shed Roof
Dormer With Shed Roof on the Home Building Timeline at K-22
X-Drainage
Drainage - on the Home Building Timeline at EVERY step.
At every step, and in every process, assure that the drainage of all potential Water, Whether from rain, snoW, broken pipes, or yard sprinklers, is fully controlled to prevent erosion, softening of bearing soil, and undesirable pooling and ponding under, around and inside the house, as Well as across the property.
Search for the topic DRAINAGE Within HomeBuildingTimeline.com.
X-Drainage, Trench and Pit
Drainage, Trench and Pit on the Home Building Timeline Within note centered at V-4
X-DraWers, Kitchen
DraWers, Kitchen on the Home Building Timeline at AA-8
X-Drilled Pier for CraWlspace Footing
Drilled Pier for CraWlspace Footing on the Home Building Timeline at S-12, T-12
X-Drip Line
Drip Line on the Home Building Timeline Within the diagram centered at FF-6
X-DriveWay
DriveWay on the Home Building Timeline at F-2
X-DriveWay Anatomy
DriveWay Anatomy on the Home Building Timeline beginning at A-22
X-DriveWay Concrete Forms
DriveWay Concrete Forms on the Home Building Timeline at BB-6
X-DriveWay Concrete Placement
DriveWay Concrete Placement on the Home Building Timeline at AA-6
X-DriveWay, Asphalt
DriveWay, Asphalt on the Home Building Timeline at C-23
X-DriveWay, Clay-Gravel
DriveWay, Clay-Gravel on the Home Building Timeline at C-23
X-DriveWay, Concrete
DriveWay, Concrete on the Home Building Timeline at C-23
X-DriveWay, Crushed Stone
DriveWay, Crushed Stone on the Home Building Timeline at C-23
X-DriveWay, Natural Earth
DriveWay, Natural Earth on the Home Building Timeline at C-23
X-DriveWay, Permanent, Rough-in
DriveWay, Permanent, Rough-in on the Home Building Timeline at V-3
X-DriveWay, Temporary - Designate Location
DriveWay, Temporary - Designate Location on the Home Building Timeline at II-7
X-DriveWay, Temporary - for Construction Vehicles and Equipment
DriveWay, Temporary - for Construction Vehicles and Equipment on the Home Building Timeline at II-6
X-DriveWay, Temporary, Excavation
DriveWay, Temporary, Excavation on the Home Building Timeline at V-2
X-DuctWork & Air FloW - Best Practice for Flexible Duct
DuctWork & Air FloW - Best Practice for Flexible Duct on the Home Building Within the diagram beginning at FF-15
X-DuctWork - Finished Installation
DuctWork - Finished Installation on the Home Building Timeline at V-8
X-DuctWork Rough In
DuctWork Rough In : on the Home Building Timeline at DD-15
Easement
Easement on the Home Building Timeline at C-4, H-4, G-10, M-19; also throughout the diagram centered at D-3; also see BEADS KEYSTONE,
A NO-BUILD-ZONE, an Easement is an area of property used to preserve aspects of infrastructure, usually for multiple properties. No construction is ever alloWed Within an easement. No obstruction, such as fallen trees or the build up of discarded yard trimmings, etc., are ever alloWed to remain, and must be removed immediately.
The most common easement is a Drainage Easement, Which directs the floW of rain Water in a manner to prevent flooding of or Water damage to properties affected by the easement.
Easement, Centerline
Easement, Centerline on the Home Building Timeline Within the diagram beginning at A-12
Easement, FloWage
Easement, FloW-age on the Home Building Timeline at FF-4
Easement, Sanitary SeWer
Easement, Sanitary SeWer on the Home Building Timeline at A-8
Electric PoWer Installation, Temporary
Electric PoWer Installation, Temporary on the Home Building Timeline at II-8
Electrical, Label All Circuits
Electrical, Label All Circuits on the Home Building Timeline at V-8
There's nothing so frustrating or time Wasting as attempting to determine Which circuit just tripped off.
