Only well-informed people can live securely in their homes


A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z


Look up Word (type part or all of word in the box below):
 
 


About this HomE Building TimElinE by Andy BozEman

E="font-sizE: mEdium;">About this HomE Building TimElinE by Andy BozEman on thE HomE Building TimElinE at JJ-24

E="font-sizE: mEdium;"> ArticlE : Ef="http://homEbuildingtimElinE.com/about-homEbuildingtimElinE-com/" targEt="_blank">About HomE Building TimElinEE="font-sizE: mEdium;"> 

   
AccEss for PErmanEntly InstallEd LargE MachinEry and EquipmEnt

E="font-sizE: mEdium;">AccEss for PErmanEntly InstallEd LargE MachinEry and EquipmEnt on thE HomE Building TimElinE at X-19

   
AccEss Rights - EasEmEnts

E="font-sizE: mEdium;">AccEss Rights - EasEmEnts on thE HomE Building TimElinE at G-10, G-11

   
AccEssibility - WhEElchair Van AccEss

E="font-sizE: mEdium;">AccEssibility - WhEElchair Van AccEss on thE HomE Building TimElinE in thE diagram bEginning at PP-19

   
Addition - Fitting NEw to Old

E="font-sizE: mEdium;">Addition - Fitting NEto Old on thE HomE Building TimElinE at JJ-22

   
Addition CodE CompliancE

E="font-sizE: mEdium;">Addition CodE CompliancE on thE HomE Building TimElinE at O-21

   
AddrEss Sign Installation

E="font-sizE: mEdium;">AddrEss Sign Installation on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-9

   
AdjustmEnts, UnExpEctEd

E="font-sizE: mEdium;">AdjustmEnts, UnExpEctEd on thE HomE Building TimElinE E="font-family: Tahoma;">at Q-10, U-10, CC-18, EE-11, II-16, II-17, Y-15

   
AdvancEd PrEliminary

E="font-sizE: mEdium;">AdvancEd PrEliminary on thE HomE Building TimElinE at DD-23, EE-25

   
AffordablE

E="font-sizE: mEdium;">AffordablEE="font-sizE: mEdium;"> : ArticlEs concErning EffEctivE cost control for building of nEw homEs, additions, rEmodEling, and rEnovations arE within thE HomE Building TimElinE catEgory Ef="https://homEbuildingtimElinE.com/topic/affordablE/" targEt="_blank">E="font-sizE: mEdium;">AFFORDABLEE="font-sizE: mEdium;">.

   
Aging In PlacE

E="font-sizE: mEdium;">Aging In PlacE on thE HomE Building TimElinE at V-23, X-26 and FF-22; and in thE catEgory  E="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/topic/aging-in-placE/" targEt="_blank">Aging-In-PlacE

   
Air Conditioning and HEating EquipmEnt - FinishEd Installation

E="font-sizE: mEdium;">Air Conditioning and HEating EquipmEnt - FinishEd InstallationE="font-wEight: bold;"> on thE HomE Building TimElinE at V-8

   
Air Flow - BEst PracticE for FlExiblE Duct

E="font-sizE: mEdium;">Air Flow - BEst PracticE for FlExiblE Duct on thE HomE Building within thE diagram bEginning at FF-15

   
Air TEmpEraturE and Humidity

E="font-sizE: mEdium;">Air TEmpEraturE and HumidityE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">W-26

   
Air TEst, Piping - Gas / PropanE / WatEr LinE

E="font-sizE: mEdium;">Air TEst, Piping - Gas / PropanE / WatEr LinE on thE HomE Building TimElinE at EE-14

   
AllowEd Building ArEa

E="font-sizE: mEdium;">AllowEd Building ArEa on thE HomE Building TimElinE at D-1, HH-22

E="font-sizE: mEdium;"><Em>Also sEE BEADS KEystonEEm>

   
AltitudE Rights

E="font-sizE: mEdium;">AltitudE RightsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">H-18

   
Aluminum Corrosion

E="font-sizE: mEdium;">Aluminum Corrosion In HomEBuildingTimElinE.com within thE articlE Avoid Aluminum FailurE by thE SEa

E="font-sizE: mEdium;">Also sEE Early SpEcifications & MatErial SElEction on thE HomE Building TimElinE at EE-22, FF-25

E="font-sizE: mEdium;">ArticlEE="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/avoid-aluminum-failurE-by-thE-sEa/" targEt="_blank">Aluminum FailurE by thE SEa

   
Analysis, Soil

E="font-sizE: mEdium;">Analysis, Soil on thE HomE Building TimElinE at S-21

   
Anchor PanEls, Wall

E="font-sizE: mEdium;">Anchor PanEls, Wall on thE HomE Building TimElinE at DD-9

   
Anchoring, Column / Post / PiEr

E="font-sizE: mEdium;">Anchoring, Column / Post / PiEr on thE HomE Building TimElinE at U-17

   
Anchors, Installation of Structural

E="font-sizE: mEdium;">Anchors, Installation of Structural on thE HomE Building TimElinE at U-18

   
Andy BozEman

E="font-sizE: mEdium;">Andy BozEmanE="font-sizE: mEdium;"> - ThE rEsults of thE work of Andy BozEman is all ovEr HomE Building TimElinE bEcausE hE wrotE it and drEw all thE illustrations. Good job, Andy !

   
Appraisal for Existing HousE with PlannEd ChangEs, Prior to PurchasE

E="font-sizE: mEdium;">Appraisal for Existing HousE with PlannEd ChangEs, Prior to PurchasE on thE HomE Building TimElinE at K-11

E="font-sizE: mEdium;">It's ExpEnsivE to prE-appraisE EvEry housE you might considEr for purchasE, so don't. But, as soon as all candidatE propErtiEs arE narrowEd to only onE, it could bE vEry ExpEdiEnt to ascErtain both prEsEnt and futurE valuE, basEd on any plannEd rEnovations.

E="font-sizE: mEdium;">A littlE monEy spEnt now to gain critical knowlEdgE, EvEn if it lEads to cancElling thE projEct and purchasE, could savE a fortunE, as wEll as avErt yEars of potEntial hEartachE.

   
Appraisal for REnovation, PrEliminary

E="font-sizE: mEdium;">Appraisal for REnovation, PrEliminary on thE HomE Building TimElinE at JJ-9

   
Approval

E="font-sizE: mEdium;">Approval on thE HomE Building TimElinE at JJ-15

   
Approval, Early PrEliminary

E="font-sizE: mEdium;">Approval, Early PrEliminary on thE HomE Building TimElinE at EE-21, EE-22

   
Approval, Final DocumEnt PrEparation for

E="font-sizE: mEdium;">Approval, Final DocumEnt PrEparation for : on thE HomE Building at FF-21, FF-22

   
ArchitEct / DEsignEr / PlannEr / DraftEr, About

E="font-sizE: mEdium;">ArchitEct / DEsignEr / PlannEr / DraftEr, About on thE HomE Building TimElinE at BB-24,BB-25

   
ArchitEct / DEsignEr / PlannEr / DraftEr, MEEt

E="font-sizE: mEdium;">ArchitEct / DEsignEr / PlannEr / DraftEr, MEEt on thE HomE Building TimElinE at BB-24,BB-25

   
ArchitEct / DEsignEr / PlannEr / DraftEr, PrEparE to MEEt

E="font-sizE: mEdium;">ArchitEct / DEsignEr / PlannEr / DraftEr, PrEparE to MEEt on thE HomE Building TimElinE at AA-24, discussEd at Z-25, AA-25

   
ArchitEctural Control CommittEE Plan Submission

E="font-sizE: mEdium;">ArchitEctural Control CommittEE Plan Submission on thE HomE Building TimElinE at E="font-family: Tahoma;">II-17

   
ArchitEctural REviEw CommittEE Plan Submission

E="font-sizE: mEdium;">ArchitEctural REviEw CommittEE Plan Submission on thE HomE Building TimElinE at E="font-family: Tahoma;">II-17

   
ArEa : SquarE fEEt vs SquarE MEtErs

E="font-sizE: mEdium;">AREA - HomE Building TimElinE rEfErs to arEa calculations basEd on SquarE FEEt bEcausE thE primary targEt-rEadErs livE in thE UnitEd StatEs. SquarE fEEt for ArEa and MEasurEmEnt is a componEnt of thE ImpErial MEasurEmEnt SystEm.

E="font-sizE: mEdium;">Almost all thE rEst of thE world usEs thE MEtric MEasurEmEnt SystEm, a far supErior mEthod.  MEtric mEasurEmEnts arE EasiEr and fastEr to dEtErminE, and vastly rEducE thE probability or Error.

   
ArEa, ExtErior

E="font-sizE: mEdium;">ArEa, ExtErior on thE HomE Building TimElinE at R-25

   
ArEa, Flat

E="font-sizE: mEdium;">ArEa, Flat on thE HomE Building TimElinE at R-25

   
ArEa, IntErior

E="font-sizE: mEdium;">ArEa, IntErior on thE HomE Building TimElinE at R-25

   
ArEa, Living

E="font-sizE: mEdium;">ArEa, Living is part of thE dEfinition for IntErior ArEa on thE HomE Building TimElinE at R-25.

E="font-sizE: mEdium;">Living ArEa includEs all walls nEEdEd to EnclosE thE hEatEd and coolEd arEa of a housE, whErEas IntErior ArEa is only thE Empty spacE in any givEn room or group of rooms.

   
ArEa, Total SquarE FootagE

E="font-sizE: mEdium;">ArEa, Total SquarE FootagE on thE HomE Building TimElinE at H-9

   
ArEa, VolumE

E="font-sizE: mEdium;">ArEa, VolumE on thE HomE Building TimElinE at R-25

   
Arrow, North

E="font-sizE: mEdium;">Arrow, North  on thE HomE Building TimElinE at E-8

   
As-Built MEasurEmEnt VErification

E="font-sizE: mEdium;">As-Built MEasurE VErification on thE HomE Building TimElinE at DD-8.

E="font-sizE: mEdium;">This notE's instructions arE locatEd at CC-9

   
AttEntion Span

E="font-sizE: mEdium;">AttEntion Span on thE HomE Building TimElinE at MM-12

   
Attic & Roof PassivE VEnts - OrdEr for DElivEry

E="font-sizE: mEdium;">Attic & Roof PassivE VEnts - OrdEr for DElivEry on thE HomE Building TimElinE at W-19

   
Attic Insulation

E="font-sizE: mEdium;">Attic Insulation on thE HomE Building TimElinE at W-15, EE-12

   
AvalanchE

E="font-sizE: mEdium;">AvalanchE on thE HomE Building TimElinE at Z-8

   


 
Backfill

E="font-sizE: mEdium;">Backfill on thE HomE Building TimElinE at R-16; dEscribEd at S-14

   
Backfill ExplainEd

E="font-sizE: mEdium;">Backfill ExplainEd on thE HomE building TimElinE at  S-14

E="font-sizE: mEdium;">Application at R-16

   
Balloon MortgagE

E="font-sizE: mEdium;">Balloon MortgagE :E="font-sizE: mEdium;"> At thE End of thE initial phasE of a sub-primE mortgagE, in which monthly paymEnts arE kEpt artificially low, paymEnts Expand suddEnly, ovErnight or "balloon" to many timEs thE original paymEnt amount. ThosE pEoplE who borrow such a Balloon MortgagE find thEmsElvEs unablE to makE thE vEry high paymEnts Each month, and arE forcEd into forEclosurE. BE hErE warnEd to NEVER bEcomE part of such a financial arrangEmEnt.

E="font-sizE: mEdium;">Ef="https://www.amazon.com/GHOST-BUBBLE-Andy-BozEman-Ebook/dp/B01M1Y3IL0/rEf=sr_1_5?s=digital-tExt&iE=UTF8&qid=1528018326&sr=1-5" targEt="_blank">SEE GHOST BUBBLE, an Amazon KindlE EBook

   
BarriEr, TErmitE

E="font-sizE: mEdium;">BarriEr, TErmitE on thE HomE Building TimElinE at FF-9, N-12, O-12, Q-12

   
BasEmEnt Excavation

E="font-sizE: mEdium;">BasEmEnt ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">W-1

   
BasEmEnt Flooding

E="font-sizE: mEdium;">BasEmEnt Flooding on thE HomE Building TimElinE at T-4

   
BasEmEnt Wall Forms for PlacEd ConcrEtE

E="font-sizE: mEdium;">BasEmEnt Wall Forms for PlacEd ConcrEtE on thE HomE Building TimElinE at Q-9

   
BasEmEnt Wall Tops Contact BarriEr

E="font-sizE: mEdium;">BasEmEnt Wall Tops Contact BarriEr on thE HomE Building TimElinE at Q-13

   
BasEmEnt Wall Tops MoisturE ShiEld

E="font-sizE: mEdium;">BasEmEnt Wall Tops MoisturE ShiEld on thE HomE Building TimElinE at Q-13

   
BattEr Board Installation

E="font-sizE: mEdium;">BattEr Board InstallationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">U-3

   
BattEr Board ProtEction

E="font-sizE: mEdium;">BattEr Board ProtEctionE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">U-3

   
BEADS KEystonE

E="font-sizE: mEdium;">BEADS KEystonE on thE HomE Building TimElinE dEscribEd, bEginning at H-10, implEmEntEd at L-10.

E="font-sizE: mEdium;">This contains thE MOST CRITICAL quEstions, which must bE askEd as if thE EntirE BEADS KEystonE is onE stEp.

E="font-sizE: mEdium;">This is thE most critical aspEct of sitE sElEction, and construction. ThE BEADS KEystonE is applicablE throughout thE EntirE procEss of homE planning, building, rEmodEling, flipping, and sElling.

E="font-sizE: mEdium;">FurthEr, thE BEADS KEystonE ExtEnds into thE futurE, aftEr movE-in, and affEcts EvEry aspEct of homE maintEnancE, comfortablE living, and pEacEful EnjoymEnt.

   
BEam AlignmEnt with Column and Floor EdgE

E="font-sizE: mEdium;">BEam AlignmEnt with Column and Floor EdgE on thE HomE Building TimElinE at O-24

 

   
BEam StrEngth

E="font-sizE: mEdium;">BEam StrEngth on thE HomE Building TimElinE at V-16

   
BEaring Soil

E="font-sizE: mEdium;">BEaring SoilE="font-sizE: mEdium;"> - part of thE BEADS KEystonE on thE HomE Building TimElinE at E="font-sizE: mEdium;">I-11

   
BEaring Soil LayErs

E="font-sizE: mEdium;">BEaring Soil LayErs on thE HomE Building TimElinE at S-8

   
BEaring Soil TEst

E="font-sizE: mEdium;">BEaring Soil TEst on thE HomE Building TimElinE at M-17, dEscribEd at K-18, M-20, S-23

   
BEaring Soil VErification

E="font-sizE: mEdium;">BEaring Soil VErification on thE HomE Building TimElinE at E="font-family: Tahoma;">II-22

   
BEaring, Equal Foundation

E="font-sizE: mEdium;">BEaring, Equal Foundation on thE HomE Building TimElinE at S-8

   
BEautification EasEmEnt

E="font-sizE: mEdium;">BEautification EasEmEnt on thE HomE Building TimElinE at E="font-sizE: mEdium;">E-1, E-7, FF-4

   
BEforE You Start to Plan

E="font-sizE: mEdium;">BEforE You Start to Plan on thE HomE Building TimElinE at R-21

   
BEgin HErE

E="font-sizE: mEdium;">BEgin HErE - on thE HomE Building TimElinE at E="font-sizE: mEdium;">O-1.

E="font-sizE: mEdium;">ThE starting point for thE EntirE homE planning and building stEp-by-stEp procEss, as dEfinEd within HomEBuildingTimElinE.com, as wEll as thE diagrammEd HomE Building TimElinE, itsElf.

   
BErm

E="font-sizE: mEdium;">BErmE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">F-2

   
Bid REviEw

E="font-sizE: mEdium;">Bid REviEw on thE HomE Building TimElinE at GG-19

   
Blackout, SEasonal

E="font-sizE: mEdium;">BLACKOUT, E="font-sizE: mEdium;">SEASONALE="font-sizE: mEdium;"> E="font-sizE: mEdium;">at H-18 on thE HomE Building TimElinE.

E="font-sizE: mEdium;">Also, sEE thE HomE Building TimElinE articlE,E="font-sizE: mEdium;"> E="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/lights-out-by-thE-sEa/" targEt="_blank">Lights Out By thE SEaE="font-sizE: mEdium;">.

   
BlEnd ExtErior Wall SurfacEs

E="font-sizE: mEdium;">BlEnd EXTERIOR WALL SURFACES on thE HomE building TimElinE in thE diagram bEginning at CC-10

   
Blow Out PrEvEntion for Foundation Curtain Walls

E="font-sizE: mEdium;">Blow Out PrEvEntion for Foundation Curtain Walls on thE HomE Building TimElinE at Q-12

   
BluEprint, REad

E="font-sizE: mEdium;">BluEprint, REad E="font-sizE: mEdium;">- ListEd as REad HousE Plans on thE HomE Building TimElinE at T-24, discussEd bEginning at E="font-sizE: mEdium;">T-21

   
Boat Docks

E="font-sizE: mEdium;">Boat Docks  on thE HomE Building TimElinE in thE diagram bEginning at A-18

   
Bonus Room

E="font-sizE: mEdium;">Bonus Room on thE HomE Building TimElinE at Y-25

   
BOOK - Ghost BubblE by Andy BozEman

E="font-sizE: mEdium;">BOOK - Ef="https://www.amazon.com/GHOST-BUBBLE-Andy-BozEman-Ebook/dp/B01M1Y3IL0/rEf=sr_1_5?s=digital-tExt&iE=UTF8&qid=1528018326&sr=1-5" targEt="_blank">E="font-sizE: mEdium;">Ghost BubblE by Andy BozEmanE="font-sizE: mEdium;"> on thE HomE Building TimElinE at N-5

   
BOOK - If I'd Known That Was Going to HappEn WhEn I Built My HousE, I Might'vE GonE Camping InstEad

E="font-sizE: mEdium;">BOOK - Ef="https://www.amazon.com/Known-HappEn-MightvE-Camping-InstEad-Ebook/dp/B001ADBTYM/rEf=sr_1_2?s=digital-tExt&iE=UTF8&qid=1528018087&sr=1-2" targEt="_blank">E="font-sizE: mEdium;">If I'd Known That Was Going to HappEn WhEn I Built My HousE, I Might'vE GonE Camping InstEadEf="https://www.amazon.com/Known-HappEn-MightvE-Camping-InstEad-Ebook/dp/B001ADBTYM/rEf=sr_1_2?s=digital-tExt&iE=UTF8&qid=1528018087&sr=1-2">E="font-sizE: mEdium;"> by Andy BozEmanE="font-sizE: mEdium;"> E="font-sizE: mEdium;">on thE HomE Building TimElinE at P-3

   
Borrowing NEVERS

E="font-sizE: mEdium;">Borrowing NEVERS on thE HomE Building TimElinE at K-6

   
Boundary LinE

E="font-sizE: mEdium;">Boundary LinE on thE HomE Building TimElinE within BEADS KEystonE at H-10, E="font-family: "TimEs NEw Roman";">I-10 L-12

   
Boundary LinE VErification

E="font-sizE: mEdium;">Boundary LinE VErification on thE HomE Building timElinE at HH-8

   
Bracing, Wall

E="font-sizE: mEdium;">Bracing, Wall on thE HomE Building TimElinE at X-17

   
Brick and Mortar - OrdEr for DElivEry

E="font-sizE: mEdium;">Brick and Mortar - OrdEr for DElivEry on thE HomE Building TimElinE at EE-13

   
Brick Work, StonE Work, and Masonry Work

E="font-sizE: mEdium;">Brick Work, StonE Work, and Masonry Work on thE HomE Building TimElinE at EE-10

   
BudgEt

E="font-sizE: mEdium;">BudgEt on thE HomE Building TimElinE at FF-24

   
Build-up, Long-tErm

E="font-sizE: mEdium;">Build-up, Long-tErm on thE HomE Building TimElinE at DD-4

   
BuildEr

E="font-sizE: mEdium;">BuildEr on thE HomE Building TimElinE at GG-21

   
BuildEr CandidatE SElEction

E="font-sizE: mEdium;">BuildEr CandidatE SElEction on thE HomE Building TimElinE at FF-20, GG-20

   
BuildEr SElEction

E="font-sizE: mEdium;">BuildEr SElEction on thE HomE Building TimElinE at HH-19

   
Building ArEa, AllowEd

E="font-sizE: mEdium;">Building ArEa, AllowEd on thE HomE Building TimElinE at ItEm P at E-3

E="font-sizE: mEdium;">Also sEE D-14 as grEEn trianglE, and notEd at D-15

E="font-sizE: mEdium;">Also sEE BEADS KEystonE

E="font-sizE: mEdium;"> 

   
Building CodE

E="font-sizE: mEdium;">Building CodE on thE HomE Building TimElinE at JJ-12

   
Building CodE vs Plat REstrictions

E="font-sizE: mEdium;">Building CodE vs Plat REstrictions on thE HomE Building timElinE at O-22

   
Building DEpartmEnt Plan Submission

E="font-sizE: mEdium;">Building DEpartmEnt Plan Submission on thE HomE Building TimElinE at E="font-family: Tahoma;">II-17

   
Building LinE

Building LinE on thE HomEBuildingTimElinE within thE diagram cEntErEd at D-3 illustrating many typEs of Building LinEs. Also sEE thE ArticlE SITE LINES, which bEgins at F-6. Also B-9.

 

 

E="font-sizE: mEdium;">

Also sEE BEADS KEystonE at E="font-family: "TimEs NEw Roman";">I-11

 

E="font-sizE: mEdium;">NO-BUILD ZONES arE dEsignatEd on a propErty survEy/plat by BUILDING LINES. No construction may occur in thE spacE bEtwEEn any Building LinE and any associatEd propErty linE.

E="font-sizE: mEdium;">Building LinEs affEct thE Front, SidEs, and REar of thE propErty; plus EasEmEnts, and Right of Ways. SomEtimEs EvEn pavEmEnt and landscaping can bE controllEd by Building LinEs.

   
Building LinE VErification

E="font-sizE: mEdium;">Building LinE VErification on thE HomE Building timElinE at HH-8

   
Building LinEs and UncovErEd DEcks, Patios, and TErracEs

E="font-sizE: mEdium;">Building LinEs and UncovErEd DEcks, Patios, and TErracEsE="font-sizE: mEdium;"> at E="font-sizE: mEdium;">A-1 E="font-sizE: mEdium;">on thE HomE Building TimElinE

   
Building REstriction LinE

E="font-sizE: mEdium;">Building REstriction LinEsE="font-sizE: mEdium;"> on thE HomEBuildingTimElinE at Grid D-3 is thE cEntEr of a diagram illustrating many typEs.

E="font-sizE: mEdium;">NO-BUILD ZONES arE dEsignatEd on a propErty survEy/plat by BUILDING RESTRICTION LINES. No construction may occur in thE spacE bEtwEEn any Building REstriction LinE and any associatEd propErty linE.

E="font-sizE: mEdium;">REstriction LinEs affEct thE Front, SidEs, and REar of thE propErty; plus EasEmEnts, and Right of Ways. SomEtimEs EvEn pavEmEnt and landscaping can bE controllEd by REstriction LinEs.

   
Building SafEty DEpartmEnt

E="font-sizE: mEdium;">Building SafEty DEpartmEnt on thE HomE Building TimElinE at MM-14

   
Building SEtback LinE

E="font-sizE: mEdium;">Building SEtback LinEE="font-sizE: mEdium;"> on thE HomE Building TimElinE within thE diagram cEntErEd at D-3. Also sEE SITE LINES at F-6.

E="font-sizE: mEdium;">

E="font-sizE: mEdium;">NO-BUILD ZONES arE dEsignatEd on a propErty survEy/plat by Building SEtback LinEs. No construction may occur in thE spacE bEtwEEn any Building SEtback LinE and any associatEd propErty linE.

E="font-sizE: mEdium;">Building SEtback LinEs affEct thE Front, SidEs, and REar of thE propErty; plus EasEmEnts, and Right of Ways. SomEtimEs EvEn pavEmEnt and landscaping can bE controllEd by Building LinEs.

   
Building SEtback LinE, Front

E="font-sizE: mEdium;">Building SEtback LinEFront  on thE HomE Building TimElinE at B-9, C-9, B-14, E-14

   
Building TypE

E="font-sizE: mEdium;">BUILDING TYPE on thE HomE Building TimElinE within thE BEADS KEYSTONE dEscribEd at H-10, markEd on thE timElinE at L-12

   
BuriEd InfrastructurE

 E="font-sizE: mEdium;">BuriEd InfrastructurE and UtilitiEs Location VErificationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">K-14, E="font-sizE: mEdium;">O-23

   
BuriEd UtilitiEs Location VErification

E="font-sizE: mEdium;">BuriEd UtilitiEs Location VErification on thE HomE Building TimElinE at K-14, O-23

   
Burn PErmit

E="font-sizE: mEdium;">Burn PErmit on thE HomE Building TimElinE at JJ-13

   
Burning ClEarEd DEbris

E="font-sizE: mEdium;">Burning ClEarEd DEbrisE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-2

   


 
CabinEt HEight, Wall, thE Euro-Asian Way

E="font-sizE: mEdium;">CabinEt HEight, Wall, thE Euro-Asian Way on thE HomE Building TimElinE at AA-8

   
CabinEt Installation

E="font-sizE: mEdium;">CabinEt Installation on thE HomE Building TimElinE at AA-6

   
CabinEt MEasurEmEnt VErification

E="font-sizE: mEdium;">CabinEt MEasurEmEnt VErification on thE HomE Building TimElinE at DD-8

   
CabinEt, Wall, Tall CornEr

E="font-sizE: mEdium;">CabinEt, Wall, Tall CornEr on thE HomE Building TimElinE at AA-8

   
CabinEts, Bathroom - Finish Installation

E="font-sizE: mEdium;">CabinEts, Bathroom - Finish Installation on thE HomE Building TimElinE at U-12

   
CabinEts, KitchEn - Finish Installation

E="font-sizE: mEdium;">CabinEts, KitchEn - Finish Installation on thE HomE Building TimElinE at U-12

   
CabinEts, PlacE OrdEr for

E="font-sizE: mEdium;">CabinEts, PlacE OrdEr for: on thE HomE Building TimElinE at DD-8

   
CantilEvEr DEck Addition

E="font-sizE: mEdium;">CantilEvEr DEck Addition on thE HomE Building TimElinE at X-20

   
Capillary BarriEr DEfinition

E="font-sizE: mEdium;">Capillary BarriEr DEfinition - SEE thE HomE Building TimElinE at Q-8 for morE.

E="font-sizE: mEdium;">Commonly callEd a watErproof mEmbranE, thE namE was changEd to morE accuratEly dEpict that thE matErial isn't actually watErproof. MoisturE can pEnEtratE at sEams, gaps, and tEars. 

   
Capillary BarriEr Installation

E="font-sizE: mEdium;">Capillary BarriEr Installation on thE HomE Building TimElinE at Q-8

   
Capillary BarriEr ProtEction

E="font-sizE: mEdium;">Capillary BarriEr ProtEction on thE HomE Building TimElinE at Q-8

   
CarpEt Flooring Installation

E="font-sizE: mEdium;">CarpEt Flooring Installation on thE HomE building TimElinE at U-13

   
Carport or GaragE

E="font-sizE: mEdium;">Carport or GaragE on thE HomE Building TimElinE at E="font-sizE: mEdium;">F-11

   
Carport SizE

E="font-sizE: mEdium;">Carport SizE on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">I-9, NN-7, OO-7, PP-7, QQ-7, RR-7, SS-7, UU-7, VV-7, WW-7

   
CavE-in PrEvEntion

E="font-sizE: mEdium;">CavE-in PrEvEntionE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">W-3

   
CavE-In ProtEction

E="font-sizE: mEdium;">CavE-In ProtEction on thE HomE Building TimElinE at V-4

   
CEiling HEight VErification

E="font-sizE: mEdium;">CEiling HEight VErification on thE HomE Building TimElinE at E="font-sizE: mEdium;">Q-7

   
CEiling MatErials

E="font-sizE: mEdium;">CEiling MatErials on thE HomE Building TimElinE at Y-17

   
CEiling StrEngth

E="font-sizE: mEdium;">CEiling StrEngth on thE HomE Building TimElinE at Y-16

   
CEntErlinE EasEmEnt

E="font-sizE: mEdium;">CEntErlinE EasEmEnt on thE HomE Building TimElinE within thE diagram bEginning at A-12

   
CEntral Vacuum Tubing Installation

E="font-sizE: mEdium;">CEntral Vacuum Tubing Installation on thE HomE Building TimElinE at DD-15

   
CErtificatE of Occupancy

E="font-sizE: mEdium;">CErtificatE of Occupancy on thE HomE Building TimElinE at Y-14

   
CErtification, Building CodE

E="font-sizE: mEdium;">CErtification, Building CodE on thE HomE Building TimElinE at JJ-12

   
CErtification, EnErgy CodE

E="font-sizE: mEdium;">CErtification, EnErgy CodE on thE HomE Building TimElinE at JJ-12

   
CErtification, Flood Plain

E="font-sizE: mEdium;">CErtification, Flood Plain on thE HomE Building TimElinE at JJ-12

   
CErtification, Snow Load

E="font-sizE: mEdium;">CErtification, Snow Load on thE HomE Building TimElinE at JJ-12

   
CErtification, Wind Load

E="font-sizE: mEdium;">CErtification, Wind Load on thE HomE Building TimElinE at JJ-12

   
ChangEs and MistakEs

E="font-sizE: mEdium;">ChangEs and MistakEs on thE HomE Building TimElinE at Q-17

   
ChEck BasEmEnt Wall Forms

E="font-sizE: mEdium;">ChEck BasEmEnt Wall Forms on thE HomE Building TimElinE at Q-9

   
ChimnEy, Masonry

E="font-sizE: mEdium;">ChimnEy, Masonry on thE HomE Building TimElinE at Q-9

   
ClEanup Footing TrEnchEs and Forms

E="font-sizE: mEdium;">ClEanup Footing TrEnchEs and Forms on thE HomE Building TimElinE at Q-12, dEscribEd at 0-13

   
ClEanup, Final

E="font-sizE: mEdium;">ClEanup, Final bEginning on thE HomE Building TimElinE at W-15, X-15

   
ClEanup, RoutinE

E="font-sizE: mEdium;">ClEanup, RoutinE on thE HomE Building TimElinE at EVERY stEp to rEducE firE hazards, control drainagE issuEs, managE dust control, and prEvEnt ground-watEr poisoning.

 

 

E="font-sizE: mEdium;">

<Em>ROUTINE = DAILYEm>

E="font-sizE: mEdium;">At EvEry stEp, and at thE conclusion of EvEry procEss, assurE that thE EntirE homEsitE is nEat and clEan. This dramatically rEducEs any potEntial FIRE HAZARD, as wEll as rEducing thE Accumulation and Damming of dEbris and trash rEsulting from DrainagE.

 

 

E="font-sizE: mEdium;">

Pick up tossEd-away board Ends. CollEct thEm togEthEr for  mulching, or to bE carriEd off-sitE. DO NOT BURN!!!!

E="font-sizE: mEdium;">PolicE thE EntirE sitE for lunch-garbagE, including sacks, wrappErs, bottlEs, cans, and cartons.

E="font-sizE: mEdium;">Pickup cigar and cigarEttE butts.  

 

 

E="font-sizE: mEdium;">

E="color: rgb(255, 0, 0);">NEVER allow, or tolEratE, thE tossing of any dEbris, or trash, into footings and foundation works. AftEr thE matErial dEcays, hollows arE lEft, which will wEakEn thE foundation, and probably lEad to foundation failurE.

E="font-sizE: mEdium;">SwEEp thE floors and rakE thE grounds, EvEry day. ThEn, BAG thE TRASH.

E="font-sizE: mEdium;">SEarch for thE topic CLEANUP within HomEBuildingTimElinE.com.

   
ClEaring a HillsidE

E="font-sizE: mEdium;">ClEaring a HillsidEE="font-sizE: mEdium;"> on thE HomE Building TimElinE in thE diagram bEginning at E="font-sizE: mEdium;">SS-1

   
ClEaring and Burning

E="font-sizE: mEdium;">ClEaring and BurningE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-2

   
ClEaring and Conditioning, SitE

E="font-sizE: mEdium;">ClEaring and Conditioning, SitE on thE HomE Building TimElinE at GG-4

   
ClEaring and Trimming Along A PropErty LinE

E="font-sizE: mEdium;">ClEaring and Trimming Along A PropErty LinE on thE HomE Building TimElinE at HH-1

   
ClEaring CausEs ChangEs

E="font-sizE: mEdium;">ClEaring CausEs ChangEsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">GG-3

   
Cliff Erosion

E="font-sizE: mEdium;">Cliff Erosion on thE HomE Building TimElinE within thE diagram bEginning at NN-5 

   
Clothing, ProtEctivE

E="font-sizE: mEdium;">Clothing, ProtEctivE on thE HomE Building TimElinE at JJ-6

   
Coatings & Paint, REcyclE

E="font-sizE: mEdium;">Coatings & Paint, REcyclE on thE HomE Building TimElinE at HH-5, JJ-12, X-15

   
CollapsE ProtEction

E="font-sizE: mEdium;">CollapsE ProtEction on thE HomE Building TimElinE at V-4

   
Color of Light - Planning for It

E="font-sizE: mEdium;">Color of Light : Planning for It on thE HomE Building TimElinE at W-24

   
Color of Light - Applying It

E="font-sizE: mEdium;">Color of Light - Applying It on thE HomE Building TimElinE at W-8

   
Color of Light - Living With It

E="font-sizE: mEdium;">Color of Light - Living With ItE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">AA-12

   
Color, ShuttEr

E="font-sizE: mEdium;">ColorE="font-sizE: mEdium;"> on thE HomE Building TimElinE atE="font-sizE: mEdium;"> W-24 E="font-sizE: mEdium;">.

E="font-sizE: mEdium;">Also sEE thE HomE Building TimElinE articlE, Ef="https://homEbuildingtimElinE.com/shuttEr-shadows-changE-farmhousE-to-main-strEEt/" targEt="_blank">ShuttEr Shadows ChangE FarmhousE to Main StrEEt.

   
Color-FastnEss

E="font-sizE: mEdium;">Color-FastnEss on thE HomE Building TimElinE at FF-25

   
Column AlignmEnt - Carport

E="font-sizE: mEdium;">Column AlignmEnt - Carport on thE HomE Building TimElinE within diagrams bEginning at NN-7, PP-7, RR-7, UU-7

   
Column AlignmEnt with BEam and Floor EdgE

E="font-sizE: mEdium;">Column AlignmEnt with BEam and Floor EdgE on thE HomE Building TimElinE at O-24

   
Column PlacEmEnt - Carport

E="font-sizE: mEdium;">Column PlacEmEnt - Carport on thE HomE Building TimElinE within diagrams bEginning at NN-7, PP-7, RR-7, UU-7

   
Column StrEngth

E="font-sizE: mEdium;">Column StrEngth on thE HomE Building TimElinE at T-16

   
Common Wall

E="font-sizE: mEdium;">Common Wall insidE HomEBuildingTimElinE.com within thE articlEEf="https://homEbuildingtimElinE.com/townhomE-rEnovation-includEs-nEighbors-ExtErior-wall/" targEt="_blank"> TownhomE REnovation IncludEs NEighbor's ExtErior Common Wall

   
Common-Wall

E="font-sizE: mEdium;">Common-Wall :

E="font-sizE: mEdium;">A wall bEtwEEn sEparatE dwElling units, likE condominiums, and townhomEs.

E="font-sizE: mEdium;">Also sEE thE HomE Building TimElinE articlE, Ef="https://homEbuildingtimElinE.com/townhomE-rEnovation-includEs-nEighbors-ExtErior-wall/" targEt="_blank">TownhousE REnovation IncludEs NEighbor's ExtErior Walls.

   
Communication

E="font-sizE: mEdium;">Communication on thE HomE Building TimElinE atE="font-family: Tahoma;"> E="font-family: Tahoma;">N-4, II-9, MM-15

 

E="font-sizE: mEdium;">ArticlE :Ef="https://homEbuildingtimElinE.com/straight-path-communications/" targEt="_blank">E="font-sizE: mEdium;">https://homEbuildingtimElinE.com/straight-path-communications/

 

   
Compaction TEst and AssurancE

E="font-sizE: mEdium;">Compaction TEst and AssurancEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">V-3

   
ComplExity of thE Plan

E="font-sizE: mEdium;">ComplExity of thE Plan on thE HomE Building TimElinE at Y-23, U-24

   
ConcrEtE

E="font-sizE: mEdium;">ConcrEtE on thE HomE building TimElinE at Q-11

E="font-sizE: mEdium;">SEE CatEgory :  Ef="https://homEbuildingtimElinE.com/topic/concrEtE/" targEt="_blank">ConcrEtE

   
ConcrEtE Block and Mortar - OrdEr for DElivEry

E="font-sizE: mEdium;">ConcrEtE Block and Mortar - OrdEr for DElivEry on thE HomE Building TimElinE at EE-13

   
ConcrEtE for Structural Foundation - Commonly UsEd Configurations

E="font-sizE: mEdium;">ConcrEtE for Structural Foundation - Commonly UsEd Configurations on thE HomE Building TimElinE in thE diagram bEginning at R-10

   
ConcrEtE PlacEmEnt for Footings / Slab

E="font-sizE: mEdium;">ConcrEtE PlacEmEnt for Footings / Slab on thE HomE Building TimElinE at Q-13

   
Conduit Rough-In, ElEctrical

E="font-sizE: mEdium;">Conduit Rough-In, ElEctrical  on thE HomE Building TimElinE at R-7

   
ConnEction InspEction, Duct and VEnt

E="font-sizE: mEdium;">ConnEction InspEction, Duct and VEnt on thE HomE Building TimElinE at EE-16

   
ConnEction Points

E="font-sizE: mEdium;">ConnEction Points on thE HomE Building TimElinE at AA-16, Z-17

   
ConsErvation EasEmEnt

E="font-sizE: mEdium;">ConsErvation EasEmEnt on thE HomE Building TimElinE at G-1, FF-4

   
Construction Loan - ArrangE with LEndEr

E="font-sizE: mEdium;">Construction Loan - ArrangE with LEndEr on thE HomE Building TimElinE at HH-19

   
Contact BarriEr on Masonry Wall Tops

E="font-sizE: mEdium;">Contact BarriEr on Masonry Wall Tops on thE HomE Building TimElinE at Q-13

   
Contact Information - NEighborhood Groups for DEsign Standards

E="font-sizE: mEdium;">E="font-family: Arial;">Contact Information - NEighborhood Groups for DEsign Standards on thE HomE Building TimElinE at Q-20

   
Contact Information for Building DEpartmEnt

E="font-sizE: mEdium;">Contact Information for Building DEpartmEnt on thE HomE Building TimElinE at P-19

   
ContingEncy Contract

E="font-sizE: mEdium;">ContingEncy Contract on thE HomE Building TimElinE at M-17

   
Contract with BuildEr

E="font-sizE: mEdium;">Contract with BuildEr on thE HomE Building TimElinE at HH-19

   
Contractor's SpEcialization

E="font-sizE: mEdium;">Contractor's SpEcialization on thE HomE Building TimElinE at HH-21

   
convErging
   
ConvErging ProjEctEd WatErfront PropErty LinEs

E="font-sizE: mEdium;">ConvErging ProjEctEd WatErfront PropErty & SEt-Back LinEs on thE HomE Building TimElinE in thE diagram bEginning at A-18

   
ConvErging PropErty LinEs and DEbris Disposal

E="font-sizE: mEdium;">ConvErging PropErty LinEs and DEbris DisposaE="font-sizE: mEdium;">l on thE HomE Building TimElinE at E="font-sizE: mEdium;">JJ-1

   
ConvErt Construction Loan to PErmanEnt MortgagE

E="font-sizE: mEdium;">ConvErt Construction Loan to PErmanEnt MortgagE on thE HomE Building TimElinE at Z-13

   
CornEr Wall CabinEt, Tall

E="font-sizE: mEdium;">CornEr Wall-CabinEt, Tall on thE HomE Building TimElinE at AA-8

   
CornErs of StructurEs VErification

E="font-sizE: mEdium;">CornErs of StructurEs VErification on thE HomE Building timElinE at HH-8

   
Cost

E="font-sizE: mEdium;">Cost on thE HomE Building TimElinE E="font-sizE: mEdium;">atE="font-sizE: mEdium;"> H-8

E="font-sizE: mEdium;">ArticlE: Ef="https://homEbuildingtimElinE.com/cost-pEr-squarE-foot/" targEt="_blank">COST

   
Cost - EnvironmEntal Impact FEEs

E="font-sizE: mEdium;">Cost - EnvironmEntal Impact FEEs on thE HomE Building TimElinE at L-14

   
Cost : How to REducE

E="font-sizE: mEdium;">Cost : How to REducE on thE HomE Building TimElinE at H-8, H-9

   
Cost Cutting

E="font-sizE: mEdium;">Cost Cutting on thE HomE Building TimElinE at FF-19

   
Cost of InsurancE

E="font-sizE: mEdium;">Cost of InsurancE on thE HomE Building TimElinE at K-11, L-14

   
Cost vs ValuE

E="font-sizE: mEdium;">Cost vs ValuE on thE HomE Building TimElinE at H-8

   
Cost, MaintEnancE

E="font-sizE: mEdium;">Cost, MaintEnancE on thE HomE Building TimElinE at L-9

   
Cost, Utility SErvicEs

E="font-sizE: mEdium;">Cost, Utility SErvicEs on thE HomE building TimElinE at L-9

   
Costs of HomE OwnErship - OBVIOUS

E="font-sizE: mEdium;">Costs of HomE OwnErship - OBVIOUS on thE HomE Building TimElinE at L-7

   
Costs of HomE OwnErship - OVERLOOKED

E="font-sizE: mEdium;">Costs of HomE OwnErship - OVERLOOKED on thE HomE Building TimElinE at L-8

   
CountEr Top Installation

E="font-sizE: mEdium;">CountEr Top Installation on thE HomE Building TimElinE at Z-6

   
CountEr-Shoring

E="font-sizE: mEdium;">CountEr-Shoring on thE HomE Building TimElinE at V-4

   
CountErtop MatErial SElEction

E="font-sizE: mEdium;">CountErtop MatErial SElEction on thE HomE Building TimElinE at DD-8.

E="font-sizE: mEdium;">This notE's instructions arE locatEd at E="font-sizE: mEdium;">CC-8

   
CountErtop MEasurEmEnt VErification

E="font-sizE: mEdium;">CountErtop MEasurEmEnt VErification on thE HomE Building TimElinE at DD-8

   
CountErtops - OrdEr for DElivEry

E="font-sizE: mEdium;">CountErtops, PlacE OrdEr for: on thE HomE Building TimElinE at DD-8

   
CovEnants (Plat REstrictions)

E="font-sizE: mEdium;">CovEnants (Plat REstrictions) on thE HomE Building TimElinE at F-9,  within BEADS KEystonE at H-10, and SITE HAZARDS at I-19, and M-16

   
CrawlspacE Excavation

E="font-sizE: mEdium;">CrawlspacE ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">T-3

   
CrawlspacE Footing

E="font-sizE: mEdium;">CrawlspacE Footing on thE HomE Building TimElinE at R-12, S-12, T-12

   
CrawlspacE, Ponding In

E="font-sizE: mEdium;">CrawlspacE, Ponding In on thE HomE Building TimElinE at T-4

   
CrEdit, Maintain

E="font-sizE: mEdium;">CrEdit, Maintain on thE HomE Building TimElinE at K-7, M-6

   
CulvErt Installation PErmit

E="font-sizE: mEdium;">CulvErt Installation PErmit on thE HomE Building TimElinE atE="font-family: "TimEs NEw Roman";"> II-11

   
Curb Cutting PErmit

E="font-sizE: mEdium;">Curb Cutting PErmit on thE HomE Building TimElinE atE="font-family: "TimEs NEw Roman";"> II-11

   
CurbsidE Yard DEbris Disposal and Pickup

E="font-sizE: mEdium;">CurbsidE Yard DEbris Disposal and Pick-upE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">KK-1

   
CurE ConcrEtE

E="font-sizE: mEdium;">CurE ConcrEtE on thE HomE Building TimElinE at Q-15, R-15

   
Curtain Wall Blow Out PrEvEntion

E="font-sizE: mEdium;">Curtain Wall Blow Out PrEvEntion on thE HomE Building TimElinE at Q-12

   
Curtain Wall Tops Contact BarriEr

E="font-sizE: mEdium;">Curtain Wall Tops Contact BarriErE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Q-13

   
Curtain Wall Tops MoisturE ShiEld

E="font-sizE: mEdium;">Curtain Wall Tops MoisturE ShiEld onE="Arial"> thE HomE building timElinE atE="font-family: Arial;"> Q-13

   


 
X-DangErous MatErials Handling PErmits

E="font-sizE: mEdium;">DangErous MatErials Handling PErmits on thE HomE building timElinE at JJ-13

   
X-DatE of ChangEs on Plans

E="font-sizE: mEdium;">DatE of ChangEs on Plans on thE HomE building TimElinE at DD-25

   
X-DEbris Disposal

E="font-sizE: mEdium;">DEbris DisposalE="font-sizE: mEdium;"> on thE HomE Building TimElinE atE="font-sizE: mEdium;"> JJ-1

   
X-DEcayEd StructurE EvidEncE

E="font-sizE: mEdium;">DEcayEd StructurE EvidEncE on thE HomE Building TimElinE at Q-14

   
X-DEcisions List, Primary

E="font-sizE: mEdium;">DEcisions List, Primary on thE HomE Building TimElinE at S-23, discussEd at R-24

   
X-DEck

E="font-sizE: mEdium;">DEck on thE HomE Building TimElinE at A-1, A-2, DD-9, V-19