Right noW, While the electrician is still on-site, label each circuit, specifically, for What it poWers, Whether a certain bedroom's outlets, or the refrigerator, or the AC unit, etc.
There Will never be a better time.
Elevator Pit & Related Sump Pit
Elevator Pit & Related Sump Pit on the Home Building Timeline at W-3
Erosion by Water on the Home Building Timeline at QQ-1
Erosion, Cliff
Erosion, Cliff on the Home Building Timeline Within the diagram beginning at NN-5
Erosion, Shore
Erosion, Shore on the Home Building Timeline Within the diagram beginning at NN-5
Excavate for Basement
Excavate for Basement - on the Home Building Timeline at W-1
Excavate for CraWlspace
Excavate for CraWlspace on the Home Building Timeline at T-3
Extent of Structure
Extent of Structure on the Home Building Timeline.at G-7, H-13, S-25, Q-26, R-26, S-26, T-26
In the BEADS KEYSTONE at H-13
Diagrammed at at S-25, T-26
ALLOWED EXTENT OF STRUCTURES :The applied ‘extent’ of a structure is the part alloWed to touch, but not cross a building line. Rules vary. The extent considered might be the edge of Walls, footings, any overhangs, decks, patios, stoops, steps, eaves, arbors, and more. CHECK CAREFULLY.
Exterior Look and Style
Exterior Look and Style on the Home Building Timeline in the diagram beginning at W-21
Exterior Surfacing & trim Materials - Order for Delivery
Exterior Surfacing & trim Materials - Order for Delivery on the Home Building Timeline at W-19
Exterior Wall Surfaces, Blend
Exterior Wall Surfaces, Blend on the Home Building Timeline in the diagram beginning at CC-10
Exterior Wall Surfaces, Match
Exterior Wall Surfaces, Match on the Home Building Timeline in the diagram beginning at CC-10
Face Plate ScreW Slots
Face Plate ScreW Slots on the Home Building Timeline at Z-13, AA-13, AA-14
Fast Water
Fast Water on the Home Building Timeline at CC-25, QQ-2, diagram beginning at NN-5
Feel of the Plan
Feel of the Plan on the Home Building Timeline at W-24, discussed at W-25
Financing - Construction Loan - Arrange With Lender
Financing - Construction Loan - Arrange With Lender on the Home Building Timeline at HH-19
Fire Watch
Fire Watch on the Home building Timeline at CC-3, DD-15, FF-16
Fitting NeW Addition to Older Structure
Fitting NeW Addition to Older Structure on the Home Building Timeline at JJ-22
Float AWay Resistance
Float AWay Resistance on the Home Building Timeline at BB-16
Floor Edge Alignment With Beam and Column
Floor Edge Alignment With Beam and Column on the Home Building Timeline at O-24
FloW-age Easement
FloW-age Easement on the Home Building Timeline at FF-4
Fly AWay Resistance
Fly AWay Resistance on the Home Building Timeline at BB-16
Footing, Isolated CraWlspace
Footing, Isolated CraWlspace on the Home Building Timeline at R-12, S-12
Forced Land Pooling
Forced Land Pooling on the Home Building Timeline at I-17 to J-17; and H-20
Part of Oil and Gas Rights of OWnership at I-17 to J-17; and Hazards of Site Selection at H-20.
Form : Basement Walls
Form : Basement Walls on the Home Building Timeline at Q-9
Form : Storm Shelter Walls
Form : Storm Shelter Walls on the home building Timeline at Q-9
Form Work Check
Form Work Check on the Home Building Timeline at S-5
Form Work, Remove
Form Work, Remove on the Home Building Timeline at R-15
Form, DriveWay Concrete
Form,DriveWay Concrete on the Home Building Timeline at BB-6
Foundation BloW Out Prevention
Foundation BloW Out Prevention on the Home Building Timeline at Q-12
Fractions in Dimensions - Why?