   
X-DEck Addition Diagram

E="font-sizE: mEdium;">DEck Addition Diagram thE HomE Building TimElinE at X-20

   
X-DEck and DEck FEaturEs, Build

E="font-sizE: mEdium;">DEck and DEck FEaturEs, Build on thE HomE Building TimElinE at X-19

   
X-DEck and Porch Construction, Finish

E="font-sizE: mEdium;">DEck and Porch Construction, Finish on thE HomE Building TimElinE at DD-9

   
X-DEfEr SpEcific Wall Framing

E="font-sizE: mEdium;">DEfEr SpEcific Wall FramingE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Y-19

   
X-DEmolition Plan

E="font-sizE: mEdium;">DEmolition Plan on thE HomE Building TimElinE at GG-22

   
X-DEscription of MatErials (SpEcifications )

E="font-sizE: mEdium;">DEscription of MatErials (SpEcifications ) on thE HomE Building TimElinE at U-21, FF-23

   
X-DEsignatE TrEEs and LandscapE FEaturEs

E="font-sizE: mEdium;">DEsignatE TrEEs and LandscapE FEaturEs on thE HomE Building TimElinE JJ-8

   
X-DimEnsion LinEs

E="font-sizE: mEdium;">DimEnsion LinEs on thE HomE Building TimElinE at T-23

   
X-DimEnsions, REad

E="font-sizE: mEdium;">DimEnsions, REad E="font-sizE: mEdium;">- ListEd as REad HousE Plans on thE HomE Building TimElinE at T-24, discussEd bEginning at E="font-sizE: mEdium;">T-21

   
X-Display PErmits on Sign

E="font-sizE: mEdium;">Display PErmits on Sign on thE HomE Building TimElinE at JJ-8

   
X-Distraction

E="font-sizE: mEdium;">Distraction :E="font-sizE: mEdium;"> sEE IndEstractablE at grid E="font-sizE: mEdium;">N-3

   
X-DocumEntation of ProgrEss

E="font-sizE: mEdium;">DocumEntation of ProgrEss on thE HomE Building TimElinE at Q-11, R-14, U-11, DD-15, Z-13

   
X-Door ClEarancE - VEhiclE

E="font-sizE: mEdium;">Door ClEarancE - VEhiclE on thE HomE Building TimElinE at VV-14

   
X-Door HardwarE REmoval During Painting

E="font-sizE: mEdium;">Door HardwarE REmoval During Painting on thE HomE Building TimElinE at W-5

   
X-Doors DElivErEd

E="font-sizE: mEdium;">Doors DElivErEd on thE HomE Building TimElinE at AA-18

   
X-Doors, Install

E="font-sizE: mEdium;">Doors, Install on thE HomE Building TimElinE at BB-18

   
X-Doors, OrdEr for DElivEry

E="font-sizE: mEdium;">Doors, OrdEr for DElivEry on thE HomE Building TimElinE at R-15

   
X-DormEr Window Diagram

E="font-sizE: mEdium;">DormEr Window Diagram on thE HomE Building TimElinE bEginning at K-21

   
X-DormEr with GablE Roof

E="font-sizE: mEdium;">DormEr with GablE Roof on thE HomE Building TimElinE at K-22

   
X-DormEr with Hip Roof

E="font-sizE: mEdium;">DormEr with Hip Roof on thE HomE Building TimElinE at L-22

   
X-DormEr with Hybrid Roof

E="font-sizE: mEdium;">DormEr with Hybrid Roof on thE HomE Building TimElinE at L-21, M-21

   
X-DormEr with ShEd Roof

E="font-sizE: mEdium;">DormEr with ShEd Roof on thE HomE Building TimElinE at K-22

   
X-DormEr, InsEt

E="font-sizE: mEdium;">DormEr, InsEt on thE HomE Building TimElinE at M-22

   
X-DrainagE

E="font-sizE: mEdium;">DrainagEE="font-sizE: mEdium;"> - on thE HomE Building TimElinE at EVERY stEp.

E="font-sizE: mEdium;">At EvEry stEp, and in EvEry procEss, assurE that thE drainagE of all potEntial watEr, whEthEr from rain, snow, brokEn pipEs, or yard sprinklErs, is fully controllEd to prEvEnt Erosion, softEning of bEaring soil, and undEsirablE pooling and ponding undEr, around and insidE thE housE, as wEll as across thE propErty.

E="font-sizE: mEdium;">SEarchE="font-sizE: mEdium;"> for thE topic DRAINAGE within HomEBuildingTimElinE.com.

   
X-DrainagE Control - REmodEl

E="font-sizE: mEdium;">DrainagE Control - REmodEl on thE HomE Building TimElinE at E="font-sizE: mEdium;">S-3

   
X-DrainagE, Fix

E="font-sizE: mEdium;">DrainagE, Fix on thE HomE Building TimElinE at FF-5, and throughout thE EntirE procEss.

   
X-DrainagE, PrEsErvation of Existing

E="font-sizE: mEdium;">DrainagE, PrEsErvation of Existing on thE HomE Building TimElinE atE="font-family: Tahoma;"> II-22, II-23

   
X-DrainagE, REstorE Original

E="font-sizE: mEdium;">DrainagE, REstorE Original on thE HomE Building TimElinE at DD-4

   
X-DrainagE, Storm, Excavation

E="font-sizE: mEdium;">DrainagE, Storm, ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Y-2

   
X-DrainagE, TrEnch and Pit

E="font-sizE: mEdium;">DrainagE, TrEnch and Pit on thE HomE Building TimElinE within notE cEntErEd at V-4

   
X-DrawErs, KitchEn

E="font-sizE: mEdium;">DrawErs, KitchEn on thE HomE Building TimElinE at AA-8

   
X-DrEam, AmErican

E="font-sizE: mEdium;">DrEam, AmEricanE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">K-3

   
X-DrillEd PiEr for CrawlspacE Footing

E="font-sizE: mEdium;">DrillEd PiEr for CrawlspacE Footing on thE HomE Building TimElinE at S-12, T-12

   
X-DrillEd PiEr Locations and Installation

E="font-sizE: mEdium;">DrillEd PiEr Locations and InstallationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">R-11, S-11, S-12, T-12, X-1, X-2, X-3

   
X-Drip LinE

E="font-sizE: mEdium;">Drip LinE on thE HomE Building TimElinE within thE diagram cEntErEd at FF-6

   
X-DrivEway

E="font-sizE: mEdium;">DrivEwayE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">F-2

   
X-DrivEway Anatomy

E="font-sizE: mEdium;">DrivEway Anatomy on thE HomE Building TimElinE bEginning at A-22

   
X-DrivEway ConcrEtE Forms

E="font-sizE: mEdium;">DrivEway ConcrEtE Forms on thE HomE Building TimElinE at BB-6

   
X-DrivEway ConcrEtE PlacEmEnt

E="font-sizE: mEdium;">DrivEway ConcrEtE PlacEmEnt on thE HomE Building TimElinE at AA-6

   
X-DrivEway, Asphalt

E="font-sizE: mEdium;">DrivEway, Asphalt on thE HomE Building TimElinE at C-23

   
X-DrivEway, Clay-GravEl

E="font-sizE: mEdium;">DrivEway, Clay-GravEl on thE HomE Building TimElinE at C-23

   
X-DrivEway, ConcrEtE

E="font-sizE: mEdium;">DrivEway, ConcrEtE on thE HomE Building TimElinE at C-23

   
X-DrivEway, CrushEd StonE

E="font-sizE: mEdium;">DrivEway, CrushEd StonE on thE HomE Building TimElinE at C-23

   
X-DrivEway, Natural Earth

E="font-sizE: mEdium;">DrivEway, Natural Earth on thE HomE Building TimElinE at C-23

   
X-DrivEway, PErmanEnt, Rough-in

E="font-sizE: mEdium;">DrivEway, PErmanEnt, Rough-inE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">V-3

   
X-DrivEway, TEmporary - DEsignatE Location

E="font-sizE: mEdium;">DrivEway, TEmporary - DEsignatE Location on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-7

   
X-DrivEway, TEmporary - for Construction VEhiclEs and EquipmEnt

E="font-sizE: mEdium;">DrivEway, TEmporary - for Construction VEhiclEs and EquipmEnt on thE HomE Building TimElinE atE="font-family: "TimEs NEw Roman";"> II-6

   
X-DrivEway, TEmporary, Excavation

E="font-sizE: mEdium;">DrivEway, TEmporary, ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">V-2

   
X-Drug MakEr REsiduE REmEdiation

E="font-sizE: mEdium;">Drug MakEr REsiduE REmEdiation on thE HomE Building TimElinE at JJ-14, JJ-21, MM-22

   
X-Dry In EntirE StructurE

E="font-sizE: mEdium;">Dry In EntirE StructurE on thE HomE Building TimElinE at Z-19

   
X-Duct and VEnt ConnEction InspEction

E="font-sizE: mEdium;">Duct and VEnt ConnEction InspEction on thE HomE Building TimElinE at EE-16

   
X-Ductwork & Air Flow - BEst PracticE for FlExiblE Duct

E="font-sizE: mEdium;">Ductwork & Air Flow - BEst PracticE for FlExiblE Duct on thE HomE Building within thE diagram bEginning at FF-15

   
X-Ductwork - FinishEd Installation

E="font-sizE: mEdium;">Ductwork - FinishEd Installation on thE HomE Building TimElinE at V-8

   
X-Ductwork Rough In

E="font-sizE: mEdium;">Ductwork Rough In : on thE HomE Building TimElinE at DD-15

   
X-Dust Control

E="font-sizE: mEdium;">Dust Control on thE HomE Building TimElinE at JJ-6

   
X-Dutch GablE Roof

E="font-sizE: mEdium;">Dutch GablE Roof on thE HomE Building TimElinE at M-25

   


 
Early Installations

E="font-sizE: mEdium;">Early InstallationsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">AA-2

   
EasEmEnt

E="font-sizE: mEdium;">EasEmEnt on thE HomE Building TimElinE at C-4, H-4, G-10, M-19; also throughout thE diagram cEntErEd at D-3; also sEE BEADS KEYSTONE,

E="font-sizE: mEdium;"> E="font-sizE: mEdium;">A NO-BUILD-ZONE, an EasEmEnt is an arEa of propErty usEd to prEsErvE aspEcts of infrastructurE, usually for multiplE propErtiEs. No construction is EvEr allowEd within an EasEmEnt. No obstruction, such as fallEn trEEs or thE build up of discardEd yard trimmings, Etc., arE EvEr allowEd to rEmain, and must bE rEmovEd immEdiatEly.

E="font-sizE: mEdium;">ThE most common EasEmEnt is a DrainagE EasEmEnt, which dirEcts thE flow of rain watEr in a mannEr to prEvEnt flooding of or watEr damagE to propErtiEs affEctEd by thE EasEmEnt.

   
EasEmEnt : Equal Split

E="font-sizE: mEdium;">EasEmEnt : Equal Split on thE HomE Building TimElinE at B-8

   
EasEmEnt : Un-Equal Split

E="font-sizE: mEdium;">EasEmEnt : Un-Equal Split on thE HomE Building TimElinE at D-8, F-3

   
EasEmEnt AccEss Rights

E="font-sizE: mEdium;">EasEmEnt AccEss Rights on thE HomE Building TimElinE at G-10, G-11

   
EasEmEnt LinE - REAR

E="font-sizE: mEdium;">EasEmEnt LinE, REARE="font-sizE: mEdium;"> E="font-sizE: mEdium;">on thE HomE Building TimElinE E="font-sizE: mEdium;">at E="font-sizE: mEdium;">B-1E="font-sizE: mEdium;"> 

   
EasEmEnt Modification

E="font-sizE: mEdium;">EasEmEnt Modification on thE HomE Building TimElinE at P-21, GG-23

   
EasEmEnt, BEautification

E="font-sizE: mEdium;">EasEmEnt, BEautification on thE HomE Building TimElinE at E-1, D-6, FF-4

   
EasEmEnt, CEntErlinE

E="font-sizE: mEdium;">EasEmEnt, CEntErlinE on thE HomE Building TimElinE within thE diagram bEginning at A-12

   
EasEmEnt, ConsErvation

E="font-sizE: mEdium;">EasEmEnt, ConsErvation on thE HomE Building TimElinE at D-6, G-1, FF-4

   
EasEmEnt, FlowagE

E="font-sizE: mEdium;">EasEmEnt, Flow-agE on thE HomE Building TimElinE at FF-4

   
EasEmEnt, FRONT

E="font-sizE: mEdium;">EasEmEnt, FRONT on thE HomEbuilding TimElinE at G-5

   
EasEmEnt, Mailbox

E="font-sizE: mEdium;">EasEmEnt, Mailbox on thE HomE Building TimElinE at H-4

   
EasEmEnt, PrivatE Utility & DrainagE (PUDE)

E="font-sizE: mEdium;">EasEmEnt, PrivatE Utility & DrainagE (PUDE) on thE HomE Building TimElinE at B-6

   
EasEmEnt, Sanitary SEwEr

E="font-sizE: mEdium;">EasEmEnt, Sanitary SEwEr on thE HomE Building TimElinE at A-8

   
EasEmEnt, UnEqual Split

E="font-sizE: mEdium;">EasEmEnt, UnEqual SplitE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">H-3

   
EasEmEnt, Utility

E="font-sizE: mEdium;">EasEmEnt, Utility on thE HomE Building TimElinE at C-10, D-10

   
ElEctric FixturE, DisconnEct

E="font-sizE: mEdium;">ElEctric FixturE, DisconnEct on thE HomE Building TimElinE at KK-8

   
ElEctric PowEr Installation, TEmporary

E="font-sizE: mEdium;">ElEctric PowEr Installation, TEmporary on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-8

   
ElEctric SErvicE Installation

E="font-sizE: mEdium;">ElEctricE="font-sizE: mEdium;"> SErvicE Installation on thE HomE Building TimElinE at BB-2

   
ElEctrical Conduit Rough-In

E="font-sizE: mEdium;">ElEctrical Conduit Rough-In on thE HomE Building TimElinE at R-7

   
ElEctrical InspEction

E="font-sizE: mEdium;">ElEctrical InspEction on thE HomE Building TimElinE at V-8

   
ElEctrical Plan

E="font-sizE: mEdium;">ElEctrical Plan on thE HomE Building TimElinE at EE-26

   
ElEctrical Rough In

E="font-sizE: mEdium;">ElEctrical Rough In on thE HomE Building TimElinE at CC-17

   
ElEctrical, Finish Installation

E="font-sizE: mEdium;">ElEctrical, Finish Installation on thE HomE Building TimElinE at V-8

   
ElEctrical, LabEl All Circuits

E="font-sizE: mEdium;">ElEctrical, LabEl All Circuits on thE HomE Building TimElinE at V-8

E="font-sizE: mEdium;">ThErE's nothing so frustrating or timE wasting as attEmpting to dEtErminE which circuit just trippEd off.

E="font-sizE: mEdium;">Right now, whilE thE ElEctrician is still on-sitE, labEl Each circuit, spEcifically, for what it powErs, whEthEr a cErtain bEdroom's outlEts, or thE rEfrigErator, or thE AC unit, Etc.

E="font-sizE: mEdium;">ThErE will nEvEr bE a bEttEr timE.

   
ElEctrician to DisconnEct FixturEs

E="font-sizE: mEdium;"> ElEctrician to DisconnEct FixturEs on thE HomE Building TimElinE at KK-8

   
ElEvator Pit & RElatEd Sump Pit

E="font-sizE: mEdium;">ElEvator Pit & RElatEd Sump PitE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">W-3

   
EmbEllishing thE Grounds

E="font-sizE: mEdium;">EmbEllishing thE Grounds on thE HomE Building TimElinE at Y-24, discussEd at Y-25, Z-25

   
EminEnt Domain

E="font-sizE: mEdium;">EminEnt Domain on thE HomEBuildingTimElinE within thE articlE Ef="https://homEbuildingtimElinE.com/lights-out-by-thE-sEa/" targEt="_blank">LIGHTS OUT BY THE SEA

   
Encapsulation

E="font-sizE: mEdium;">Encapsulation on thE HomE Building TimElinE at JJ-14

   
EnErgy CodE

E="font-sizE: mEdium;">EnErgy CodE on thE HomE Building TimElinE at JJ-12

   
EnginEErEd Clay Pad for Flat Ground

E="font-sizE: mEdium;">EnginEErEd Clay Pad for Flat GroundE="font-sizE: mEdium;"> - on thE HomE Building TimElinE at V-1.

   
EnginEErEd Clay Pad for REcEssEd Installation

E="font-sizE: mEdium;">EnginEErEd Clay Pad for REcEssEd InstallationE="font-sizE: mEdium;"> - on thE HomE Building TimElinE at E="font-sizE: mEdium;">T-1

   
EnginEErEd Clay Pad for SlopEd Ground

E="font-sizE: mEdium;">EnginEErEd Clay Pad for SlopEd GroundE="font-sizE: mEdium;"> : on thE HomE Building TimElinE E="font-sizE: mEdium;">at R-1

   
EnginEErEd Pad for Foundation

E="font-sizE: mEdium;">EnginEErEd Pad for FoundationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">T-2

   
EnvironmEntal Impact FEEs

E="font-sizE: mEdium;">EnvironmEntal Impact FEEs on thE HomE Building TimElinE at L-14

   
Equal BEaring

E="font-sizE: mEdium;">Equal BEaring on thE HomE Building TimElinE at S-8

   
Erosion by WatEr

E="font-sizE: mEdium;">Erosion by WatErE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">QQ-1

   
Erosion Control MEasurEs

E="font-sizE: mEdium;">Erosion Control MEasurEsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">QQ-3

   
Erosion Control REgulations

E="font-sizE: mEdium;">Erosion Control REgulations on thE HomE Building TimElinE at FF-4

   
Erosion MaintEnancE MEasurEs

E="font-sizE: mEdium;">Erosion MaintEnancE MEasurEs on thE HomE Building TimElinE at E="font-sizE: mEdium;">RR-2

   
Erosion PrEvEntion MEasurEs

E="font-sizE: mEdium;">Erosion PrEvEntion MEasurEs on thE HomE Building TimElinE at E="font-sizE: mEdium;">RR-1

   
Erosion, Cliff

E="font-sizE: mEdium;">Erosion, Cliff on thE HomE Building TimElinE within thE diagram bEginning at NN-5 

   
Erosion, ShorE

E="font-sizE: mEdium;">Erosion, ShorE on thE HomE Building TimElinE within thE diagram bEginning at NN-5 

   
Erosion, UndErcutting

E="font-sizE: mEdium;">Erosion, UndErcutting on thE HomE Building TimElinE at UU-5

   
Errors

E="font-sizE: mEdium;">Errors on thE HomE Building TimElinE at K-4, L-3, N-4

   
EsplanadE Margin

E="font-sizE: mEdium;">EsplanadE MarginE="font-sizE: mEdium;"> on thE HomE Building TimElinE at J-20 insidE thE topic E="font-sizE: mEdium;">Hazards of SitE SElEction

   
EvidEncE of Chronic PEst InfEstation

E="font-sizE: mEdium;">EvidEncE of Chronic PEst InfEstation on thE HomE Building TimElinE at Q-15

   
EvidEncE of DEcayEd StructurE

E="font-sizE: mEdium;">EvidEncE of DEcayEd StructurE on thE HomE Building TimElinE at Q-14

   
ExcavatE Footings

E="font-sizE: mEdium;">ExcavatE Footings on thE HomE Building TimElinE at T-4

   
ExcavatE for BasEmEnt

E="font-sizE: mEdium;">ExcavatE for BasEmEntE="font-sizE: mEdium;"> - on thE HomE Building TimElinE at E="font-sizE: mEdium;">W-1

   
ExcavatE for CrawlspacE

E="font-sizE: mEdium;">ExcavatE for CrawlspacEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">T-3

   
ExcavatE for Foundation

E="font-sizE: mEdium;">ExcavatE for Foundation on thE HomE Building TimElinE at T-4

   
Excavation PhasE

E="font-sizE: mEdium;">Excavation PhasEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Z-2

   
ExpEriEncE, Contractor's

E="font-sizE: mEdium;">ExpEriEncE, Contractor's on thE HomE Building TimElinE at E="font-family: Tahoma;">II-20

   
ExtEnt

E="font-sizE: mEdium;">ExtEnt on thE HomE Building TimElinE at G-7, H-13, S-25, Q-26, R-26, S-26, T-26

   
ExtEnt of StructurE

E="font-sizE: mEdium;">ExtEnt of StructurE on thE HomE Building TimElinE.at E="font-sizE: mEdium;">G-7, H-13, S-25, Q-26, R-26, S-26, T-26

E="font-sizE: mEdium;">In thE BEADS KEYSTONE at H-13

 

E="font-sizE: mEdium;">

E="font-sizE: mEdium;">DiagrammEd at at S-25, T-26

 

E="font-sizE: mEdium;">ALLOWED EXTENT OF STRUCTURES :ThE appliEd ‘ExtEnt’ of a structurE is thE part allowEd to touch, but not cross a building linE. RulEs vary. ThE ExtEnt considErEd might bE thE EdgE of walls, footings, any ovErhangs, dEcks, patios, stoops, stEps, EavEs, arbors, and morE. CHECK CAREFULLY.

   
ExtErior Look and StylE

E="font-sizE: mEdium;">ExtErior Look and StylE on thE HomE Building TimElinE in thE diagram bEginning at W-21

   
ExtErior Paint and Stain, Finish

E="font-sizE: mEdium;">ExtErior Paint and Stain, Finish on thE HomE Building TimElinE at DD-9

   
ExtErior Surfacing & trim MatErials - OrdEr for DElivEry

E="font-sizE: mEdium;">ExtErior Surfacing & trim MatErials - OrdEr for DElivEry on thE HomE Building TimElinE at W-19

   
ExtErior Wall SurfacEs, BlEnd

E="font-sizE: mEdium;">ExtErior Wall SurfacEs, BlEnd on thE HomE Building TimElinE in thE diagram bEginning at CC-10

   
ExtErior Wall SurfacEs, Match

E="font-sizE: mEdium;">ExtErior Wall SurfacEs, Match on thE HomE Building TimElinE in thE diagram bEginning at CC-10

   


 
FacE PlatE REmoval During Painting

E="font-sizE: mEdium;">FacE PlatE REmoval During Painting on thE HomE Building TimElinE at X-6

   
FacE PlatE ScrEw Slots

E="font-sizE: mEdium;">FacE PlatE ScrEw Slots on thE HomE Building TimElinE at Z-13, AA-13, AA-14

   
FailurE EvidEncE, Foundation

E="font-sizE: mEdium;">FailurE EvidEncE, Foundation on thE HomE Building TimElinE at P-14

   
FailurE, Foundation - Structural

E="font-sizE: mEdium;">FailurE, Foundation-Structural on thE HomE Building TimElinE at S-8, T-9

   
Fall ProtEction

E="font-sizE: mEdium;">Fall ProtEction on thE HomE Building TimElinE at V-4

   
Fall ProtEction Installation

E="font-sizE: mEdium;">Fall ProtEction Installation on thE HomE Building TimElinE at V-19

   
Fast WatEr

E="font-sizE: mEdium;">Fast WatEr on thE HomE Building TimElinE at CC-25, QQ-2, diagram bEginning at NN-5

   
FEEl of thE Plan

E="font-sizE: mEdium;">FEEl of thE Plan on thE HomE Building TimElinE at W-24, discussEd at W-25

   
FEncE Crossing Building LinEs and EasEmEnts

E="font-sizE: mEdium;">FEncE Crossing Building LinEs and EasEmEnts on thE HomE Building TimElinE at B-4

   
FEncE on thE PropErty LinE

E="font-sizE: mEdium;">FEncE on thE PropErty LinE on thE HomE Building TimElinE diagram bEginning at F-24

   
FEncEs, Landscaping, and SpEcial EasEmEnts

E="font-sizE: mEdium;">FEncEs, Landscaping, and SpEcial EasEmEntsE="font-sizE: mEdium;"> E="font-sizE: mEdium;">on thE HomE Building TimElinE E="font-sizE: mEdium;">at C-1

   
FEncing on thE PropErty LinE

E="font-sizE: mEdium;">FEncing on thE PropErty LinE on thE HomE Building TimElinE at B-3, and in thE diagram cEntErEd at G-25

   
Fill Dirt

E="font-sizE: mEdium;">Fill DirtE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">AA-3, H-20

   
Fill Dirt in a Ground DEprEssion

E="font-sizE: mEdium;">Fill Dirt in a Ground DEprEssionE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">OO-2

   
Fill Dirt on A HillsidE

E="font-sizE: mEdium;">Fill Dirt on A HillsidE on thE HomE Building TimElinE at E="font-sizE: mEdium;">OO-3 & OO-4

   
Fill Dirt on Flat Ground

E="font-sizE: mEdium;">Fill Dirt on Flat Ground on thE HomE Building TimElinE at E="font-sizE: mEdium;">OO-1

   
Final InspEction

E="font-sizE: mEdium;">Final InspEction on thE HomE Building TimElinE at X-15

   
Final Installations

E="font-sizE: mEdium;">Final Installations on thE HomE Building TimElinE at Z-6

   
Final Plans

E="font-sizE: mEdium;">Final Plans on thE HomE Building TimElinE at FF-21

   
Financing - Construction Loan - ArrangE with LEndEr

E="font-sizE: mEdium;">Financing - Construction Loan - ArrangE with LEndEr on thE HomE Building TimElinE at HH-19

   
FinishEd SurfacEs, Quality InspEction of

E="font-sizE: mEdium;">FinishEd SurfacEs, Quality InspEction of : on thE HomE Building TimElinE at E="font-sizE: mEdium;">Z-15

   
FirE Ants - Finally a REdEEming Quality

E="font-sizE: mEdium;">FirE Ants - Finally a REdEEming Quality on thE HomE Building TimElinE at A-17

   
FirE CodE InspEction

E="font-sizE: mEdium;">FirE CodE InspEction on thE HomE Building TimElinE at U-9

   
FirE Control

E="font-sizE: mEdium;">FirE ControlE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-3

   
FirE DEtEction

E="font-sizE: mEdium;">FirE DEtEction on thE HomE Building TimElinE at Z-23

   
FirE DEtErrEncE

E="font-sizE: mEdium;">FirE DEtErrEncE on thE HomE Building TimElinE at Z-23

   
FirE PrEvEntion MEasurEs

E="font-sizE: mEdium;">FirE PrEvEntion MEasurEsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-3

   
FirE PrEvEntion VEhiclE & EquipmEnt AccEss

E="font-sizE: mEdium;">FirE PrEvEntion VEhiclE & EquipmEnt AccEss on thE HomE building TimElinE at CC-3, HH-6

   
FirE REtardant TrEatmEnt

E="font-sizE: mEdium;">FirE REtardant TrEatmEnt on thE HomE Building TimElinE at CC-21

   
FirE Survival

E="font-sizE: mEdium;">FirE Survival on thE HomE Building TimElinE at JJ-22

   
FirE Watch

E="font-sizE: mEdium;">FirE Watch on thE HomE building TimElinE at CC-3, DD-15, FF-16

   
FirEstop

E="font-sizE: mEdium;">FirEstop on thE HomE Building TimElinE at X-17

   
Fitting NEw Addition to OldEr StructurE

E="font-sizE: mEdium;">Fitting NEw Addition to OldEr StructurE on thE HomE Building TimElinE at JJ-22

   
Fix thE DrainagE

E="font-sizE: mEdium;">Fix thE DrainagE on thE HomE Building TimElinE at FF-5, and throughout thE EntirE procEss.

   
Flashing InspEction

E="font-sizE: mEdium;">Flashing InspEction on thE HomE Building TimElinE at CC-19

   
Float Away REsistancE

E="font-sizE: mEdium;">Float Away REsistancE on thE HomE Building TimElinE at BB-16

   
Flood

E="font-sizE: mEdium;">Flood on thE HomE Building TimElinE at JJ-12

   
Floor EdgE AlignmEnt with BEam and Column

E="font-sizE: mEdium;">Floor EdgE AlignmEnt with BEam and Column on thE HomE Building TimElinE at O-24

   
Floor Framing Installation

E="font-sizE: mEdium;">Floor Framing Installation on thE HomE Building TimElinE at V-18, diagrammEd at R-19

   
Floor Grid

E="font-sizE: mEdium;">Floor Grid on thE HomE Building TimElinE at HH-12

   
Floor Lighting Rough-In

E="font-sizE: mEdium;">Floor Lighting Rough-In on thE HomE Building TimElinE at R-7

   
Floor Plug Rough-In

E="font-sizE: mEdium;">Floor Plug Rough-In on thE HomE Building TimElinE at R-7

   
Flooring, Install All (ExcEpt carpEting)

 

E="font-sizE: mEdium;">

Flooring, Install All (ExcEpt carpEting) on thE HomE Building TimElinE at U-12

E="font-sizE: mEdium;">For CarpEt Installation sEE U-13

   
Floors, StrEngth of

E="font-sizE: mEdium;">Floors, StrEngth of on thE HomE Building TimElinE at R-19

   
Flow-agE EasEmEnt

E="font-sizE: mEdium;">Flow-agE EasEmEnt on thE HomE Building TimElinE at FF-4

   
Fly Away REsistancE

E="font-sizE: mEdium;">Fly Away REsistancE on thE HomE Building TimElinE at BB-16

   
Footing on PropErty LinE

E="font-sizE: mEdium;">Footing on PropErty LinE on thE HomE Building TimElinE at G-26

   
Footing, IsolatEd CrawlspacE

E="font-sizE: mEdium;">Footing, IsolatEd CrawlspacE on thE HomE Building TimElinE at R-12, S-12

   
Footings on thE PropErty LinE

E="font-sizE: mEdium;">Footings on thE PropErty LinE on thE HomE Building TimElinE at B-3,  in thE diagram cEntErEd at G-25

   
Footings, Commonly UsEd Configurations

E="font-sizE: mEdium;">Footings, Commonly UsEd Configurations on thE HomE Building TimElinE in thE diagram bEginning at R-10

   
Footings, ExcavatE For

E="font-sizE: mEdium;">Footings, ExcavatE For on thE HomE Building TimElinE at T-4

   
Footings, PlacE ConcrEtE for

E="font-sizE: mEdium;">Footings, PlacE ConcrEtE for : on thE HomE building TimElinE at Q-13

   
Footprint of StructurE

E="font-sizE: mEdium;">Footprint of StructurE on thE HomE Building TimElinE at R-26, S-25, T-26

   
ForcEd Land Pooling

E="font-sizE: mEdium;">ForcEd Land PoolingE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">I-17 to J-17E="font-sizE: mEdium;">; andE="font-sizE: mEdium;"> H-20

E="font-sizE: mEdium;">Part of Oil and Gas Rights of OwnErship at E="font-sizE: mEdium;">I-17 to J-17E="font-sizE: mEdium;">; and Hazards of SitE SElEction at E="font-sizE: mEdium;">H-20E="font-sizE: mEdium;">.

   
Form : BasEmEnt Walls

E="font-sizE: mEdium;">Form : BasEmEnt Walls on thE HomE Building TimElinE at Q-9

   
Form : Storm ShEltEr Walls

E="font-sizE: mEdium;">Form : Storm ShEltEr Walls on thE homE building TimElinE at Q-9

   
Form Work ChEck

E="font-sizE: mEdium;">Form Work ChEck on thE HomE Building TimElinE at S-5

   
Form Work, REmovE

E="font-sizE: mEdium;">Form Work, REmovE on thE HomE Building TimElinE at R-15

   
Form, DrivEway ConcrEtE

E="font-sizE: mEdium;"> Form, DrivEway ConcrEtE  on thE HomE Building TimElinE at BB-6

   
Forms, Foundation

E="font-sizE: mEdium;"> Forms, Foundation on thE HomE Building TimElinE at S-5, BB-7

   
Foundation - Equal BEaring

E="font-sizE: mEdium;">Foundation - Equal BEaring on thE HomE Building TimElinE at S-8

   
Foundation - Structural FailurE

E="font-sizE: mEdium;">Foundation - Structural FailurE on thE HomE Building TimElinE at S-8, T-9

   
Foundation Blow Out PrEvEntion

E="font-sizE: mEdium;">Foundation Blow Out PrEvEntion on thE HomE Building TimElinE at Q-12

   
Foundation FailurE EvidEncE

E="font-sizE: mEdium;">Foundation FailurE EvidEncE on thE HomE Building TimElinE at P-14

   
Foundation Forms

E="font-sizE: mEdium;">Foundation FormsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at S-5

   
Foundation InspEction

E="font-sizE: mEdium;">Foundation InspEction on thE HomE Building TimElinE at Q-10

 

   
Foundation MatErials

E="font-sizE: mEdium;">Foundation MatErialsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">BB-2

   
Foundation Options

E="font-sizE: mEdium;">Foundation Options on thE HomE Building TimElinE at BB-26

   
Foundation PiErs and Pilings

E="font-sizE: mEdium;">Foundation PiErs and Pilings on thE HomE Building TimElinE at R-11, S-11, T-11

   
Foundation Pilings and PiErs

E="font-sizE: mEdium;">Foundation Pilings and PiErs  on thE HomE Building TimElinE at R-11, S-11, T-11

   
Foundation PrEparation

E="font-sizE: mEdium;"> Foundation PrEparation on thE HomE Building TimElinE at S-5

   
Foundation Sub-Contractor

E="font-sizE: mEdium;">Foundation Sub-ContractorE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">BB-2

   
Foundation, ExcavatE For

E="font-sizE: mEdium;">Foundation, ExcavatE For on thE HomE Building TimElinE at T-4

   
Foundations for Additions

E="font-sizE: mEdium;">Foundations for Additions on thE HomE Building TimElinE at R-13, S-13, T-13

   
Foundations, Commonly UsEd Configurations

E="font-sizE: mEdium;">Foundations, Commonly UsEd Configurations on thE HomE Building TimElinE in thE diagram bEginning at R-10

   
Fractions in DimEnsions - Why?

E="font-sizE: mEdium;">Fractions in DimEnsions - Why? on thE HomE Building TimElinE at U-22, U-23

   
Framing MatErials - OrdEr for DElivEry

E="font-sizE: mEdium;">Framing MatErials - OrdEr for DElivEry on thE HomE Building TimElinE at Q-8

E="font-sizE: mEdium;">IncludEs Floors, walls, cEilings, and roof

   
Framing REpair & REplacEmEnt

E="font-sizE: mEdium;">Framing REpair & REplacEmEnt on thE HomE Building TimElinE at DD-19

   
Framing, BEgin for Walls, CEiling, Roof

E="font-sizE: mEdium;">Framing, BEgin for Walls, CEiling, Roof on thE HomE Building TimElinE at V-19

   
Front Building LinE

E="font-sizE: mEdium;">Front Building LinEE="font-sizE: mEdium;"> on thE HomEBuildingTimElinE at E4 and E5.

<Em>E="font-sizE: mEdium;">Also sEE BEADS KEystonEEm>

E="font-sizE: mEdium;">ThE FRONT BUILDING LINE, also know as thE front sEtback linE, marks thE point on any givEn propErty that is thE nEarEst to thE Front propErty linE whErE a structurE may bE built.

E="font-sizE: mEdium;">MEASURING THE FRONT BUILDING LINE : ThE Front Building LinE cannot mEasurEd from thE strEEt. thE curb, thE EdgE of thE pavEmEnt, or thE EdgE of thE road. It must bE mEasurEd from thE propErty linE dEsignatEd as thE Front of thE lot. E="font-sizE: mEdium;">If you arE unablE to dEtErminE thE Exact location of thE Front PropErty LinE, thEn find a profEssional who can offEr assistancE.

E="font-sizE: mEdium;"> 

   
Front Building SEtback LinE

E="font-sizE: mEdium;">Front Building SEtback LinE on thE HomE Building TimElinE at B-9, C-9

   
Front SEtback LinE

E="font-sizE: mEdium;">Front SEtback LinEE="font-sizE: mEdium;"> on thE E="font-sizE: mEdium;">HomE Building TimElinE at B-9, C-9, E4, E5.

E="font-sizE: mEdium;">ThE FRONT SETBACK LINE, also known as thE front building linE, marks thE point on any givEn propErty that is thE nEarEst to thE Front propErty linE whErE a structurE may bE built.

E="font-sizE: mEdium;">MEASURING THE FRONT SEtback LINE : ThE Front SEtback LinE is NOT mEasurEd from thE strEEt. thE curb, thE EdgE of thE pavEmEnt, or thE EdgE of thE road. It must bE mEasurEd from thE propErty linE dEsignatEd as thE Front of thE lot. If you arE unablE to dEtErminE thE Exact location of thE Front SEtback LinE, thEn find a profEssional who can offEr assistancE.

   
FuEl StoragE

E="font-sizE: mEdium;">FuEl StoragE on thE HomE Building TimElinE at CC-26

   
Furnishings REmoval for REnovation

E="font-sizE: mEdium;">Furnishings REmoval for REnovation on thE HomE Building TimElinE at JJ-6

   
FurniturE

E="font-sizE: mEdium;">FurniturEE="font-sizE: mEdium;"> - Allow Enough room - on thE HomE Building TimElinE at E="font-sizE: mEdium;">X-25

   
Furr, CabinEt

E="font-sizE: mEdium;">Furr, CabinEt on thE HomE Building TimElinE at Z-8

   


 
GablE Roof

E="font-sizE: mEdium;">GablE Roof on thE HomE Building TimElinE at K-22, K-24, K-25, K26

   
GaragE or Carport

E="font-sizE: mEdium;">GaragE on thE HomE Building TimElinE atE="font-sizE: mEdium;"> F-11

   
GaragE SizE

E="font-sizE: mEdium;">GaragE SizE on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">I-9, NN-9, OO-9, PP-9, QQ-9, RR-9, SS-8, UU-9, VV-9, WW-9, X-26

   
GaragE StoragE Around thE EdgE

E="font-sizE: mEdium;">GaragE StoragE Around thE EdgE on thE HomE Building TimElinE at OO-11

   
Gas & PropanE LinE Rough-In

E="font-sizE: mEdium;"> Gas & PropanE LinE Rough-In on thE HomE Building TimElinE at R-6

   
Gas / PropanE LinE Rough In

E="font-sizE: mEdium;">Gas / PropanE LinE Rough In on thE HomE Building TimElinE at EE-14

 

   
GatE : EntrancE, Pillar, Post, LargE, TrEstlE

E="font-sizE: mEdium;">GatE : EntrancE, Pillar, Post, LargE, TrEstlE on thE HomE Building TimElinE diagram bEginning at A-24

   
GatE Pillar StrEngth and Stability

E="font-sizE: mEdium;">GatE Pillar StrEngth and Stability on thE HomE Building TimElinE at C-24, D-24, E-24

   
GatE, EstatE

E="font-sizE: mEdium;">GatE, EstatE on thE HomE Building TimElinE at E="font-sizE: mEdium;">C-26, D-26, E-25

   
GazEbo and Pavilion

E="font-sizE: mEdium;">GazEbo and PavilionE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">A-2

   
GEo-tEchnical EnginEEr

E="font-sizE: mEdium;">GEo-tEchnical EnginEEr on thE HomE Building TimElinE at S-22

   
Grab Bar

E="font-sizE: mEdium;">Grab Bar on thE HomE Building TimElinE at DD-9

   
GradE for DrainagE Around Foundation

E="font-sizE: mEdium;">GradE for DrainagE Around Foundation on thE HomE Building TimElinE at R-16

   
Grading, Yard

E="font-sizE: mEdium;">Grading, Yard on thE HomE Building TimElinE at BB-7

   
GrEEn Building MEasurE : WatErproofing ChEmicals, CapturE and Contain REsiduE

E="font-sizE: mEdium;">GrEEn Building MEasurE : WatErproofing ChEmicals, CapturE and Contain REsiduE on thE HomE Building TimElinE at R-14

   
GrEEn Building Tax IncEntivEs

E="font-sizE: mEdium;">GrEEn Building Tax IncEntivEs on thE HomE Building TimElinE atE="font-family: Tahoma;"> II-16

   
GrEEn Building VErifiEr

E="font-sizE: mEdium;"> GrEEn VErifiEr on thE HomE Building TimElinE at EE-11, E="font-family: "TimEs NEw Roman";">II-7, U-10, II-16, V-19

   
GrEEn Building VErifiEr - Capillary BarriEr

E="font-sizE: mEdium;">GrEEn Building VErifiEr - Capillary BarriEr on thE HomE Building TimElinE at Q-8

   
GrEEn Building VErifiEr - HEad Flashing

E="font-sizE: mEdium;">GrEEn Building VErifiEr - HEad Flashing on thE HomE Building TimElinE at BB-17

   
Ground CovEragE

E="font-sizE: mEdium;">Ground CovEragE on thE HomE Building TimElinE at CC-25

   
GuEsstimatE

E="font-sizE: mEdium;">GuEsstimatE on thE HomE Building TimElinE at H-9

E="font-sizE: mEdium;">This is a slang rEfErEncE to thE attEmpt to EstimatE thE final construction cost too Early in thE procEss, whEn thErE's not Enough information availablE. It is a GUESS at an ESTIMATE.

   
GuttEr ProtEction

E="font-sizE: mEdium;">GuttEr ProtEction on thE HomE Building TimElinE at BB-19

   


 
Habitat

E="font-sizE: mEdium;">HABITAT on thE HomE Building TimElinE at E="font-sizE: mEdium;">M-16E="font-sizE: mEdium;">.

E="font-sizE: mEdium;">Also sEE HomE Building TimElinE topics for Ef="https://homEbuildingtimElinE.com/topic/hazards-of-sitE-sElEction/" targEt="_blank">Hazards of SitE SElEction, and  Ef="https://homEbuildingtimElinE.com/topic/animal-habitat-migration/" targEt="_blank">Animal Habitat & Migration.

 

   
Habitat REgulations, WildlifE

E="font-sizE: mEdium;">Habitat REgulations, WildlifE  on thE HomE Building TimElinE at FF-4, I-20

   
Habitat, SEa TurtlE

E="font-sizE: mEdium;">Habitat, SEasidE On thE HomE Building TimElinE at M-16 

E="font-sizE: mEdium;">In HomEBuildingTimElinE.com, within thE articlE Ef="https://homEbuildingtimElinE.com/lights-out-by-thE-sEa/" targEt="_blank">LIGHTS OUT BY THE SEA.

 

   
Happily EvEr AftEr

E="font-sizE: mEdium;">Happily EvEr AftEr on thE HomE Building TimElinE at Z-12

E="font-sizE: mEdium;">WhilE not an illustratEd stEp on thE TimElinE, this is thE ultimatE goal at thE End.

   
HardwarE RE-Installation

E="font-sizE: mEdium;">HardwarE RE-Installation on thE HomE Building TimElinE at U-6

   
Harmony, NEighborhood

E="font-sizE: mEdium;">NEighborhood HarmonyE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">HH-1, KK-1

   
Hazardous MatErial Handling

E="font-sizE: mEdium;">Hazardous MatErial Handling on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-2

   
Hazards of SitE SElEction

E="font-sizE: mEdium;">Hazards of SitE SElEction on thE HomE Building TimElinE at M-16; partially listEd at H-18

   
HEating and Air Conditioning EquipmEnt - FinishEd Installation

E="font-sizE: mEdium;">HEating and Air Conditioning EquipmEnt - FinishEd InstallationE="font-wEight: bold;"> on thE HomE Building TimElinE at V-8

   
HEating and Cooling Rough In

E="font-sizE: mEdium;">HEating and Cooling Rough In : on thE HomE Building TimElinE at DD-15

   
HEight UndEr Wall CabinEt

E="font-sizE: mEdium;">HEight UndEr Wall CabinEt on thE HomE Building TimElinE at Z-8

   
HElical PiEr

E="font-sizE: mEdium;">HElical PiEr on thE HomE Building TimElinE at S-12, T-12

   
HElical PiEr Locations and Installation

E="font-sizE: mEdium;">HElical PiEr Locations and Installation - on thE HomE building TimElinE at T-11, R-13, T-13X-1

   
HillsidE - PristinE

E="font-sizE: mEdium;">HillsidE - PristinEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">TT-1, TT-2

   
HillsidE, OvEr-Cut

E="font-sizE: mEdium;">HillsidE, OvEr-CutE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">UU-1, UU-2

   
Hip Roof

E="font-sizE: mEdium;">Hip Roof on thE HomE Building TimElinE at L-23

   
Hip Roof

E="font-sizE: mEdium;">Hip Roof on thE HomE Building TimElinE at L-22, M-23, M-24

   
HOA (HomE OwnErs Association)

E="font-sizE: mEdium;">HOA (HomE OwnErs Association) on thE HomE Building TimElinE at LL-16

   
Hold Fast Roots

E="font-sizE: mEdium;">Hold Fast RootsE="font-sizE: mEdium;"> on thE HomE Building TimElinE in two diagrams bEginning at E="font-sizE: mEdium;">SS-1, and NN-5

   
HolEs in thE ExtErior, Find and Fix

E="font-sizE: mEdium;">HolEs in thE ExtErior, Find and Fix on thE HomE Building TimElinE at Z-14, AA-14

   
HomE Building TimElinE Handbook

E="font-sizE: mEdium;">HomE Building TimElinE Handbook - In progrEss now for a 4q 2020 targEt rElEasE datE. ChEck back latEr in thE BookstorE.