Fractions in Dimensions - Why? on the Home Building Timeline at U-22, U-23
Framing Materials - Order for Delivery
Framing Materials - Order for Delivery on the Home Building Timeline at Q-8
Includes Floors, Walls, ceilings, and roof
Framing, Begin for Walls, Ceiling, Roof
Framing, Begin for Walls, Ceiling, Roof on the Home Building Timeline at V-19
Front Building Line
Front Building Line on the HomeBuildingTimeline at E4 and E5.
Also see BEADS Keystone
The FRONT BUILDING LINE, also knoW as the front setback line, marks the point on any given property that is the nearest to the Front property line Where a structure may be built.
MEASURING THE FRONT BUILDING LINE : The Front Building Line cannot measured from the street. the curb, the edge of the pavement, or the edge of the road. It must be measured from the property linedesignated as the Front of the lot. If you are unable to determine the exact location of the Front Property Line, then find a professional Who can offer assistance.
Front Setback Line
Front Setback Line on the Home Building Timeline at B-9, C-9, E4, E5.
The FRONT SETBACK LINE, also knoWn as the front building line, marks the point on any given property that is the nearest to the Front property line Where a structure may be built.
MEASURING THE FRONT Setback LINE : The Front Setback Line is NOT measured from the street. the curb, the edge of the pavement, or the edge of the road. It must be measured from the property linedesignated as the Front of the lot. If you are unable to determine the exact location of the Front Setback Line, then find a professional Who can offer assistance.
Furniture
Furniture - AlloW enough room - on the Home Building Timeline at X-25
Garage Size
Garage Size on the Home Building Timeline at I-9, NN-9, OO-9, PP-9, QQ-9, RR-9, SS-8, UU-9, VV-9, WW-9, X-26
Green Building Measure : Waterproofing Chemicals, Capture and Contain Residue
Green Building Measure : Waterproofing Chemicals, Capture and Contain Residue on the Home Building Timeline at R-14
Green Building Verifier
Green Verifier on the Home Building Timeline at EE-11, II-7, U-10, II-16, V-19
Guesstimate
Guesstimate on the Home Building Timeline at H-9
This is a slang reference to the attempt to estimate the final construction cost too early in the process, When there's not enough information available. It is a GUESS at an ESTIMATE.
Habitat Regulations, Wildlife
Habitat Regulations,Wildlife on the Home Building Timeline at FF-4, I-20
Habitat, Sea Turtle
Habitat, Seaside On the Home Building Timeline at M-16
Landscape Features, Mark on the Home Building Timeline at II-8, JJ-8
Landscaping : 'Live' Plant Barriers & Wrapping for Protection
Landscaping : 'Live' Plant Barriers & Wrapping for Protection on the Home Building Timeline at II-7
Lender, Arrange Construction Loan With
Lender, Arrange Construction Loan With on the Home Building Timeline at HH-19
Light, Color of
Light, Color of on the Home Building Timeline at W-8
Living Area
Living Area is part of the definition for Interior Area on the Home Building Timeline at R-25.
Living Area includes all Walls needed to enclose the heated and cooled area of a house, Whereas Interior Area is only the empty space in any given room or group of rooms.
Load Bearing Structure & Wall Identification
Load Bearing Structure & Wall Identification on the Home Building Timeline at GG-22
Look of the Plan and House
Look of the Plan and House on the Home Building Timeline at W-24, discussed at V-25, W-25
Manifold, Hot Water Plumbing
Manifold, Hot Water Plumbing on the Home Building Timeline Within the on-timeline article, Hot Water Plumbing: The Manifold beginning beginning at FF-11
Mark Trees and Landscape Features
Mark Trees and Landscape Features on the Home Building Timeline at II-8, JJ-8
Markers, Warning
Markers, Warning on the Home Building Timeline at V-4
Masonry Work, Brick Work, and Stone Work
Masonry Work, Brick Work, and Stone Work on the Home Building Timeline at EE-10
Match Exterior Wall Surfaces
Match Exterior Wall Surfaces on the Home Building Timeline in the diagram beginning at CC-10
Match NeW With Old
Match NeW With Old on the Home Building Timeline at DD-13
Material Selection, Match NeW to Old
Material Selection, Match NeW to Old on the Home Building Timeline at DD-13
Mechanical - Definition
Mechanical - Definition : Refers to all equipment related to the infrastructure of a house for the purpose of moving air and fluids. This includes HVAC (heating, ventilation, and air conditioning) connections, duct-Work, and equipment, such as air handlers, furnaces, compressors, and humidifier/dehumidifier units. It also includes all plumbing pipes, fittings, and valves.
Meeting of the Minds
Meeting of the Minds on the Home Building Timeline atII-9, S-22, S-23
Mesh, Wire and Steel Rods for Reinforcing
Mesh, Wire and Steel Rods for Reinforcing on the Home Building Timeline at Q-10
Moisture Shield on Masonry Wall Tops
Moisture Shield on Masonry Wall Tops on the Home Building Timeline at Q-13
Moment of Force / Work Load
Moment of Force / Work Load on the Home Building Timeline at AA-17
Monkey See Monkey Do (also see MSMD)
Monkey See Monkey Do : An actual but Wrong method of construction-cost calculation performed by an incompetent builder Who is copying other incompetent builders, none of Whom has any knoWledge of construction costs Whatsoever.
Moving Around In The House
Moving Around In The House on the Home Building Timeline at V-24, discussed at W-23
Overhead PoWer Line Location Verification on the Home Building Timeline at O-23
Overhead Utility Wiring
Overhead Utility Wiring on the Home Building Timeline at I-3
OWn, What You
OWn, What You on the Home Building Timeline at M-15; partial list at H-17
OWnership
OWnership partially listed on the Home Building Timeline at H-17
Parking - Vehicle - Indoor Clearances
Parking - Vehicle - Indoor Clearances on the Home Building Timeline Within the diagram beginning at OO-10
Parking Area, Permanent, Rough-in
Parking Area, Permanent, Rough-in on the Home Building Timeline at V-3
Parking Area, Temporary, Excavation
Parking Area, Temporary, Excavation on the Home Building Timeline at V-2
Party for Planning With Subcontractors
Party for Planning With Subcontractors on the Home Building Timeline at KK-9, and described at MM-10
Permafrost ThaW
Permafrost ThaW on the Home Building Timeline Within Hazards of Site Selection at H-18, and SITE HAZARDS at M-16
Pier Strength
Pier Strength on the Home Building Timeline at T-16 Within the on-timeline article.
Plan RevieW
Plan RevieW on the Home Building Timeline at II-18, described at MM-16
Plat Restrictions
Plat Restrictions on the Home Building Timeline at F-9, Within BEADS Keystone at H-10, and SITE HAZARDS at I-19, and M-16
Plumbing Manifold, Hot Water
Plumbing Manifold, Hot Water on the Home Building Timeline Within the on-timeline article beginning at FF-11
Plumbing Trim-Out
Plumbing Trim-Out on the Home Building Timeline at W-6
Pole, PoWer
Pole, PoWer on the Home Building Timeline atI-3
Pond, Retention
Pond,Retention on the Home Building Timeline at QQ-4
Ponding in a CraWlspace
Ponding in a CraWlspace on the Home Building Timeline at T-4
PoWer Line Location Verification, Overhead
PoWer Line Location Verification, Overhead on the Home Building Timeline at O-23
PoWer Service Installation
PoWer Service Installation on the Home Building Timeline at BB-2
PoWer Vents - Order for Delivery
PoWer Vents - Order for Delivery on the Home Building Timeline at W-19
Proceed, Official Letter to
Proceed, Official Letter to : on the Home Building Timeline at II-11
Property Boundary Line
Property Boundary Line on the Home Building Timeline Within the diagram centered at D-3, shoWn as the thick White line; and Within the diagram centered at C-8., Within the on-timeline article SITE LINES at F-6; and Within the BEADS Keystone at H-10, I-10, L-12
Property Line
Property Line on the Home Building Timeline at B-10, C-10, D-10
Also Within the diagram centered at D-3, shoWn as the thick White line.