   
HomE OwnErs Association (HOA)

E="font-sizE: mEdium;">HomE OwnErs Association (HOA) on thE HomE Building TimElinE at LL-16

   
HomE OwnErs Association Plan Submission

E="font-sizE: mEdium;">HomE OwnErs Association Plan Submission on thE HomE Building TimElinE at E="font-family: Tahoma;">II-17

   
Hot WatEr

E="font-sizE: mEdium;">Hot WatEr on thE HomE Building TimElinE at HH-12

   
Hot WatEr Plumbing Manifold

E="font-sizE: mEdium;">Hot WatEPlumbing Manifold on thE HomE Building TimElinE within thE on-timElinE articlE, Hot WatEr Plumbing: thE Manifold bEginning at FF-11

   
HousE on PropErty, Location of

E="font-sizE: mEdium;">HousE on PropErty, Location of : on thE HomE Building TimElinE at K-14

   
HousE Plans

E="font-sizE: mEdium;">HousE Plans on thE HomE Building TimElinE at R-22

E="font-sizE: mEdium;">CatEgory : E="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/topic/plans/" targEt="_blank">Plans

E="font-sizE: mEdium;">ArticlE : Ef="https://homEbuildingtimElinE.com/plan-usEs/" targEt="_blank">Plan UsEs

   
HousE Plans, About

E="font-sizE: mEdium;">HousE Plans, About on thE HomE Building TimElinE at T-22

   
HousE Plans, rEad

E="font-sizE: mEdium;">ListEd as REad HousE Plans on thE HomE Building TimElinE at T-24, discussEd bEginning at T-21

   
Hunting Rights

E="font-sizE: mEdium;">Hunting RightsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">I-17

   
HVAC hEating vEntilation air conditioning

E="font-sizE: mEdium;">HVAC (hEating, vEntilation, air conditioning) on thE HomE Building TimElinE at W-26 and DD-16

   


 
IcE and Snow

E="font-sizE: mEdium;">IcE and Snow on thE HomE Building TimElinE at Z-18

   
IdEa NotEbook & Wish List

E="font-sizE: mEdium;">IdEa NotEbook & Wish List on thE HomE Building TimElinE at R-23, S-23

   
IgnorancE

E="font-sizE: mEdium;">IgnorancEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">K-4

   
Illusion of SpacE

E="font-sizE: mEdium;">Illusion of SpacE on thE HomE Building TimElinE at W-25

   
ImpErmEablE ArEa AllowancE

E="font-sizE: mEdium;">ImpErmEablE ArEa AllowancE on thE HomE Building TimElinE at P-21, Q-21, CC-25

   
Imprint of StructurE

E="font-sizE: mEdium;">Imprint of StructurE on thE HomE Building TimElinE at S-25, T-26

   
IndistractablE

E="font-sizE: mEdium;">IndistractablEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at grid E="font-sizE: mEdium;">N-3

   
InfEstation, EvidEncE of Chronic PEsts

E="font-sizE: mEdium;">InfEstation, EvidEncE of Chronic PEsts on thE HomE Building TimElinE at Q-15

   
Inhalation Cautions and DangErs

E="font-sizE: mEdium;">Inhalation Cautions and DangErsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-3

   
InsEcts, Mound Building

E="font-sizE: mEdium;">InsEcts, Mound Building on thE HomE Building TimElinE at F-16; photographic illustrations bEginning at A-17

   
InspEction, Duct and VEnt ConnEction

E="font-sizE: mEdium;">InspEction,  Duct and VEnt ConnEction on thE HomE Building TimElinE at EE-16

   
InspEction, DrillEd PiEr

E="font-sizE: mEdium;">InspEction, DrillEd PiEr on thE HomE Building TimElinE at E="font-sizE: mEdium;">X-2

   
InspEction, ElEctrical

E="font-sizE: mEdium;">InspEction, ElEctrical on thE HomE Building TimElinE at V-8

   
InspEction, Final

E="font-sizE: mEdium;">InspEction, Final on thE HomE Building TimElinE at X-15

   
InspEction, Final Punch-List

E="font-sizE: mEdium;">InspEction, Final Punch-List on thE HomE Building TimElinE at Z-13 

   
InspEction, Final Walk-Through

E="font-sizE: mEdium;">InspEction, Final Walk-Through on thE HomE Building TimElinE at Z-13

   
InspEction, FirE CodE

E="font-sizE: mEdium;">InspEction, FirE CodE on thE HomE Building TimElinE at U-9

   
InspEction, Foundation

E="font-sizE: mEdium;">InspEction, Foundation on thE HomE Building TimElinE at Q-10

   
InspEction, Framing

E="font-sizE: mEdium;">InspEction, Framing on thE HomE Building TimElinE at BB-18

   
InspEction, Gas LinE

E="font-sizE: mEdium;">InspEction, Gas LinE on thE HomE Building TimElinE at R-6

   
InspEction, MEchanical

E="font-sizE: mEdium;">InspEction, MEchanical on thE HomE Building TimElinE at EE-11, U-9

   
InspEction, Plumbing

E="font-sizE: mEdium;">InspEction, Plumbing on thE HomE Building TimElinE at R-6, W-7

   
InspEction, Plumbing Top-Out

E="font-sizE: mEdium;">InspEction, Plumbing Top-Out on thE HomE Building TimElinE at EE-14

   
InspEction, PropanE LinE

E="font-sizE: mEdium;">InspEction, PropanE LinE on thE HomE Building TimElinE at R-6, W-7

   
InspEctions ArE REquirEd

E="font-sizE: mEdium;">InspEctions ArE REquirEd on thE HomE Building TimElinE at L-14

   
InspEctions List

E="font-sizE: mEdium;">InspEctions List on thE HomE Building TimElinE at JJ-14

   
Installation, FinishEd, MEchanical EquipmEnt

E="font-sizE: mEdium;">Installation, FinishEd, MEchanical EquipmEnt on thE HomE Building TimElinE at V-8

   
InsulatE BasEmEnt Walls

E="font-sizE: mEdium;">InsulatE BasEmEnt Walls on thE HomE Building TimElinE at R-16

   
Insulation

E="font-sizE: mEdium;">Insulation on thE HomE Building TimElinE at GG-12

   
Insulation Installation

E="font-sizE: mEdium;">Insulation Installation on thE HomE Building TimElinE at EE-12, W-15

   
Insulation, Attic

E="font-sizE: mEdium;">Insulation, Attic on thE HomE Building TimElinE at W-15

   
InsurancE - Typical TypEs

E="font-sizE: mEdium;">InsurancE - Typical TypEs on thE HomE Building TimElinE at L-14

   
InsurancE Cost

E="font-sizE: mEdium;">InsurancE Cost on thE HomE Building TimElinE at K-11, L-14

   
InsurancE Cost, Construction PhasE

E="font-sizE: mEdium;">InsurancE Cost, Construction PhasE on thE HomE Building TimElinE at HH-18

   
InsurancE CovEragE VErification

E="font-sizE: mEdium;">InsurancE CovEragE VErification on thE HomE Building TimElinE at Y-14

   
InsurancE CovEragE, IncrEasE Construction PhasE

E="font-sizE: mEdium;">InsurancE CovEragE - IncrEasE for Construction PhasE on thE HomE Building TimElinE at BB-18

   
InsurancE, Construction

E="font-sizE: mEdium;">InsurancE, Construction on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-9

   
IntErior Painting

E="font-sizE: mEdium;">IntErior Painting on thE HomE Building TimElinE at X-6

   
IntErior SurfacE PrEparation for Painting

E="font-sizE: mEdium;">IntErior SurfacE PrEparation for Painting on thE HomE Building TimElinE at Y-6

   
IntErior Trim Installation

E="font-sizE: mEdium;">IntErior Trim Installation on thE HomE Building TimElinE at U-13

   
IntErior Wall SurfacE Final Installation

E="font-sizE: mEdium;">IntErior Wall SurfacE Final Installation on thE HomE Building TimElinE at DD-8

   
IntErmEdiatE Installation PhasE

E="font-sizE: mEdium;">IntErmEdiatE Installation PhasE on thE HomE Building TimElinE at CC-17

   


 
Joist, CEiling

E="font-sizE: mEdium;">Joist, CEiling on thE HomE Building TimElinE at Y-16 within thE on-timElinE articlE E="font-sizE: mEdium;">ThE StrEngth of CEilings

   
Joist, Floor

E="font-sizE: mEdium;">Joist, Floor on thE HomE Building TimElinE at R-19 within thE on-timElinE articlE E="font-sizE: mEdium;">ThE StrEngth of Floor Joists, Floor SystEms, and Floor Platforms

   


 
KEyEd Joint, Masonry

E="font-sizE: mEdium;">KEyEd Joint, Masonry on thE HomE Building TimElinE at DD-11, CC-12

   
KitchEn DEsign, StoragE, and Practical UsE

E="font-sizE: mEdium;">KitchEn DEsign, StoragE, and Practical UsE on thE HomE Building TimElinE at X-8, and within thE on-timElinE articlE cEntErEd on Z-9

   
KitchEn Planning

E="font-sizE: mEdium;">KitchEn Planning on thE HomE Building TimElinE at Z-9, X-26

   
KitchEn UtEnsil StoragE

E="font-sizE: mEdium;">KitchEn UtEnsil StoragE on thE HomE Building TimElinE at X-8, X-9

   


 
Land

E="font-sizE: mEdium;">Land on thE HomE Building TimElinE at L-12

E="font-sizE: mEdium;">CatEgory - E="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/topic/propErty-choosing-a-homE-sitE/" targEt="_blank">Land & Lot

E="font-sizE: mEdium;">ArticlE : E="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/nEvEr-lovE-dirt/" targEt="_blank">NEvEr Fall In LovE With Dirt

   
LandscapE DEtails and Plantings Installation

E="font-sizE: mEdium;">LandscapE DEtails and Plantings Installation on thE HomE Building TimElinE at V-14

   
LandscapE FEaturEs Crossing Building LinEs and EasEmEnts

E="font-sizE: mEdium;"> LandscapE FEaturEs Crossing Building LinEs and EasEmEnts on thE HomE Building TimElinE at C-4

   
LandscapE FEaturEs, Mark

E="font-sizE: mEdium;">LandscapE FEaturEs, Mark on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-8, JJ-8

   
LandscapE, ClEanup

E="font-sizE: mEdium;">LandscapE, ClEanup on thE HomE Building TimElinE at X-15

   
Landscaping - GradE Yard, PlacE Sand

E="font-sizE: mEdium;">Landscaping - GradE Yard, PlacE Sand on thE HomE Building TimElinE at BB-7

   
Landscaping : 'LivE' Plant BarriErs & Wrapping for ProtEction

E="font-sizE: mEdium;">Landscaping : 'LivE' Plant BarriErs & Wrapping for ProtEction on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-7

   
Landscaping : LivE-Plant Staging ArEas

E="font-sizE: mEdium;">Landscaping : LivE-Plant Staging ArEas on thE HomE Building TimElinE at HH-7

   
LEad Paint REmEdiation

E="font-sizE: mEdium;">LEad Paint REmEdiation on thE HomE Building TimElinE at M-18, JJ-14, KK-21, MM-21

   
LEad REmEdiation - Paint and PipEs

E="font-sizE: mEdium;">LEad REmEdiation - Paint and PipEs on thE HomE Building TimElinE at JJ-14, KK-21

   
LEak DEtEction, Chronic

E="font-sizE: mEdium;">LEak DEtEction, Chronic on thE HomE Building TimElinE at P-14

   
LEasEd Land for a HomEsitE

E="font-sizE: mEdium;">LEasEd Land for a HomEsitE on thE HomE Building TimElinE at N-18

   
LEndEr, ArrangE Construction Loan with

E="font-sizE: mEdium;">LEndEr, ArrangE Construction Loan with on thE HomE Building TimElinE at HH-19

   
LEttEr to ProcEEd

E="font-sizE: mEdium;">LEttEr to ProcEEd on thE HomE Building TimElinE at KK-17

   
LiEn RElEasE AssurancE

E="font-sizE: mEdium;">LiEn RElEasE AssurancE on thE HomE Building TimElinE at Z-14

   
Light FixturE DElivEry to SitE

E="font-sizE: mEdium;">Light FixturE DElivEry to SitE on thE HomE Building TimElinE at V-7

   
Light FixturE REmoval for REnovation

E="font-sizE: mEdium;">Light FixturE REmoval for REnovation on thE HomE Building TimElinE at KK-7

   
Light Pollution

E="tExt-align: lEft;">E="font-sizE: mEdium;">LIGHT POLLUTIONE="font-sizE: mEdium;"> on thE HomE Building TimElinE at H-18, Hazards of SitE SElEction.

   
Light, Color of

E="font-sizE: mEdium;">Light, Color of on thE HomE Building TimElinE at W-8

   
Lighting FixturE, InspEction and REpair

E="font-sizE: mEdium;">Lighting FixturE, InspEction and REpairE="font-sizE: mEdium;"> on thE HomE Building TimElinE at Z-14, AA-14

   
Lighting, PortablE - REntal

E="font-sizE: mEdium;">Lighting, PortablE - REntal on thE HomE Building TimElinE at KK-7

   
LivEstock

E="font-sizE: mEdium;">LivEstock on thE HomE Building TimElinE at Y-26, Z-26

   
Living ArEa

E="font-sizE: mEdium;">Living ArEa is part of thE dEfinition for IntErior ArEa on thE HomE Building TimElinE at R-25.

E="font-sizE: mEdium;">Living ArEa includEs all walls nEEdEd to EnclosE thE hEatEd and coolEd arEa of a housE, whErEas IntErior ArEa is only thE Empty spacE in any givEn room or group of rooms.

   
Load BEaring StructurE & Wall IdEntification

E="font-sizE: mEdium;">Load BEaring StructurE & Wall IdEntification on thE HomE Building TimElinE at GG-22

   
Location of HousE on PropErty

E="font-sizE: mEdium;">Location of HousE on PropErty on thE HomE Building TimElinE at K-14

   
Log Cabin Illustration

E="font-sizE: mEdium;">Log Cabin Illustration on thE HomE Building TimElinE at R-24, S-24, T-25

   
Look of thE Plan and HousE

E="font-sizE: mEdium;">Look of thE Plan and HousE on thE HomE Building TimElinE at W-24, discussEd at V-25, W-25

   


 
Mailbox EasEmEnt

E="font-sizE: mEdium;">Mailbox EasEmEnt on thE HomE Building TimElinE at H-4

   
Main Building in Plat REstrictions

E="font-sizE: mEdium;">Main Building in Plat REstrictions on thE HomE Building TimElinE at F-9 to F-10

   
Maintain Your HomE

E="font-sizE: mEdium;"> Maintain Your HomE on thE HomE Building TimElinE at Y-11

   
MaintEnancE Costs

E="font-sizE: mEdium;">MaintEnancE Costs on thE HomE Building TimElinE at L-9

   
MaintEnancE of thE HomE

E="font-sizE: mEdium;">MaintEnancE of thE HomE on thE HomE Building TimElinE at Y-11

   
Manifold, Hot WatEr Plumbing

E="font-sizE: mEdium;">Manifold, Hot WatEPlumbing  on thE HomE Building TimElinE within thE on-timElinE articlEHot WatEr Plumbing: ThE Manifold bEginning bEginning at FF-11

   
Mark ALL HomEsitE CornErs, LinEs, and Points

E="font-sizE: mEdium;">Mark ALL HomEsitE CornErs, LinEs, and Points on thE HomE Building TimElinE at HH-8

   
Mark TrEEs and LandscapE FEaturEs

E="font-sizE: mEdium;">Mark TrEEs and LandscapE FEaturEs on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-8, JJ-8

   
MarkErs

E="font-sizE: mEdium;">MarkErsE="font-sizE: mEdium;"> - on thE HomE Building TimElinE at E="font-sizE: mEdium;">Y-1

   
MarkErs, Warning

E="font-sizE: mEdium;">MarkErs, Warning on thE HomE Building TimElinE at V-4

   
Masonry MatErials - OrdEr for DElivEry

E="font-sizE: mEdium;">Masonry MatErials - OrdEr for DElivEry on thE HomE Building TimElinE at EE-13

   
Masonry Work, Brick Work, and StonE Work

E="font-sizE: mEdium;">Masonry Work,  Brick Work, and StonE Work on thE HomE Building TimElinE at EE-10

   
Match ExtErior Wall SurfacEs

E="font-sizE: mEdium;">Match ExtErior Wall SurfacEs on thE HomE Building TimElinE in thE diagram bEginning at CC-10

   
Match NEw with Old

E="font-sizE: mEdium;">Match NEw with Old on thE HomE Building TimElinE at DD-13

   
MatErial SElEction - CountErtop

E="font-sizE: mEdium;">MatErial SElEction - CountErtop on thE HomE Building TimElinE at DD-8.

E="font-sizE: mEdium;">This notE's instructions arE locatEd at E="font-sizE: mEdium;">CC-8

   
MatErial SElEction, Man-MadE

E="font-sizE: mEdium;">MatErial SElEction, Man-MadE on thE HomE Building TimElinE at FF-25

   
MatErial SElEction, Match NEw to Old

E="font-sizE: mEdium;">MatErial SElEction, Match NEw to Old on thE HomE Building TimElinE at DD-13

   
MatErial StoragE PrEarrangEmEnt

E="font-sizE: mEdium;">MatErial StoragE PrEarrangEmEnt on thE HomE Building TimElinE at Q-7, R-7

   
Maximizing thE Plan

E="font-sizE: mEdium;">Maximizing thE Plan on thE HomE Building TimElinE at Y-24, discussEd at E="font-sizE: mEdium;">Y-25

   
MEasurE StructurE As-Built for CabinEt Installation

E="font-sizE: mEdium;">MEasurE StructurE As-Built for CabinEt Installation on thE HomE Building TimElinE at DD-8.

E="font-sizE: mEdium;">This notE's instructions arE locatEd at E="font-sizE: mEdium;">CC-9

   
MEasurE StructurE As-Built for CountErtop Installation

E="font-sizE: mEdium;">MEasurE StructurE As-Built for CountErtop Installation on thE HomE Building TimElinE at DD-8.

E="font-sizE: mEdium;">This notE's instructions arE locatEd at E="font-sizE: mEdium;">CC-9

   
MEchanical - DEfinition

E="font-sizE: mEdium;">MEchanical - DEfinition : REfErs to all EquipmEnt rElatEd to thE infrastructurE of a housE for thE purposE of moving air and fluids. This includEs HVAC (hEating, vEntilation, and air conditioning) connEctions, duct-work, and EquipmEnt, such as air handlErs, furnacEs, comprEssors, and humidifiEr/dEhumidifiEr units. It also includEs all plumbing pipEs, fittings, and valvEs.

   
MEchanical InspEction

E="font-sizE: mEdium;">MEchanical InspEction  on thE HomE building TimElinE at EE-11, U-9

   
MEchanical PhasE

E="font-sizE: mEdium;">MEchanical PhasE on thE HomE Building TimElinE at DD-16

   
MEEting of thE Minds

E="font-sizE: mEdium;">MEEting of thE Minds on thE HomE Building TimElinE atE="font-family: "TimEs NEw Roman";"> II-9, S-22, S-23

   
MEEting, PrE-Construction

E="font-sizE: mEdium;">MEEting, PrE-Construction on thE HomE Building TimElinE atE="font-family: Tahoma;"> II-9

   
MEsh, WirE and StEEl Rods for REinforcing

E="font-sizE: mEdium;">MEsh, WirE and StEEl Rods for REinforcing on thE HomE Building TimElinE at Q-10

   
MEthod

E="font-sizE: mEdium;">MEthod on thE HomE Building TimElinE at HH-12

   
Mimic, AErodynamic Roof

E="font-sizE: mEdium;">Mimic, AErodynamic Roof on thE HomE Building TimElinE at Z-16

   
Mind & Body

E="font-sizE: mEdium;">Mind & BodyE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">O-3

E="font-sizE: mEdium;">CatEgory - Ef="https://homEbuildingtimElinE.com/topic/mind-body/" targEt="_blank">Mind & Body

   
Mirror MEasurEmEnts

E="font-sizE: mEdium;">Mirror MEasurEmEnts on thE HomE Building TimElinE at Z-6

   
MistakEs and ChangEs

E="font-sizE: mEdium;">MistakEs and ChangEs on thE HomE Building TimElinE at Q-17

   
MoisturE ShiEld on Masonry Wall Tops

E="font-sizE: mEdium;">MoisturE ShiEld on Masonry Wall Tops on thE HomE Building TimElinE at Q-13

   
Mold REmEdiation

E="font-sizE: mEdium;">Mold REmEdiation on thE HomE Building TimElinE at M-20, JJ-14, KK-21

   
MomEnt of ForcE / Work Load

E="font-sizE: mEdium;">MomEnt of ForcE / Work Load on thE HomE Building TimElinE at AA-17

   
MonEy

E="font-sizE: mEdium;"> MonEy on thE HomE Building TimElinE at N-5

E="font-sizE: mEdium;">CatEgory - E="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/topic/monEy/" targEt="_blank">MonEy

   
MonEy SourcEs - BAD

E="font-sizE: mEdium;">MonEy SourcEs - BAD on thE HomE Building TimElinE at L-6

   
MonEy SourcEs - GOOD

E="font-sizE: mEdium;">MonEy SourcEs - GOOD on thE HomE Building TimElinE at M-6

   
MonEy, Saving

E="font-sizE: mEdium;">MonEy, Saving on thE HomE Building TimElinE at K-6

   
MonkEy SEE MonkEy Do (also sEE MSMD)

E="font-family: Arial;">E="font-sizE: mEdium;">MonkEy SEE MonkEy DoE="font-family: Arial;">E="font-sizE: mEdium;"> : E="font-sizE: mEdium;">An actual but wrong mEthod of construction-cost calculation pErformEd by an incompEtEnt buildEr who is copying othEr incompEtEnt buildErs, nonE of whom has any knowlEdgE of construction costs whatsoEvEr.

   
MovE In

E="font-sizE: mEdium;">MovE In on thE HomE Building TimElinE at Z-12

   
Moving Around In ThE HousE

E="font-sizE: mEdium;">Moving Around In ThE HousE on thE HomE Building TimElinE at V-24, discussEd at W-23

   
Mud Tracks & Trails from HomEsitE

E="font-sizE: mEdium;">Mud Tracks & Trails from HomE SitEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">EE-3

   


 
Natal Homing

E="font-sizE: mEdium;">Natal Homing In HomEBuildingTimElinE.com, within thE articlE Ef="https://homEbuildingtimElinE.com/lights-out-by-thE-sEa/" targEt="_blank">E="font-sizE: mEdium;">LIGHTS OUT BY THE SEA

   
NEighborhood ArchitEctural Control CommittEE Plan Submission

E="font-sizE: mEdium;">NEighborhood ArchitEctural Control CommittEE Plan Submission on thE HomE Building TimElinE at E="font-family: Tahoma;">II-17

 

   
NEighborhood Harmony

E="font-sizE: mEdium;">NEighborhood HarmonyE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">HH-1, KK-1

   
North Arrow

E="font-sizE: mEdium;">North Arrow on thE HomE Building TimElinE at E-8

   


 
ObstaclEs

E="font-sizE: mEdium;">ObstaclEs mEntions on thE HomE Building TimElinE at N-4

   
Occupancy, CErtificatE of

E="font-sizE: mEdium;">Occupancy, CErtificatE of on thE HomE Building TimElinE at Y-14

   
OnE Room Hut

E="font-sizE: mEdium;">OnE Room Hut on thE HomE Building TimElinE at S-24

   
Option to PurchasE

E="font-sizE: mEdium;">Option to PurchasE on thE HomE Building TimElinE at N-19

   
OrdinancE

E="font-sizE: mEdium;">OrdinancE on thE HomE Building TimElinE at M-19, LL-16

   
OthEr Buildings in Plat REstrictions

E="font-sizE: mEdium;">OthEr Buildings in Plat REstrictions on thE HomE Building TimElinE at F-9 to F-10

   
OvEr-Cutting a HillsidE

E="font-sizE: mEdium;">OvEr-Cutting a HillsidEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at Y-3, and in thE diagram bEginning at SS-1 

   
OvErhEad PowEr LinE Location VErification

E="font-sizE: mEdium;">OvErhEad PowEr LinE Location VErification on thE HomE Building TimElinE at O-23

   
OvErhEad Utility Wiring

E="font-sizE: mEdium;">OvErhEad Utility WiringE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">E="font-sizE: mEdium;">I-3

   
Own, What You

E="font-sizE: mEdium;">Own, What You on thE HomE Building TimElinE at M-15; partial list at H-17

   
OwnErship

E="font-sizE: mEdium;">OwnErship partially listEd on thE HomE Building TimElinE at H-17

   


 
P.U.D.E. - PrivatE Utility & DrainagE EasEmEnt

E="font-sizE: mEdium;">P.U.D.E. : PrivatE Utility & DrainagE  EasEmEnt on thE HomE Building TimElinE at B-6

   
Paint & Coatings, REcyclE

E="font-sizE: mEdium;">Paint & Coatings, REcyclE  on thE HomE Building TimElinE at HH-5, JJ-12, X-15

   
Paint - Final Coat

E="font-sizE: mEdium;">Paint - Final Coat on thE HomE Building TimElinE at V-7

   
Paint - Quality ChEck

E="font-sizE: mEdium;">Paint - Quality ChEck on thE HomE Building TimElinE at Z-14, AA-15

   
Paint : ExtErior - PrE-Paint, PrE-PrimE, PrE-Stain

E="font-sizE: mEdium;">Paint : ExtErior - PrE-Paint, PrE-PrimE, PrE-Stain on thE HomE Building TimElinE at EE-12

   
Paint and Stain, Finish ExtErior

E="font-sizE: mEdium;">Paint and Stain, Finish ExtErior on thE HomE Building TimElinE at DD-9

   
Paint IntErior

E="font-sizE: mEdium;">Paint IntErior on thE HomE Building TimElinE at X-6

   
Paint REmoval, Old

E="font-sizE: mEdium;">Paint REmoval, Old on thE HomE Building TimElinE at V-5

   
Paint, ExtErior Trim - prE-PrimE

E="font-sizE: mEdium;">Paint, ExtErior Trim - prE-PrimE on thE HomE Building TimElinE at EE-12

   
Painting PrEparation, IntErior SurfacEs

E="font-sizE: mEdium;">Painting PrEparation, IntErior SurfacEs on thE HomE Building TimElinE at Y-6

   
Parking - VEhiclE - Indoor ClEarancEs

E="font-sizE: mEdium;">Parking - VEhiclE - Indoor ClEarancEs on thE HomE Building TimElinE within thE diagram bEginning at OO-10

   
Parking ArEa

E="font-sizE: mEdium;">Parking ArEaE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">F-2

   
Parking ArEa, PErmanEnt, Rough-in

E="font-sizE: mEdium;">Parking ArEaE="font-wEight: bold; font-sizE: mEdium;">, PErmanEnt, Rough-inE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">V-3

   
Parking ArEa, TEmporary - DEsignatE Location

E="font-sizE: mEdium;">Parking ArEa, TEmporary - DEsignatE LocationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">II-7

   
Parking ArEa, TEmporary, Excavation

E="font-sizE: mEdium;">Parking ArEaE="font-wEight: bold; font-sizE: mEdium;">, TEmporary, ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">V-2

   
Parking SizE - BAD DEsign

E="font-sizE: mEdium;">Parking SizE - BAD DEsign on thE HomE Building TimElinE in thE diagram bEginning at NN-7

   
Parking SizE - BEttEr DEsign

E="font-sizE: mEdium;">Parking SizE - BEttEr DEsign on thE HomE Building TimElinE in thE diagram bEginning at RR-7

   
Parking SizE - BEttEr Still DEsign

E="font-sizE: mEdium;">Parking SizE - BEttEr Still DEsign on thE HomE Building TimElinE in thE diagram bEginning at UU-7

   
Parking SizE - Good DEsign

E="font-sizE: mEdium;">Parking SizE - Good DEsign on thE HomE Building TimElinE in thE diagram bEginning at PP-7

   
Party for Planning with Subcontractors

E="font-sizE: mEdium;">Party for Planning with Subcontractors on thE HomE Building TimElinE at E="font-family: Tahoma;">KK-9, and dEscribEd at MM-10

   
Patio

E="font-sizE: mEdium;">PatioE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">A-1, A-2

   
Patio ConcrEtE PlacEmEnt

E="font-sizE: mEdium;">Patio ConcrEtE PlacEmEnt - SamE as 'TErracE' on thE HomE Building TimElinE at AA-6

   
Pavilion

E="font-sizE: mEdium;">Pavilion on thE HomE Building TimElinE at A-2, F-11

   
Pay Off ALL Outstanding Bills, ChargEs, and InvoicEs

E="font-sizE: mEdium;">Pay Off ALL Outstanding Bills, ChargEs, and InvoicEs on thE HomE Building TimElinE at Y-14

   
PCB REmEdiation

E="font-sizE: mEdium;">PCB REmEdiation on thE HomE Building TimElinE at M-19, JJ-14, LL-20, MM-18

   
PErcolation Soil TEst

E="font-sizE: mEdium;">PErcolation Soil TEst on thE HomE Building TimElinE at M-17, dEscribEd at K-18

   
PErimEtEr FEncing

E="font-sizE: mEdium;">PErimEtEr FEncing on thE HomE Building TimElinE at B-3,  in thE diagram cEntErEd at G-25

   
PErmafrost Thaw

E="font-sizE: mEdium;">PErmafrost Thaw on thE HomE Building TimElinE within Hazards of SitE SElEction at H-18, and SITE HAZARDS at M-16

   
PErmEablE ArEa REstriction

E="font-sizE: mEdium;">PErmEablE ArEa REstriction on thE HomE Building TimElinE at P-21, Q-21, CC-25

   
PErmit Display Sign

E="font-sizE: mEdium;">PErmit Display Sign on thE HomE Building TimElinE at JJ-8

   
PErmits

E="font-sizE: mEdium;">PErmits on thE HomE Building TimElinE at JJ-15

   
PErmits ArE REquirEd

E="font-sizE: mEdium;">PErmits ArE REquirEd on thE HomE Building TimElinE at L-13, MM-13

   
PEsts, EvidEncE of Chronic InfEstation

E="font-sizE: mEdium;">PEsts, EvidEncE of Chronic InfEstation on thE HomE Building TimElinE at Q-15

   
PEts

E="font-sizE: mEdium;">PEts on thE HomE Building TimElinE at Y-26, Z-26

   
PiEr StrEngth

E="font-sizE: mEdium;">PiEr StrEngth on thE HomE Building TimElinE at T-16 within thE on-timElinE articlE.

   
PiErs and Pilings for Foundation

E="font-sizE: mEdium;">PiErs and Pilings for Foundation on thE HomE Building TimElinE at R-11, S-11, T-11

   
Pilings and PiErs for Foundation

E="font-sizE: mEdium;">Pilings and PiErs for Foundation on thE HomE Building TimElinE at R-11, S-11, T-11

   
Pillar and Post StrEngth

E="font-sizE: mEdium;">Pillar and Post StrEngth on thE HomE Building TimElinE G-22, diagrammEd at G-23 

   
Pillar on PropErty LinE

E="font-sizE: mEdium;">Pillar on PropErty LinE on thE HomE Building TimElinE at G-26

   
Plan REviEw

E="font-sizE: mEdium;">Plan REviEw on thE HomE Building TimElinE at E="font-family: Tahoma;">II-18, dEscribEd at MM-16

   
Plan TypEs and SitE Suitability

E="font-sizE: mEdium;">Plan TypEs and SitE Suitability on thE HomE Building TimElinE at U-24, discussEd at V-25

   
Plan UsEs

E="font-sizE: mEdium;">Plan UsEs on thE HomE Building TimElinE at S-23, discussEd at S-22.

E="font-sizE: mEdium;">SEE thE articlE Ef="https://homEbuildingtimElinE.com/plan-usEs/" targEt="_blank">E="font-sizE: mEdium;">PLAN USES

   
Plan VErification for EquipmEnt SpacEs, Duct, ElEctrical, Stairs

E="font-sizE: mEdium;">Plan VErification for EquipmEnt SpacEs, Duct, ElEctrical, Stairs on thE HomE Building TimElinE at U-18

   
Plan VErification for Excavation

E="font-sizE: mEdium;">Plan VErification for ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Z-2

   
Plans

E="font-sizE: mEdium;">Plans on thE HomE Building TimElinE at R-22

E="font-sizE: mEdium;">CatEgory - Ef="https://homEbuildingtimElinE.com/topic/plans/" targEt="_blank">E="font-sizE: mEdium;">Plans

   
Plans, Final

E="font-sizE: mEdium;">Plans, Final on thE HomE Building TimElinE at FF-21

   
Planting ProtEction

E="font-sizE: mEdium;">Planting ProtEction on thE HomE Building TimElinE at II-4

   
Plantings and LandscapE DEtails Installation

E="font-sizE: mEdium;">Plantings and LandscapE DEtails Installation on thE HomE Building TimElinE at V-14

   
Plat REstrictions

E="font-sizE: mEdium;">Plat REstrictions on thE HomE Building TimElinE at F-9,  within BEADS KEystonE at H-10, and SITE HAZARDS at I-19, and M-16

   
Plat REstrictions : Main Building

E="font-sizE: mEdium;">Plat REstrictions : Main Building on thE HomE building TimElinE at F-10, G-8

   
Plat REstrictions : OthEr Buildings

E="font-sizE: mEdium;">Plat REstrictions : OthEr Buildings on thE HomE building TimElinE at  F-10, G-9

   
Plat REstrictions vs Building CodE

E="font-sizE: mEdium;">Plat REstrictions vs Building CodE on thE HomE Building timElinE at O-22

   
Plumbing Drains - Existing

E="font-sizE: mEdium;">Plumbing Drains - ExistingE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Q-25

   
Plumbing Manifold, Hot WatEr

E="font-sizE: mEdium;">Plumbing Manifold, Hot WatEr on thE HomE Building TimElinE within thE on-timElinE articlE bEginning at FF-11

   
Plumbing Rough-In

E="font-sizE: mEdium;"> Plumbing Rough-In on thE HomE Building TimElinE at S-5

   
Plumbing Top Out

E="font-sizE: mEdium;">Plumbing Top Out on thE HomE Building TimElinE at EE-15

   
Plumbing Trim-Out

E="font-sizE: mEdium;">Plumbing Trim-Out on thE HomE Building TimElinE at W-6

   
Points of ConnEction

E="font-sizE: mEdium;">Points of ConnEction on thE HomE Building TimElinE at AA-16, Z-17

   
PolE, PowEr

E="font-sizE: mEdium;">PolE, PowErE="font-sizE: mEdium;"> on thE HomE Building TimElinE atE="font-family: "TimEs NEw Roman";">E="font-sizE: mEdium;"> E="font-sizE: mEdium;">I-3

   
PolicE Action for DEbris, Mud, and Trash in Footing TrEnchEs

E="font-sizE: mEdium;">PolicE Action for DEbris, Mud, and Trash in  Footing TrEnchEs on thE HomE Building TimElinE at Q-12, O-13

   
Pond, REtEntion

E="font-wEight: bold; font-sizE: mEdium;">Pond, E="font-sizE: mEdium;">REtEntion E="font-sizE: mEdium;">on thE HomE Building TimElinE at E="font-sizE: mEdium;">QQ-4

   
Ponding in a CrawlspacE

E="font-sizE: mEdium;">Ponding in a CrawlspacE on thE HomE Building TimElinE at T-4

   
Ponding PrEvEntion

E="font-sizE: mEdium;">Ponding PrEvEntion on thE HomE Building TimElinE atE="font-sizE: mEdium;"> T-4

   
Ponding UndEr a Slab

E="font-sizE: mEdium;">Ponding UndEr a Slab on thE HomE Building TimElinE at T-4

   
Pool, OrnamEntal

E="font-sizE: mEdium;">Pool, OrnamEntal on thE HomE Building TimElinE at E="font-sizE: mEdium;">A-2

   
Porch and DEck Construction, Finish

E="font-sizE: mEdium;">Porch and DEck Construction, Finish on thE HomE Building TimElinE at DD-9

 

   
Porch SizE, CovErEd ArEa

E="font-sizE: mEdium;">Porch SizE, CovErEd ArEa on thE HomE Building TimElinE at I-9

   
PossEssions, StoragE of

E="font-sizE: mEdium;">PossEssions, StoragE of : on thE HomE Building TimElinE at KK-8

   
Post and Pillar StrEngth

E="font-sizE: mEdium;">Post and Pillar StrEngth on thE HomE Building TimElinE G-22, diagrammEd at G-23 

   
Post StrEngth

E="font-sizE: mEdium;">Post StrEngth on thE HomE Building TimElinE at T-16

   
Post, FEncE

E="font-sizE: mEdium;">Post, FEncE on thE HomE Building TimElinE at G-25

   
PowEr LinE Location VErification, OvErhEad

E="font-sizE: mEdium;">PowEr LinE Location VErification, OvErhEad  on thE HomE Building TimElinE at O-23

   
PowEr SErvicE Installation

E="font-sizE: mEdium;">PowEr SErvicE Installation on thE HomE Building TimElinE at E="font-sizE: mEdium;">BB-2

   
PowEr VEnts - OrdEr for DElivEry

E="font-sizE: mEdium;">PowEr VEnts - OrdEr for DElivEry on thE HomE Building TimElinE at W-19

   
PrE-Construction MEEting

E="font-sizE: mEdium;">PrE-Construction MEEting on thE HomE Building TimElinE at E="font-family: Tahoma;">II-9

   
PrE-InspEction

E="font-sizE: mEdium;">PrE-InspEction on thE HomE Building TimElinE at JJ-8

   
PrEliminary Plan, Early

E="font-sizE: mEdium;">PrEliminary Plan, Early on thE HomE Building TimElinE at CC-23, discussEd CC-24

   
PrEliminary, AdvancEd

E="font-sizE: mEdium;">PrEliminary, AdvancEd on thE HomE Building TimElinE at DD-23, discussEd at EE-25

   
PrEparation, SitE

E="font-sizE: mEdium;"> PrEparation, SitE on thE HomE Building TimElinE at GG-4

   
PrEparE to Build

E="font-sizE: mEdium;">PrEparE to Build on thE HomE Building TimElinE at JJ-10

   
Primary DEcisions List

E="font-sizE: mEdium;">Primary DEcisions List on thE HomE Building TimElinE at S-23, discussEd at R-24

   
PrivatE Road / StrEEt Status VErification

E="font-sizE: mEdium;">PrivatE Road / StrEEt Status VErification on thE HomE Building TimElinE at M-20

   
ProcEEd, Official LEttEr to

E="font-sizE: mEdium;">ProcEEd, Official LEttEr to : on thE HomE Building TimElinE atE="font-family: "TimEs NEw Roman";"> II-11

   
ProjEct Planning, Final

E="font-sizE: mEdium;">ProjEct Planning, Final on thE HomE Building TimElinE at HH-19

   
PropanE & Gas LinE Rough-In

E="font-sizE: mEdium;"> PropanE & Gas LinE Rough-In on thE HomE Building TimElinE at R-6

   
PropanE / Gas LinE Rough In

E="font-sizE: mEdium;">PropanE / Gas LinE Rough In on thE HomE Building TimElinE at EE-14

   
PropErty Boundary LinE

E="font-sizE: mEdium;"> PropErty Boundary LinE on thE HomE Building TimElinE within thE diagram cEntErEd at D-3, shown as thE thick whitE linE; and within thE diagram cEntErEd at C-8., within thE on-timElinE articlE SITE LINES at F-6; and within thE BEADS KEystonE at H-10,E="font-family: "TimEs NEw Roman";"> I-10, L-12

   
PropErty LinE

 

E="font-sizE: mEdium;"> PropErty LinEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">B-10, C-10, D-10

E="font-sizE: mEdium;">Also within thE diagram cEntErEd at D-3, shown as thE thick whitE linE.

E="font-sizE: mEdium;">Also within thE diagram cEntErEd at C-8.,

 

E="font-sizE: mEdium;">ArticlE SITE LINES at F-6; and within thE BEADS KEystonE at E="font-sizE: mEdium;">H-10, I-10, L-12

E="font-sizE: mEdium;">Also at E="font-sizE: mEdium;">A-15, A-16

   
PropErty LinE VErification

E="font-sizE: mEdium;">PropErtyE="font-wEight: bold;"> LinE VErification on thE HomE Building timElinE at HH-8

   
PropErty LinE, FEncE & StructurE ON

E="font-sizE: mEdium;">PropErty LinE, FEncE & StructurE ON on thE HomE Building TimElinE diagram bEginning at F-24

   
Propping, Shoring, TrEnch

E="font-sizE: mEdium;">Propping, Shoring, TrEnch on thE HomE Building TimElinE at V-4

   
ProtEction for LivE Plants

E="font-sizE: mEdium;">ProtEction for LivE Plants on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-7

   
ProtEction of TrEE BranchEs

E="font-sizE: mEdium;">ProtEction of TrEE BranchEs on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-5

   
ProtEction, Planting

E="font-sizE: mEdium;">ProtEction, Planting on thE HomE Building TimElinE at II-4

   
ProtEctivE CovErs

E="font-sizE: mEdium;">ProtEctivE CovErs on thE HomE Building TimElinE at EE-13

   
Punch List, Final InspEction

E="font-sizE: mEdium;">Punch-List, Final InspEction  on thE HomE Building TimElinE at Z-13 

   


 
Quality

E="font-sizE: mEdium;">Quality insIdE HomEBuildingTimElinE.com

E="font-sizE: mEdium;">CatEgory - E="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/topic/quality/" targEt="_blank">QUALITY

E="font-sizE: mEdium;">Wthin thE articlE Ef="https://homEbuildingtimElinE.com/workmanlikE-mannEr-dEfinEd/" targEt="_blank">WORKMANLIKE MANNER - DEFINED

   
Quality ChEck - Paint

E="font-sizE: mEdium;">Quality ChEck - Paint on thE HomE Building TimElinE at AA-14

   
Quality ChEck, SurfacE FinishEs

E="font-sizE: mEdium;">Quality ChEck, SurfacE FinishEs on thE HomE Building TimElinE at Z-15

   
Quick Start

E="font-sizE: mEdium;">Quick StartE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">O-2

   


 
Radon Gas - DEfinition

E="font-sizE: mEdium;">Radon Gas - DEfinitionE="font-sizE: mEdium;"> on thE HomE Building TimElinE at DD-2, DD-3, E="font-sizE: mEdium;">EE-1, EE-2

   
Radon VEnting Diagram

E="font-sizE: mEdium;">Radon VEnting on thE HomE Building TimElinE at  R-6 T-6

   
Radon VEnting Rough In

E="font-sizE: mEdium;">Radon VEnting Rough In : on thE HomE Building TimElinE at R-6

   
Radon VEnting Top Out

E="font-sizE: mEdium;">Radon VEnting Top Out on thE HomE Building TimElinE at EE-15

   
Radon VEnting, CrawlspacE PipE Installation for

E="font-sizE: mEdium;">Radon VEnting, CrawlspacE PipE Installation for : on thE HomE Building TimElinE at T-18

   
Railings of Stairs, Finish Installation of

E="font-sizE: mEdium;">Railings of Stairs, Finish Installation of : on thE HomE Building TimElinE at E="font-sizE: mEdium;">U-12

   
REad HousE Plans

E="font-sizE: mEdium;">REad HousE Plans on thE HomE Building TimElinE at T-24, discussEd bEginning at T-21

   
REar Building SEt Back LinE

E="font-sizE: mEdium;">REar Building SEt Back LinEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at C-1.

   
REar EasEmEnt

E="font-sizE: mEdium;">REar EasEmEntE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">B-1

   
REbar

E="font-sizE: mEdium;">REbar on thE HomE Building TimElinE at Q-10

   
REcrEational VEhiclE (RV)

E="font-sizE: mEdium;">REcrEational VEhiclE (RV) on thE HomE Building TimElinE at F-11, within thE diagram cEntErEd at SS-14

   
REcyclE Coatings and Paint

E="font-sizE: mEdium;">REcyclE Coatings and Paint on thE HomE Building TimElinE at HH-5

   
REcyclE Paint & Coatings

E="font-sizE: mEdium;">REcyclE Paint & Coatings on thE HomE Building TimElinE at HH-5, JJ-12, X-15

   
REfusal, First Right of

E="font-sizE: mEdium;">REfusal, First Right of : on thE HomE Building TimElinE at N-19

   
REgulations

E="font-sizE: mEdium;">REgulations on thE HomE Building TimElinE at N-19

   
REgulations, Erosion Control

E="font-sizE: mEdium;">REgulations, Erosion Control on thE HomE Building TimElinE at FF-4, I-20

   
REgulations, HiErarchy

E="font-sizE: mEdium;">REgulations, HiErarchy on thE HomE building TimElinE at O-10

   
REgulations, WildlifE Habitat

E="font-sizE: mEdium;">REgulations, WildlifE Habitat  on thE HomE Building TimElinE at FF-4, I-20

   
REgulators, MEEt

E="font-sizE: mEdium;">REgulators, MEEt on thE HomE Building TimElinE at O-20

   
REinforcing WirE MEsh and StEEl Rods

E="font-sizE: mEdium;">REinforcing WirE MEsh and StEEl Rods on thE HomE Building TimElinE at Q-10

   
REmEdiation PErmits

E="font-sizE: mEdium;">REmEdiation PErmits on thE HomE Building TimElinE at JJ-14

   
REpair & REplacEmEnt

E="font-sizE: mEdium;">REpair & REplacEmEnt on thE HomE Building TimElinE at DD-19

   
REstrictions, Plat

E="font-sizE: mEdium;">REstrictions, Plat on thE HomE Building TimElinE at F-9,  within BEADS KEystonE at H-10, and SITE HAZARDS at I-19, and M-16

   
REstrictivE CovEnants

E="font-sizE: mEdium;">REstrictivE CovEnants on thE HomE Building TimElinE at M-19

   
REstroom, TEmporary PortablE

E="font-sizE: mEdium;">REstroom, TEmporary PortablE on thE HomE Building TimElinE at HH-8

   
REtEntion Pond

E="font-sizE: mEdium;">REtEntion PondE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">QQ-4

   
Right-of-Way
 
 
E="font-sizE: mEdium;">Right of WayE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E-4, E-5, also within thE on-timElinE articlE, SITE LINES at F-6. Also diagrammEd at E="font-sizE: mEdium;">B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16

E="font-sizE: mEdium;">A Right-of-Way (ROW) for a strEEt, road, or highway is a spEcial parcEl of land. A road ROW sits bEsidE and bEtwEEn othEr parcEls of propErty. SomE ExamplEs arE strEEts, intErstatE highways, railroad tracks, gas linEs, and powEr linEs.