Also Within the diagram centered at C-8.,
Article SITE LINES at F-6; and Within the BEADS Keystone at H-10, I-10, L-12
Also at A-15, A-16
Property Line Verification
PropertyLine Verification on the Home Building timeline at HH-8
Protection for Live Plants
Protection for Live Plants on the Home Building Timeline at II-7
Protection of Tree Branches
Protection of Tree Branches on the Home Building Timeline atII-5
Radon Venting, CraWlspace Pipe Installation for : on the Home Building Timeline at T-18
Recreational Vehicle (RV)
Recreational Vehicle (RV) on the Home Building Timeline at F-11, Within the diagram centered at SS-14
Regulations, Wildlife Habitat
Regulations,Wildlife Habitat on the Home Building Timeline at FF-4, I-20
Reinforcing Wire Mesh and Steel Rods
Reinforcing Wire Mesh and Steel Rods on the Home Building Timeline at Q-10
Restrictions, Plat
Restrictions, Plat on the Home Building Timeline at F-9, Within BEADS Keystone at H-10, and SITE HAZARDS at I-19, and M-16
Right-of-Way
Right of Way on the Home Building Timeline at E-4, E-5, also Within the on-timeline article, SITE LINES at F-6. Also diagrammed at B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16
A Right-of-Way (ROW) for a street, road, or highWay is a special parcel of land. A road ROW sits beside and betWeen other parcels of property. Some examples are streets, interstate highWays, railroad tracks, gas lines, and poWer lines.
A Right-of-Way for utilities is a special type of easement, and may pass through a privately oWned parcel of land. In such a case, the landoWner still possesses the land, but is not alloWed to ever build Within the ROW. Examples are gas pipelines, poWerlines, and other utilities like cable television and telephone; and driveWays alloWing one oWner to cross another oWner's land.
Roof
Roof on the Home Building Timeline at AA-18, AA-19, EE-12, I-21, K-21, K-23, S-17, W-22, Z-16.
Roof - NEVER NeW Over Old
Roof - NEVER NeW Over Old on the Home Building Timeline at CC-19
Roof Plane Intersection and RainWater Run Off
Roof Plane Intersection and RainWater Run Off on the Home Building Timeline at V-20
Root Line
Root Line on the Home Building Timeline Within the diagram centered at FF-6
ROW or Right of Way
ROW or Right of Way on the Home Building Timeline at E-4, E-5, also Within the article, SITE LINES at F-6. Also diagrammed at B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16
A Right-of-Way (ROW) for a street, road, or highWay is a special parcel of land. A road ROW sits beside and betWeen other parcels of property. Some examples are streets, interstate highWays, railroad tracks, gas lines, and poWer lines.
A Right-of-Way for utilities is a special type of easement, and may pass through a privately oWned parcel of land. In such a case the landoWner still possesses the land, but is not alloWed to ever build Within the ROW. Examples are gas pipelines, poWerlines, and other utilities like cable television and telephone; and driveWays alloWing one oWner to cross another oWner's land.
RV (Recreational Vehicle)
RV (Recreational Vehicle) on the Home Building Timeline at F-11, Within the diagram centered at SS-14
Sanitary SeWer Easement
Sanitary SeWerEasement on the Home Building Timeline at A-8
ScreW Slots, Face Plate
ScreW Slots, Face Plate on the Home Building Timeline at Z-13, AA-13, AA-14
Setback Line
SETBACK LINE on the Home Building Timeline in the diagram centered at A-18, D-3, B-7, B-9, C-7, C-9, D-7.
A SETBACK line is measured from a property line, Whether front, side, or rear.
Hire a professional surveyor to help find the property line, first, then the setback lines.
SeWage Disposal, Onsite
SeWage Disposal, Onsite on the Home Building Timeline at JJ-12
Shade & ShadoW Restrictions
Shade & ShadoW Restrictions on the Home Building Timeline at CC-26
ShadoW-Lines
ShadoW Lines on the Home Building Timeline at W-24.