E="font-sizE: mEdium;">A Right-of-Way for utilitiEs is a spEcial typE of EasEmEnt, and may pass through a privatEly ownEd parcEl of land. In such a casE, thE landownEr still possEssEs thE land, but is not allowEd to EvEr build within thE ROW. ExamplEs arE gas pipElinEs, powErlinEs, and othEr utilitiEs likE cablE tElEvision and tElEphonE; and drivEways allowing onE ownEr to cross anothEr ownEr's land.

   
Riparian Margin

E="font-sizE: mEdium;">Riparian MarginE="font-sizE: mEdium;"> on thE HomE Building TimElinE at I-19 insidE thE topic E="font-sizE: mEdium;">Hazards of SitE SElEction

   
Roof

E="font-sizE: mEdium;">RoofE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">AA-18, AA-19, EE-12, I-21, K-21, K-23, S-17, W-22, Z-16.

   
Roof - NEVER NEw OvEr Old

E="font-sizE: mEdium;">Roof - NEVER NEw OvEr Old on thE HomE Building TimElinE at CC-19

   
Roof DrainagE IssuEs, AltErEd

E="font-sizE: mEdium;">Roof DrainagE IssuEs, AltErEd on thE HomE Building TimElinE at V-19, U-20, V-20

   
Roof Dry In ComplEtE

E="font-sizE: mEdium;">Roof Dry In ComplEtE on thE HomE Building TimElinE at AA-18

   
Roof Framing - BEgin Installation

E="font-sizE: mEdium;">Roof Framing - BEgin Installation on thE HomE Building TimElinE at V-20

   
Roof MatErials

E="font-sizE: mEdium;">Roof MatErials on thE HomE Building TimElinE at Z-16

   
Roof MatErials: OrdEr for DElivEry

E="font-sizE: mEdium;">Roof MatErials : OrdEr for DElivEry on thE HomE building TimElinE at EE-13

   
Roof PlanE IntErsEction and RainwatEr Run Off

E="font-sizE: mEdium;">Roof PlanE IntErsEction and RainwatEr Run Off on thE HomE Building TimElinE at V-20

   
Roof SlopE / Pitch

E="font-sizE: mEdium;">Roof SlopE / Pitch diagrammEd on thE HomE Building TimElinE bEginning atE="font-family: Tahoma;"> E="font-family: Tahoma;">I-21

   
Roof StrEngth

E="font-sizE: mEdium;">Roof StrEngth on thE HomE Building TimElinE at Z-16

   
Roof SurfacE MatErial Installation

E="font-sizE: mEdium;">Roof SurfacE MatErial Installation on thE HomE Building TimElinE at EE-13

   
Roof SurfacE MatErial VErification

E="font-sizE: mEdium;">Roof SurfacE MatErial VErification on thE HomE Building TimElinE at AA-19

   
Roof SurfacE MatErials : OrdEr for DElivEry

E="font-sizE: mEdium;">Roof SurfacE MatErials : OrdEr for DElivEry on thE HomE building TimElinE at EE-13

   
Roof TypEs

E="font-sizE: mEdium;">Roof TypEs on thE HomE Building TimElinE diagrammEd bEginning at K-23

   
Roof, Bull NosE

E="font-sizE: mEdium;">Roof, Bull NosE on thE HomE Building TimElinE at M-26

   
Roof, Dutch GablE

E="font-sizE: mEdium;">Roof, Dutch GablE on thE HomE Building TimElinE at M-25

   
Roof, GablE

E="font-sizE: mEdium;">Roof, GablE on thE HomE Building TimElinE at K-22, K-24, K-25, K26

   
Roof, GablE on GablE

E="font-sizE: mEdium;">Roof, GablE on GablE on thE HomE Building TimElinE at K-26

   
Roof, Hip

E="font-sizE: mEdium;">Roof, Hip on thE HomE Building TimElinE at L-22, M-23, M-24

   
Roof, ShEd

E="font-sizE: mEdium;">Roof, ShEd on thE HomE Building TimElinE at K-22, K-25

   
Roofing MatErials - DElivErEd

E="font-sizE: mEdium;">Roofing MatErials - DElivErEd on thE HomE Building TimElinE at AA-19

   
Room SizE vs Plan DimEnsion

E="font-sizE: mEdium;">Room SizE vs Plan DimEnsion on thE HomE Building TimElinE at T-21, DD-26

   
Root LinE

E="font-sizE: mEdium;">Root LinE on thE HomE Building TimElinE within thE diagram cEntErEd at FF-6

   
ROW or Right of Way

 

E="font-sizE: mEdium;">

E="font-family: Arial;">ROW or Right of Way E="font-sizE: mEdium;">on thE HomE Building TimElinE at E-4, E-5,E="font-family: Arial;">E="font-sizE: mEdium;"> also within thE articlE, SITE LINES at F-6E="font-family: Arial;">E="font-sizE: mEdium;">. Also diagrammEd at B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16

E="font-family: Arial;">

E="font-sizE: mEdium;">E="font-family: Arial;">A Right-of-Way (ROW) for a strEEt, road, or highway is a spEcial parcEl of land. A road ROW sits bEsidE and bEtwEEn othEr parcEls of propErty. SomE ExamplEs arE strEEts, intErstatE highways, railroad tracks, gas linEs, and powEr linEs.

E="font-sizE: mEdium;">E="font-family: Arial;"> A Right-of-Way for utilitiEs is a spEcial typE of EasEmEnt, and may pass through a privatEly ownEd parcEl of land. In such a casE thE landownEr still possEssEs thE land, but is not allowEd to EvEr build within thE ROW. ExamplEs arE gas pipElinEs, powErlinEs, and othEr utilitiEs likE cablE tElEvision and tElEphonE; and drivEways allowing onE ownEr to cross anothEr ownEr's land.

   
RulE Variations

E="font-sizE: mEdium;">RulE Variations on thE HomE Building TimElinE at N-20

   
RulEs

E="font-sizE: mEdium;">RulEs on thE HomE Building TimElinE at N-19

   
Runoff

E="font-sizE: mEdium;">RunoffE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">JJ-2

   
Rural ProjEct CodE CompliancE

E="font-sizE: mEdium;">Rural ProjEct CodE CompliancE on thE HomE Building TimElinE at O-21

   
RV (REcrEational VEhiclE)

E="font-sizE: mEdium;"> RV (REcrEational VEhiclE) on thE HomE Building TimElinE at F-11, within thE diagram cEntErEd at SS-14

   


 
SafE ArEas

E="font-sizE: mEdium;">SafE ArEas on thE HomE Building TimElinE at AA-23

   
SafE At HomE : LifE, PossEssions, & StructurE

E="font-sizE: mEdium;">SafE At HomE : LifE, PossEssions, & StructurE on thE HomE Building TimElinE at Z-11, AA-ll

   
SafEs & Vaults

E="font-sizE: mEdium;">SafEs & Vaults on thE HomE Building TimElinE at AA-22

   
SafEty At HomE

E="font-sizE: mEdium;">SafEty at HomE : Z-11

E="font-sizE: mEdium;">CatEgory - Ef="https://homEbuildingtimElinE.com/topic/safEty-at-homE/" targEt="_blank">E="font-sizE: mEdium;">SafE At HomE

   
Sand PlacEmEnt, Landscaping

E="font-sizE: mEdium;">Sand PlacEmEnt, Landscaping on thE HomE Building TimElinE at BB-7

   
Sanitary SEwEr EasEmEnt

E="font-sizE: mEdium;">Sanitary SEwEr EasEmEnt on thE HomE Building TimElinE at A-8

   
ScrEw Slots, FacE PlatE

E="font-sizE: mEdium;">ScrEw Slots, FacE PlatE on thE HomE Building TimElinE at Z-13, AA-13, AA-14

   
SEcurity at HomE

E="font-sizE: mEdium;">SEcurity at HomE on thE HomE Building TimElinE at AA-11

   
SElEct thE Building SitE

E="font-sizE: mEdium;">SElEct thE Building SitE on thE HomE Building TimElinE at Q-22

   
SEptic Tank and LEach FiEld Location VErification

E="font-sizE: mEdium;">SEptic Tank and LEach FiEld Location VErification on thE HomE Building TimElinE at HH-22

   
SEtback LinE

E="font-sizE: mEdium;">SETBACK LINE on thE HomE Building TimElinE in thE diagram cEntErEd at A-18, D-3, B-7, B-9, C-7, C-9, D-7. 

 

E="font-sizE: mEdium;">A SETBACK linE is mEasurEd from a propErty linE, whEthEr front, sidE, or rEar.

E="font-sizE: mEdium;">HirE a profEssional survEyor to hElp find thE propErty linE, first, thEn thE sEtback linEs.

   
SEtback LinE, Front Building

E="font-sizE: mEdium;">SEtback LinEFront Building on thE HomE Building TimElinE at B-9, C-9

   
SEtback LinE, SidE Yard

E="font-sizE: mEdium;">SEtback LinEE="font-sizE: mEdium;">SidE Yard on thE HomE Building TimElinE at G-3

   
SEtback SidE Yard - LEFT (or any)

E="font-sizE: mEdium;">SEtback SidE Yard - LEFT (or any sidE) on thE HomE Building TimElinE at D-5

   
SEwagE Disposal, OnsitE

E="font-sizE: mEdium;">SEwagE Disposal, OnsitE on thE HomE Building TimElinE at JJ-12

   
ShadE & Shadow REstrictions

E="font-sizE: mEdium;">ShadE & Shadow REstrictions on thE HomE Building TimElinE at CC-26

   
Shadow-LinEs

E="font-sizE: mEdium;">Shadow LinEs on thE HomE Building TimElinE at W-24

E="font-sizE: mEdium;">Within HomEBuildingTimElinE.com, sEarch for thE topic Shadows.

E="font-sizE: mEdium;">SEE thE articlE Ef="http://nEw.homEbuildingtimElinE.com/shuttEr-shadows-changE-farmhousE-to-main-strEEt/">E="font-sizE: mEdium;">ShuttEr Shadows ChangE 'FarmhousE' to 'Main StrEEt'

   
ShapEs of Land ParcEls

E="font-sizE: mEdium;">ShapEs of Land ParcElsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at grid E="font-sizE: mEdium;">K-1

   
ShEd Roof

E="font-sizE: mEdium;">ShEd Roof on thE HomE Building TimElinE at K-22, K-25

   
ShEltEr, ThE

E="font-sizE: mEdium;">ShEltEr, ThE on thE HomE Building TimElinE at S-17

   
Shopping

E="font-sizE: mEdium;">Shopping on thE HomE Building TimElinE at EE-23, GG-20

   
ShorE Erosion

E="font-sizE: mEdium;">ShorE Erosion on thE HomE Building TimElinE within thE diagram bEginning at NN-5 

   
Shoring

E="font-sizE: mEdium;">Shoring on thE HomE Building TimElinE at SS-5V-4

   
Shoring BracEs

E="font-sizE: mEdium;">Shoring BracEsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">R-3

   
Shoring for Blow Out PrEvEntion

E="font-sizE: mEdium;">Shoring for Blow Out PrEvEntion on thE HomE Building TimElinE at Q-12

   
Shoring, CountEr

E="font-sizE: mEdium;">Shoring, CountEr on thE HomE Building TimElinE at V-4

E="font-sizE: mEdium;">This is not about a kitchEn or bath countEr. This is about balancing forcE to kEEp a wall from collapsing, during rEnovation,or dEmolition.

   
ShowEr Door MEasurEmEnts

E="font-sizE: mEdium;">ShowEr Door MEasurEmEnts on thE HomE Building TimElinE at Z-6

   
SidE Yard SEtback LinE

E="font-sizE: mEdium;">SidE Yard SEtback LinEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">F-2

   
SidEwalk

E="font-sizE: mEdium;">SidEwalk on thE HomE Building TimElinE at G-5

   
SidEwalk, Public

E="font-sizE: mEdium;">SidEwalk, Public on thE HomE Building TimElinE at E-5, A-15, D-15, A-16, D-16

   
Sill PlatEs on Top of Masonry Walls, ChEck - SquarE and LEvEl

E="font-sizE: mEdium;">Sill PlatEs on Top of Masonry Walls, ChEck - SquarE and LEvEon thE HomE Building TimElinE at Q-14

   
Sill PlatEs on Top of Masonry Walls, Install

E="font-sizE: mEdium;">Sill PlatEs on Top of Masonry Walls, Install on thE HomE Building TimElinE at Q-14

   
Silt FEncE

E="font-sizE: mEdium;">Silt FEncEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">KK-2, S-5

   
Silt FEncE InspEction and REpair

E="font-sizE: mEdium;">Silt FEncE InspEction and REpair on thE HomE Building TimElinE at R-15, S-5, U-3, V-14, BB-7, CC-17

   
Silt FEncE Installation

 

E="font-sizE: mEdium;">

Silt FEncE Installation on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-8, Y-2

 

 

E="font-sizE: mEdium;">

E="color: rgb(255, 0, 0);">No physical matErail is allowEd to cross ovEr any propErty linE, whEthEr sawdust, gravEl, cEmEnt & mortar particlEs, lunch trash, human & animal wastE, spillEd paint, nails & scrEws, drywall bits & flakEs, EvEn muddy watEr. 

 

E="font-sizE: mEdium;">E="font-family: "TimEs NEw Roman";">II-8 : Install primary silt fEncE for initial control of Erosion and rain-watEr run-off from thE propErty.

E="font-sizE: mEdium;">Y-2 : Install any nEEdEd additional Silt FEncing to assurE full control of rain-watEr run-off. 

   
SitE ClEaring and Conditioning

E="font-sizE: mEdium;">SitE ClEaring and Conditioning on thE HomE Building TimElinE at GG-4

   
SitE PrEparation

E="font-sizE: mEdium;">SitE PrEparation on thE HomE Building TimElinE at GG-4

   
SitE Suitability and Plan TypEs

E="font-sizE: mEdium;">SitE Suitability and Plan TypEon thE HomE Building TimElinE at U-24, discussEd at V-25

   
SizE

E="font-sizE: mEdium;">SizE on thE HomE Building TimElinE at R-25

   
Skill, Contractor's

E="font-sizE: mEdium;">Skill, Contractor's on thE HomE Building TimElinE at E="font-family: Tahoma;">II-20

   
Slab, PlacE ConcrEtE for

E="font-sizE: mEdium;">Slab, PlacE ConcrEtE for : on thE HomE Building TimElinE at Q-13

   
Slow WatEr

E="font-sizE: mEdium;">Slow WatErE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">QQ-3, and within thE diagram bEginning at NN-5

   
SmokE, Toxic

E="font-sizE: mEdium;">SmokE, ToxicE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-3

   
Snow

E="font-sizE: mEdium;">Snow on thE HomE Building TimElinE at JJ-12

   
Snow and IcE WEight

E="font-sizE: mEdium;">Snow and IcE WEight on thE HomE Building TimElinE at Z-18

   
Snow MElt

E="font-sizE: mEdium;">Snow MElt on thE HomE Building TimElinE at CC-25

   
Soil Analysis

E="font-sizE: mEdium;">Soil Analysis  on thE HomE Building TimElinE at S-21, S-23

   
Soil Poisoning for TErmitEs

E="font-sizE: mEdium;">Soil Poisoning for TErmitEs on thE HomE Building TimElinE at Q-12

   
Soil TEst

E="font-sizE: mEdium;">Soil TEst on thE HomE Building TimElinE at M-17, dEscribEd at K-18, S-23

   
Solar HarvEsting

E="font-sizE: mEdium;">Solar HarvEsting on thE HomE Building TimElinE at CC-26

   
Solar Rights

E="font-sizE: mEdium;">Solar RightsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at I-17;  and within thE topic SOLAR ENERGY INVESTMENT PROTECTION LAWS

   
SpEcifications (DEscription of MatErials)

E="font-sizE: mEdium;">SpEcifications (DEscription of MatErials) on thE HomE Building TimElinE at U-21, FF-23

   
SpEcifications - MatErial SElEction

E="font-sizE: mEdium;">SpEcifications - MatErial SElEction on thE HomE Building TimElinE at FF-25

   
SpEcifications, Early (PrEliminary)

E="font-sizE: mEdium;">SpEcifications, Early (PrEliminary) on thE HomE Building TimElinE at EE-22, dEscribEd at FF-23

   
Spray Foam Insulation

E="font-sizE: mEdium;">Spray Foam Insulation on thE HomE Building TimElinE at AA-21

   
SquarE FootagE, Total ArEa

E="font-sizE: mEdium;">SquarE FootagE, Total ArEa on thE HomE Building TimElinE at H-9

   
Stability from thE Plan

E="font-sizE: mEdium;">Stability from thE Plan on thE HomE Building TimElinE at Y-22, U-24

   
Stability of EvErything

E="font-sizE: mEdium;">Stability of EvErything on thE HomE Building TimElinE at grid H-16.

E="font-sizE: mEdium;">Part ofE="font-sizE: mEdium;"> ThE BEADS KEYSTONE.

   
Stain and Paint, Finish ExtErior

E="font-sizE: mEdium;">Stain and Paint, Finish ExtErior on thE HomE Building TimElinE at DD-9

   
Stair - EdgE StringEr - Structural

E="font-sizE: mEdium;">Stair - EdgE StringEr - Structural on thE HomE Building TimElinE at NN-24

   
Stair - HEadroom

E="font-sizE: mEdium;">Stair - HEadroom on thE HomE Building TimElinE at SS-24, TT-24, SS-25, SS-26

   
Stair - StoragE BEnEath

E="font-sizE: mEdium;">Stair - StoragE BEnEath on thE HomE Building TimElinE at SS-24, TT-24, TT-26

   
Stair - Straight Run

E="font-sizE: mEdium;">Stair - Straight Run on thE HomE Building TimElinE at PP-24

   
Stair - Wall StringEr, DEcorativE

E="font-sizE: mEdium;">Stair - Wall StringEr, DEcorativE on thE HomE Building TimElinE at MM-26

   
Stair - Wall StringEr, Structural

E="font-sizE: mEdium;">Stair - Wall StringEr, Structural on thE HomE Building TimElinE at NN-24

   
Stair : Mid-Landing

E="font-sizE: mEdium;">Stair : Mid-Landing on thE HomE Building TimElinE at QQ-24, RR-24

   
Stair : Mid-StringEr

E="font-sizE: mEdium;">Stair : Mid-StringEr on thE HomE Building TimElinE at NN-24

   
Stair Building CodE

E="font-sizE: mEdium;">Stair Building CodE on thE HomE Building TimElinE diagram cEntErEd on PP-25 

   
Stair Kick PlatE at thE Bottom

E="font-sizE: mEdium;">Stair Kick PlatE at thE Bottom on thE HomE Building TimElinE at MM-25, NN-25

   
Stair LEdgEr at Top

E="font-sizE: mEdium;">Stair LEdgEr at Top on thE HomE Building TimElinE at MM-24

   
Stair RisE, Run, and TrEads

E="font-sizE: mEdium;">Stair RisE, Run, and TrEads on thE HomE Building TimElinE at QQ-25

   
Stair RisEr

E="font-sizE: mEdium;">Stair RisEr on thE HomE Building TimElinE at NN-26

   
Stair RisEr SpacE

E="font-sizE: mEdium;">Stair RisEr SpacE on thE HomE Building TimElinE at NN-24

   
Stair SafEty

E="font-sizE: mEdium;">Stair SafEty on thE HomE Building TimElinE at VV-24

   
Stair StringEr

E="font-sizE: mEdium;">Stair StringEr on thE HomE Building TimElinE at NN-24, MM-26

E="font-sizE: mEdium;">A Structural StringEr supports thE wEight of thE movEmEnt on thE stairs of pEoplE and possEssions.

E="font-sizE: mEdium;">A DEcorativE StringEr looks prEtty but is non-load-bEaring.

   
Stair TrEad

E="font-sizE: mEdium;">Stair TrEad on thE HomE Building TimElinE at NN-24, NN-26 OO-26, QQ-25

   
Stair WindEr

E="font-sizE: mEdium;">Stair WindEr on thE HomE Building TimElinE at VV-25

   
Stair, Bathroom UndEr

E="font-sizE: mEdium;">Stair, Bathroom UndEr on thE HomE Building TimElinE at TT-25

   
Stairs, Finish Installation of

E="font-sizE: mEdium;">Stairs, Finish Installation of : on thE HomE Building TimElinE at U-12

   
Stairs, IntErior - Rough In

E="font-sizE: mEdium;">Stairs, IntErior - Rough In : on thE HomE Building TimElinE at Z-19

   
Stairway Anatomy

E="font-sizE: mEdium;">Stairway Anatomy on thE HomE Building TimElinE at OO-25

   
Standards

E="font-sizE: mEdium;">Standards insIdE HomEBuildingTimElinE.com within thE articlE Ef="https://homEbuildingtimElinE.com/workmanlikE-mannEr-dEfinEd/" targEt="_blank">WORKMANLIKE MANNER - DEFINED

   
StatE Building CodE

E="font-sizE: mEdium;">StatE Building CodE on thE HomE Building TimElinE at O-22

   
StEEl Rods and WirE MEsh for REinforcing

E="font-sizE: mEdium;">StEEl Rods and WirE MEsh for REinforcing on thE HomE Building TimElinE at Q-10

   
StickEr Shock

E="font-sizE: mEdium;">StickEr Shock on thE HomE Building TimElinE at BB-25

   
Stilts

E="font-sizE: mEdium;">Stilts on thE HomE Building TimElinE at T-16

   
StonE and Mortar - OrdEr for DElivEry

E="font-sizE: mEdium;">StonE and Mortar - OrdEr for DElivEry on thE HomE Building TimElinE at EE-13

   
StonE Work, Brick Work, and Masonry Work

E="font-sizE: mEdium;">StonE Work, Brick Work, and Masonry Work on thE HomE Building TimElinE at EE-10

   
Stop and Think

 

E="font-sizE: mEdium;">

Stop, and Think on thE HomE Building TimElinE EVERYWHERE.

E="font-sizE: mEdium;">"Thinking" is thE sEcond lEast-usEd tactic in thE planning and construction procEss. ThE first lEast-EmployEd tactic is <Em>stoppingEm> to do it.

E="font-sizE: mEdium;">Building anything dwElling-rElatEd is a hurriEd, high-prEssurE, highEr-ExpEctations, highEst-Emotional-statE ExpEriEncE. 'REason' is rEplacEd by anxiEty; and bad dEcision-making follows, naturally. ThE curE is to givE yoursElf a momEnt to considEr options. So, stop and think.

E="tExt-align: cEntEr;"> 

E="font-sizE: mEdium;">

E="tExt-align: cEntEr;">E="color: rgb(153, 51, 102);">LEarn thEsE phrasEs and usE thEm oftEn:

E="margin-lEft: 200px;"> 

E="font-sizE: mEdium;">

E="tExt-align: cEntEr; margin-lEft: 40px;">E="color: rgb(153, 51, 102);">"This doEsn't sEEm right. I nEEd somE timE to think about it."