Within HomeBuildingTimeline.com, search for the topic ShadoWs.
Shore Erosion on the Home Building Timeline Within the diagram beginning at NN-5
Shoring for BloW Out Prevention
Shoring for BloW Out Prevention on the Home Building Timeline at Q-12
Shoring, Counter
Shoring, Counter on the Home Building Timeline at V-4
This is not about a kitchen or bath counter. This is about balancing force to keep a Wall from collapsing, during renovation,or demolition.
ShoWer Door Measurements
ShoWer Door Measurements on the Home Building Timeline at Z-6
SideWalk
SideWalk on the Home Building Timeline at G-5
SideWalk, Public
SideWalk, Public on the Home Building Timeline at E-5, A-15, D-15, A-16, D-16
Sill Plates on Top of Masonry Walls, Check - Square and Level
Sill Plates on Top of Masonry Walls, Check - Square and Level on the Home Building Timeline at Q-14
Sill Plates on Top of Masonry Walls, Install
Sill Plates on Top of Masonry Walls, Install on the Home Building Timeline at Q-14
Silt Fence Installation
Silt Fence Installation on the Home Building Timeline at II-8, Y-2
No physical materail is alloWed to cross over any property line, Whether saWdust, gravel, cement & mortar particles, lunch trash, human & animal Waste, spilled paint, nails & screWs, dryWall bits & flakes, even muddy Water.
II-8 : Install primary silt fence for initial control of erosion and rain-Water run-off from the property.
Y-2 : Install any needed additional Silt Fencing to assure full control of rain-Water run-off.
SloW Water
SloW Water on the Home Building Timeline at QQ-3, and Within the diagram beginning at NN-5
SnoW
SnoW on the Home Building Timeline at JJ-12
SnoW and Ice Weight
SnoW and Ice Weight on the Home Building Timeline at Z-18
SnoW Melt
SnoW Melt on the Home Building Timeline at CC-25
Solar Rights
Solar Rights on the Home Building Timeline at I-17; and Within the topic SOLAR ENERGY INVESTMENT PROTECTION LAWS
Stair - Wall Stringer, Decorative
Stair - Wall Stringer, Decorative on the Home Building Timeline at MM-26
Stair - Wall Stringer, Structural
Stair - Wall Stringer, Structural on the Home Building Timeline at NN-24
Stair Stringer
Stair Stringer on the Home Building Timeline at NN-24, MM-26
A Structural Stringer supports the Weight of the movement on the stairs of people and possessions.
A Decorative Stringer looks pretty but is non-load-bearing.
Stair Winder
Stair Winder on the Home Building Timeline at VV-25
StairWay Anatomy
StairWay Anatomy on the Home Building Timeline at OO-25
Steel Rods and Wire Mesh for Reinforcing on the Home Building Timeline at Q-10
Stone Work, Brick Work, and Masonry Work
Stone Work, Brick Work, and Masonry Work on the Home Building Timeline at EE-10
Stop and Think
Stop, and Think on the Home Building Timeline EVERYWHERE.
"Thinking" is the second least-used tactic in the planning and construction process. The first least-employed tactic is stopping to do it.
Building anything dWelling-related is a hurried, high-pressure, higher-expectations, highest-emotional-state experience. 'Reason' is replaced by anxiety; and bad decision-making folloWs, naturally. The cure is to give yourself a moment to consider options. So, stop and think.
Learn these phrases and use them often:
"This doesn't seem right. I need some time to think about it."
"Let's look at that more closely."
"HoW can We fix this problem?"
Gain the high ground in any situation by seizing the moment to stop and think.
Concerning every aspect of this project :
If you're unsure, stop and become certain.
If a thing is unknoWn to you, stop and learn about it.
When a mistake is made, by you or others, stop and find of a solution.
The key Word is STOP. Don't Worry if people around you are impatient. Stand firm, as you actively seek positive solutions. -AB
Storage, Garage
Storage, Garage on the Home Building Timeline at SS-9, Within the Vehicle Diagrams centered on RR-13, SS-15, RR-20
Storage, Kitchen
Storage, Kitchen on the Home Building Timeline at X-8, and Within the article centered on Z-9
Storm Shelter Excavation
Storm Shelter Excavation on the Home Building Timeline at W-2
Storm Shelter, Placed Concrete for Walls
Storm Shelter, Placed Concrete for Walls on the Home Building Timeline at Q-13
Storm Shelter, Wall Forms for Near-Future Placed Concrete for
Storm Shelter, Wall Forms for Near-Future Placed Concrete for on the Home building Timeline at Q-9
Style, Exterior
Style, Exterior on the Home Building Timeline in the diagram beginning at W-21
Sump Pit Excavation
Sump Pit Excavation on the Home Building Timeline at W-2, W-3
Super Genius
Super Genius
Andy Noel founder of ProSauraSystems.com is one. He created the mechanism for this Index.
Sander de Wijs (de-Veihs for Americans) oWner of The Netherlands-based Degrinthorst.nlis chief of programming, and also a super genius. He Writes all of the code to make HomeBuildingTimeline.com function.
SWimming Pool
SWimming Pool on the Home Building Timeline at A-2, F-11, II-5
Temporary Electric PoWer Installation
Temporary Electric PoWer Installation on the Home Building Timeline at II-8
Tennis Court
Tennis Court on the Home Building Timeline at II-5
Termite Barrier
Termite Barrier on the Home building Timeline at FF-9, and Within the Article TERMITES beginning at N-11, N-12, Q-12
Termite Shield on Masonry Wall Tops
Termite Shield on Masonry Wall Tops on the Home Building Timeline at Q-13
Termites
Termites on the Home building Timeline at FF-9, and Within the on-timeline article TERMITES beginning at N-11
Test Well Water for Safety
Test Well Water for Safety on the home Building Timeline at DD-9
Texting
Texting on the Home Building Timeline at MM-15
Inside HomeBuildingTimeline.com Within the articles:
Tree - Closest Proximity for Construction on the Home Building Timeline Within the diagram centered on KK-6
Tree Branch Protection
Tree Branch Protection on the Home Building Timeline atII-5
Trees, Mark
Trees, Mark on the Home Building Timeline at II-8, JJ-8
Trust ONLY NeW Measurements
Trust ONLY NeW Measurements on the Home Building Timeline at O-23
USDA Mortgage & Plan Requirements
USDA Mortgage & Plan Requirements : The information and documentation required to qualify for, and process a USDA home loan.
The list is extensive and includes detailed financial information, land survey and title-of-oWnership documentation, and assurance documentation proving compliance With all applicable building codes, energy codes, and design standards.
Usefulness, Kitchen
Usefulness, Kitchen on the Home Building Timeline at X-8, and Within the article centered on Z-9
Vehicle Parking, Indoor Clearances for
Vehicle Parking, Indoor Clearances for on the Home Building Timeline Within the diagram beginning at OO-10, QQ-20, TT-19, X-26
Vehicle, Overhead Clearance for
Vehicle, Overhead Clearance for : on the Home Building Timeline Within the diagrams beginning at OO-10, 00-14, 00-17, 00-19, QQ-20, TT-19
Walk-Through, Final Inspection
Walk-Through, Final Inspection on the Home Building Timeline at Z-13
WalkWay Concrete Placement
WalkWay Concrete Placement on the Home Building Timeline at AA-6
Wall Strength
Wall Strength on the Home Building Timeline at W-16
Wall Surface, Interior, Final Installation
Wall Surface, Interior, Final Installation on the Home Building Timeline at DD-8
Wall Surface, Interior, Order Materials
Wall Surface, Interior, Order Materials on the Home Building Timeline at EE-12
Warning Markers
Warning Markers on the Home Building Timeline at V-4
Waste Disposal
Waste Disposal on the Home Building Timeline at CC-25, also BEADS Keystone : SeWage
Water Rights
Water Rights on the Home Building Timeline at J-17 Within the topic OWNERSHIP.