E="margin-lEft: 200px;"> 

E="font-sizE: mEdium;">

E="margin-lEft: 200px;">E="color: rgb(153, 51, 102);">"LEt's look at that morE closEly."

E="margin-lEft: 200px;"> 

E="font-sizE: mEdium;">

E="margin-lEft: 200px;">E="color: rgb(153, 51, 102);">"How can wE fix this problEm?"

E="tExt-align: cEntEr;"> 

E="font-sizE: mEdium;">

E="tExt-align: cEntEr;">E="color: rgb(0, 0, 255);">Gain thE high ground in any situation by sEizing thE momEnt to stop and think.

E="font-sizE: mEdium;">ConcErning EvEry aspEct of this projEct :

E="margin-lEft: 80px;">E="font-sizE: mEdium;">If you'rE unsurE, stop and bEcomE cErtain.

E="margin-lEft: 80px;">E="font-sizE: mEdium;">If a thing is unknown to you, stop and lEarn about it.

E="margin-lEft: 80px;">E="font-sizE: mEdium;">WhEn a mistakE is madE, by you or othErs, stop and find of a solution.

E="font-sizE: mEdium;">ThE kEy word is STOP. Don't worry if pEoplE around you arE impatiEnt. Stand firm, as you activEly sEEk positivE solutions. -AB

E="font-sizE: mEdium;"> 

   
Stop, Study, and Think

E="font-sizE: mEdium;">Stop, Study, and Think on thE HomE Building TimElinE at CC-23, discussEd at DD-24

   
StoragE - GaragE - Around thE EdgE

E="font-sizE: mEdium;">StoragE - GaragE - Around thE EdgE on thE HomE Building TimElinE at OO-11

   
StoragE Building

E="font-sizE: mEdium;">StoragE Building on thE HomE Building TimElinE at F-11

   
StoragE of PossEssions

E="font-sizE: mEdium;">StoragE of PossEssions on thE HomE Building TimElinE at KK-8

   
StoragE UndEr Stairs

E="font-sizE: mEdium;">StoragE UndEr Stairs on thE HomE Building TimElinE at TT-26

   
StoragE Unit REntal

E="font-sizE: mEdium;">StoragE Unit REntal on thE HomE Building TimElinE at JJ-7

   
StoragE, GaragE

E="font-sizE: mEdium;">StoragE, GaragE on thE HomE Building TimElinE at SS-9, within thE VEhiclE Diagrams cEntErEd on RR-13, SS-15, RR-20

   
StoragE, KitchEn

E="font-sizE: mEdium;">StoragE, KitchEn on thE HomE Building TimElinE at X-8, and within thE articlE cEntErEd on Z-9

   
StoragE, KitchEn UtEnsil

E="font-sizE: mEdium;">StoragE, KitchEn UtEnsil on thE HomE Building TimElinE at X-8, X-9

   
Storm DrainagE Excavation

E="font-sizE: mEdium;">Storm DrainagE ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Y-2

   
Storm ShEltEr Excavation

E="font-sizE: mEdium;">Storm ShEltEr ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">W-2

   
Storm ShEltEr, ConcrEtE Block - BEgin Construction

E="font-sizE: mEdium;">Storm ShEltEr, ConcrEtE Block - BEgin Construction on thE HomE Building TimElinE at Q-8

   
Storm ShEltEr, PlacEd ConcrEtE for Walls

E="font-sizE: mEdium;">Storm ShEltEr, PlacEd ConcrEtE for Walls on thE HomE Building TimElinE at Q-13

   
Storm ShEltEr, Wall Forms for NEar-FuturE PlacEd ConcrEtE for

E="font-sizE: mEdium;">Storm ShEltEr, Wall Forms for NEar-FuturE PlacEd ConcrEtE for on thE HomE building TimElinE at Q-9

   
Structural DEcay, EvidEncE of

E="font-sizE: mEdium;">Structural DEcay, EvidEncE of : on thE HomE Building TimElinE at Q-14

   
Structural FailurE - Foundation

E="font-sizE: mEdium;">Structural FailurE - Foundation on thE HomE Building TimElinE at S-8

   
StructurEs on thE PropErty LinE

E="font-sizE: mEdium;">StructurEs on thE PropErty LinE on thE HomE Building TimElinE diagram bEginning at F-24

   
StylE, ExtErior

E="font-sizE: mEdium;">StylEExtErior on thE HomE Building TimElinE in thE diagram bEginning at W-21

   
Sub-Party

E="font-sizE: mEdium;">Sub-Party on thE HomE Building TimElinE at DD-9, and dEscribEd at MM-10

   
Sump Pit Excavation

E="font-sizE: mEdium;">Sump Pit ExcavationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">W-2, W-3

   
SupEr GEnius

E="font-sizE: mEdium;">SupEr GEniusE="font-sizE: mEdium;">

E="font-sizE: mEdium;">Andy NoEl foundEr of Ef="http://prosaurasystEms.com/" targEt="_blank">ProSauraSystEms.com is onE. HE crEatEd thE mEchanism for this IndEx.

E="font-sizE: mEdium;">SandEr dE Wijs (dE-VEihs for AmEricans) ownEr of ThE NEthErlands-basEE="3">Ef="https://www.dEgrinthorst.nl/" targEt="_blank">DEgrinthorst.nlE="font-sizE: mEdium;">Ef="https://www.dEgrinthorst.nl/" targEt="_blank"> is chiEf of programming, and also a supEr gEnius. HE writEs all of thE codE to makE HomEBuildingTimElinE.com function.

   
SurfacE FinishEs - Quality ChEck

E="font-sizE: mEdium;">SurfacE FinishEs - Quality ChEck on thE HomE Building TimElinE at AA-15

   
SurvEy to placE HousE on SitE

E="font-sizE: mEdium;">SurvEy to placE HousE on SitEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">BB-2

   
Survival of PossEssions

E="font-sizE: mEdium;">Survival of PossEssions on thE HomE Building TimElinE at Z-23

   
Survival of thE Occupants

E="font-sizE: mEdium;">Survival of thE Occupants on thE HomE Building TimElinE at Z-22, AA-22

   
Survival of thE StructurE

E="font-sizE: mEdium;">Survival of thE StructurE on thE HomE Building TimElinE at Y-23, Z-23

   
Swimming Pool

E="font-sizE: mEdium;">Swimming Pool on thE HomE Building TimElinE at A-2, F-11, E="font-family: "TimEs NEw Roman";">II-5

   


 
Tailings Staging ArEa

E="font-sizE: mEdium;">Tailings Staging ArEa on thE HomE Building TimElinE at HH-7

   
Tax IncEntivEs, GrEEn Building

E="font-sizE: mEdium;">Tax IncEntivEs, GrEEn Building  on thE HomE Building TimElinE atE="font-family: Tahoma;"> II-16

   
TElEphonE SErvicE Installation

E="font-sizE: mEdium;">TElEphonE SErvicE Installation on thE HomE Building TimElinE at E="font-sizE: mEdium;">BB-2

   
TEmporary ElEctric PowEr Installation

E="font-sizE: mEdium;">TEmporary ElEctric PowEr Installation on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-8

   
TEnnis Court

E="font-sizE: mEdium;">TEnnis Court on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-5

   
TErmitE BarriEr

E="font-sizE: mEdium;">TErmitE BarriEr on thE HomE building TimElinE at FF-9,  and within thE ArticlE TERMITES bEginning at N-11, N-12, Q-12

   
TErmitE BarriEr Installation

E="font-sizE: mEdium;">TErmitE BarriEr Installation on thE HomE Building TimElinE at FF-9 N-12, O-12, Q-12

   
TErmitE ShiEld on Masonry Wall Tops

E="font-sizE: mEdium;">TErmitE ShiEld on Masonry Wall Tops on thE HomE Building TimElinE at Q-13

   
TErmitEs

E="font-sizE: mEdium;">TErmitEs on thE HomE building TimElinE at FF-9,  and within thE on-timElinE articlE TERMITES bEginning at N-11

   
TErmiticidE PlacEmEnt

E="font-sizE: mEdium;">TErmiticidE PlacEmEnt on thE HomE Building TimElinE at Q-12

   
TErracE

E="font-sizE: mEdium;">TErracEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">A-1, A-2

   
TErracE ConcrEtE PlacEmEnt

E="font-sizE: mEdium;">TErracE ConcrEtE PlacEmEnt on thE HomE Building TimElinE at AA-6

   
TEst WEll WatEr for SafEty

E="font-sizE: mEdium;">TEst WEll WatEr for SafEty on thE homE Building TimElinE at DD-9

   
TExting

E="font-sizE: mEdium;">TExting on thE HomE Building TimElinE at MM-15

E="font-sizE: mEdium;">InsidE HomEBuildingTimElinE.com within thE articlEs:

E="font-sizE: mEdium;">Ef="https://homEbuildingtimElinE.com/distractEd-driving-hiddEn-building-cost-no-rEcovEry/" targEt="_blank">DistractEd Driving - HiddEn Building Cost - No REcovEry

Ef="https://homEbuildingtimElinE.com/all-communication-must-bE-dirEct/" targEt="_blank">E="font-sizE: mEdium;">All Communications Must BE DirEct

   
Touch-up IntErior Trim

E="font-sizE: mEdium;">Touch-up IntErior Trim on thE HomE Building TimElinE at U-13

   
TownhomE Wall MaintEnancE

E="font-sizE: mEdium;">TownhomE Wall MaintEnancE insidE HomEBuildingTimElinE.com

E="font-sizE: mEdium;">Within thE articlE Ef="https://homEbuildingtimElinE.com/townhomE-rEnovation-includEs-nEighbors-ExtErior-wall/" targEt="_blank">TownhomE REnovation IncludEs NEighboring ExtErior Common Wall

   
Toxic MatErials Transportation PErmit

E="font-sizE: mEdium;">Toxic MatErials Transportation PErmit on thE HomE Building TimElinE at KK-13

   
Toxic MatErials, Handling PErmits for

E="font-sizE: mEdium;">Toxic MatErials, Handling PErmits for on thE HomE Building TimElinE at KK-11

   
Toxic SmokE

E="font-sizE: mEdium;">Toxic SmokEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-3

   
Transition Strip

E="font-sizE: mEdium;">Transition Strip on thE HomE Building TimElinE at DCC-12, D12

   
TrEE - ClosEst Proximity for Construction

E="font-sizE: mEdium;">TrEE - ClosEst Proximity for Construction on thE HomE Building TimElinE within thE diagram cEntErEd on KK-6 

   
TrEE Branch ProtEction

E="font-sizE: mEdium;">TrEE Branch ProtEction on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-5

   
TrEEs, Mark

E="font-sizE: mEdium;">TrEEs, Mark on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">II-8, JJ-8

   
TrEstlE, GatE

E="font-sizE: mEdium;">TrEstlE, GatE on thE HomE Building TimElinE at E-25

   
Trim Installation, IntErior

E="font-sizE: mEdium;">Trim Installation, IntErior on thE HomE Building TimElinE at U-13

   
Trim MatErial, OrdEr

E="font-sizE: mEdium;">Trim MatErial, OrdEr on thE HomE Building TimElinE at CC-7

   
Trim MEasurEmEnt VErification

E="font-sizE: mEdium;">Trim MEasurEmEnt VErification on thE HomE Building TimElinE at CC-7

   
Trim, ExtErior Installation

E="font-sizE: mEdium;">Trim, ExtErior Installation on thE HomE building TimElinE at EE-12

   
Trim, Touch-up IntErior

E="font-sizE: mEdium;">Trim, Touch-up IntErior on thE HomE Building TimElinE at U-13

   
Trimming and ClEaring Along A PropErty LinE

E="font-sizE: mEdium;">Trimming and ClEaring Along A PropErty LinEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at A-3, E="font-sizE: mEdium;">HH-1, F-2

   
Trust

E="font-sizE: mEdium;">Trust on thE HomE Building TimElinE at M-7

   
Trust ONLY NEw MEasurEmEnts

E="font-sizE: mEdium;">Trust ONLY NEw MEasurEmEnts on thE HomE Building TimElinE at O-23

   


 
Uncoupling MEmbranE

Uncoupling MEmbranE on thE HomE Building TimElinE at V-11

   
UndErcutting by Erosion

E="font-sizE: mEdium;">UndErcutting by Erosion on thE HomE Building TimElinE at UU-5

   
UnExpEctEd AdjustmEnts

E="font-sizE: mEdium;">UnExpEctEd AdjustmEnts on thE HomE Building TimElinE at E="font-family: Tahoma;">Q-10, U-10, CC-18, EE-11, II-16, II-17, Y-15

   
USDA MortgagE & Plan REquirEmEnts

E="font-family: Arial;">E="font-sizE: mEdium;">USDA MortgagE & Plan REquirEmEnts : E="font-family: Arial;">E="font-sizE: mEdium;">ThE information and documEntation rEquirEd to qualify for, and procEss a USDA homE loan.

E="font-family: Arial;">E="font-sizE: mEdium;">ThE list is ExtEnsivE and includEs dEtailEd financial information, land survEy and titlE-of-ownErship documEntation, and assurancE documEntation proving compliancE with all applicablE building codEs, EnErgy codEs, and dEsign standards. 

   
UsEfulnEss of thE Plan, ThE

E="font-sizE: mEdium;">UsEfulnEss of thE Plan on thE HomE Building TimElinE at X-24, discussEd at X-25

   
UsEfulnEss, KitchEn

E="font-sizE: mEdium;">UsEfulnEss, KitchEn on thE HomE Building TimElinE at X-8, and within thE articlE cEntErEd on Z-9

   
UtEnsil StoragE, KitchEn

E="font-sizE: mEdium;">UtEnsil StoragE, KitchEn  on thE HomE building TimElinE at X-8, X-9

   
UtilitiEs SEtup on SitE

E="font-sizE: mEdium;">UtilitiEs SEtup on SitEE="font-sizE: mEdium;"> - on thE HomE Building TimElinE at E="font-sizE: mEdium;">BB-1

   
Utility EasEmEnt

E="font-sizE: mEdium;">Utility EasEmEnt on thE HomE Building TimElinE at C-10, D-10

   
Utility SErvicEs Costs

E="font-sizE: mEdium;">Utility SErvicEs CostsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at L-9

   


 
ValuE

E="font-sizE: mEdium;">ValuE on thE HomE Building TimElinE at H-8, K-10

   
ValuE vs Cost

E="font-sizE: mEdium;">ValuE vs Cost on thE HomE Building TimElinE at H-8

   
VariancE

E="font-sizE: mEdium;">VariancE on thE HomE Building TimElinE at P-21, HH-23

   
Vaults & SafEs

E="font-sizE: mEdium;">Vaults & SafEon thE HomE Building TimElinE at AA-22

   
VEgEtation REmoval REgulation CompliancE

E="font-sizE: mEdium;">VEgEtation REmoval REgulation CompliancEE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">EE-3

   
VEhiclE Parking, Indoor ClEarancEs for

E="font-sizE: mEdium;">VEhiclE Parking, Indoor ClEarancEs for on thE HomE Building TimElinE within thE diagram bEginning at OO-10, QQ-20, TT-19, X-26

   
VEhiclE, OvErhEad ClEarancE for

E="font-sizE: mEdium;">VEhiclE, OvErhEad ClEarancE for : on thE HomE Building TimElinE within thE diagrams bEginning at OO-10, 00-14, 00-17, 00-19,  QQ-20, TT-19

   
VEnt and Duct ConnEction InspEction

E="font-sizE: mEdium;">VEnt and Duct ConnEction InspEction on thE HomE Building TimElinE at EE-16

   
VErify Stud LEngth for CEiling HEight

E="font-sizE: mEdium;">VErify Stud LEngth for CEiling HEight on thE HomE Building TimElinE at Q-7

   


 
Walk-Through, Final InspEction

E="font-sizE: mEdium;">Walk-Through, Final InspEction on thE HomE Building TimElinE at Z-13

   
Walkway ConcrEtE PlacEmEnt

E="font-sizE: mEdium;">Walkway ConcrEtE PlacEmEnt on thE HomE Building TimElinE at AA-6

   
Wall StrEngth

E="font-sizE: mEdium;">Wall StrEngth on thE HomE Building TimElinE at W-16

   
Wall SurfacE, IntErior, Final Installation

E="font-sizE: mEdium;">Wall SurfacE, IntErior, Final Installation on thE HomE Building TimElinE at DD-8

   
Wall SurfacE, IntErior, OrdEr MatErials

E="font-sizE: mEdium;">Wall SurfacE, IntErior, OrdEr MatErials on thE HomE Building TimElinE at EE-12

   
Warning MarkErs

E="font-sizE: mEdium;">Warning MarkErs on thE HomE Building TimElinE at V-4

   
WastE Disposal

E="font-sizE: mEdium;">WastE Disposal on thE HomE Building TimElinE at CC-25, also BEADS KEystonESEwagE

   
WatEr Rights

E="font-sizE: mEdium;">WatEr RightsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at J-17 within thE topic OWNERSHIP.

E="font-sizE: mEdium;">SEE thE articlE Ef="https://homEbuildingtimElinE.com/watEr-rights/" targEt="_blank">WatEr Rights.

   
WatEr Rights VErification

E="font-sizE: mEdium;">WatEr Rights VErificationE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Y-2

   
WatEr SErvicE Installation

E="font-sizE: mEdium;">WatEr SErvicE Installation on thE HomE Building TimElinE at E="font-sizE: mEdium;">BB-2

   
WatEr WEight

E="font-sizE: mEdium;">WatEr WEight on thE HomE Building TimElinE at Z-18

   
WatEr WEll - TEst for SafEty

E="font-sizE: mEdium;">WatEr WEll - TEst for SafEty on thE HomE Building TimElinE at DD-9

   
WatErcraft ClEarancEs for StoragE

E="font-sizE: mEdium;">WatErcraft ClEarancEs for StoragE diagrammEd on thE HomE Building TimElinE bEginning at SS-17

   
WatErfiEld

E="font-sizE: mEdium;">WatErfiEld on thE HomE Building TimElinE within thE diagram cEntErEd on FF-6

   
WatErproof BasEmEnt Walls

E="font-sizE: mEdium;">WatErproof BasEmEnt Walls on thE HomE Building TimElinE at R-16

   
WatErproof MEmbranE

E="font-sizE: mEdium;">WatErproof MEmbranEE="font-sizE: mEdium;"> - SEE  Capillary BarriEr DEfinition

   
WatErproofing ChEmicals, CapturE and Contain REsiduE

E="font-sizE: mEdium;">WatErproofing ChEmicals, CapturE and Contain REsiduE on thE HomE Building TimElinE at R-14

   
WEathEr Watch for Burning

E="font-sizE: mEdium;">WEathEr WatchE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">CC-3

   
WElcomE HomE

E="font-sizE: mEdium;">WElcomE HomE on thE HomE Building TimElinE at Z-11

   
WEll

E="font-sizE: mEdium;">WEll on thE HomE Building TimElinE at CC-26

   
WEll Drilling PErmit

E="font-sizE: mEdium;">WEll Drilling PErmit on thE HomE Building TimElinE at JJ-12

   
WEll for WatEr - Drill

E="font-sizE: mEdium;">WEll for WatEr - DrillE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">Y-2

   
WEll WatEr SafEty TEst

E="font-sizE: mEdium;">WEll WatEr SafEty TEst on thE homE Building TimElinE at DD-9

   
WEt-Wall Installation

E="font-sizE: mEdium;">WEt-Wall Installation on thE HomE Building TimElinE at DD-8

   
WEtlands

E="font-sizE: mEdium;">WEtlands on thE HomE Building TimElinE at FF-4

   
WhEElchair

E="font-sizE: mEdium;">WhEElchair on thE HomE Building TimElinE at PP-19, RR-10

   
WhEElchair Van AccEss

E="font-sizE: mEdium;">WhEElchair Van AccEss on thE HomE Building TimElinE in thE diagram bEginning at PP-19

   
Wild Animals

 

E="font-sizE: mEdium;">

Wild Animals on thE HomE Building TimElinE at M-16

 

E="font-sizE: mEdium;">

InsidE HomEBuildingTimElinE.com within thE articlE Ef="https://homEbuildingtimElinE.com/EaglE-flyablE-is-EdiblE/" targEt="_blank">EAGLE : "FLYABLE IS EDIBLE"

 

E="font-sizE: mEdium;">

InsidE HomEBuildingTimElinE.com, within thE articlE Ef="https://homEbuildingtimElinE.com/lights-out-by-thE-sEa/" targEt="_blank">LIGHTS OUT BY THE SEA

E="font-sizE: mEdium;">InsidE HomEBuildingTimElinE.com within thE articlE Ef="https://homEbuildingtimElinE.com/why-thE-grizzly-bEar-grins/" targEt="_blank">WHY THE GRIZZLY BEAR GRINS

   
WildlifE Habitat REgulations

E="font-sizE: mEdium;">WildlifE Habitat REgulations on thE HomE Building TimElinE at FF-4, I-20

   
Wind

E="font-sizE: mEdium;">Wind on thE HomE Building TimElinE at JJ-12

   
Wind HarvEsting

E="font-sizE: mEdium;">Wind HarvEsting on thE HomE Building TimElinE at CC-26

   
Wind Rights

E="font-sizE: mEdium;">Wind RightsE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">I-18

   
Wind ShEar

E="font-sizE: mEdium;">Wind ShEar on thE HomE Building TimElinE at AA-16

   
Windows DElivErEd

E="font-sizE: mEdium;">Windows DElivErEd on thE HomE Building TimElinE at AA-18

   
Windows, Install

E="font-sizE: mEdium;">Windows, Install on thE HomE Building TimElinE at BB-18

   
Windows, OrdEr for DElivEry

E="font-sizE: mEdium;">Windows, OrdEr for DElivEry on thE HomE Building TimElinE at R-15

   
WirE MEsh and StEEl Rods for REinforcing

E="font-sizE: mEdium;">WirE MEsh and StEEl Rods for REinforcing on thE HomE Building TimElinE at Q-10

   
Wiring, OvErhEad

E="font-sizE: mEdium;">WiringE="font-sizE: mEdium;"> E="font-sizE: mEdium;">OvErhEad E="font-sizE: mEdium;">on thE HomE Building TimElinE at E="font-family: "TimEs NEw Roman";">E="font-sizE: mEdium;">I-3

   
Wish List & IdEa NotEbook

E="font-sizE: mEdium;">Wish List & IdEa NotEbook on thE HomE Building TimElinE at R-23, S-23

   
Work Load

E="font-sizE: mEdium;">Work Load on thE HomE Building TimElinE at AA-17

   
WorkmanlikE MannEr

E="font-sizE: mEdium;">WorkmanlikE MannEr insIdE HomEBuildingTimElinE.com

E="font-sizE: mEdium;">Within thE articlE Ef="https://homEbuildingtimElinE.com/workmanlikE-mannEr-dEfinEd/" targEt="_blank">WORKMANLIKE MANNER - DEFINED

   


 
Yard DEbris Disposal and Pickup

E="font-sizE: mEdium;">Yard DEbris Disposal and PickupE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">KK-1

   
Yard SprinklEr

E="font-sizE: mEdium;">Yard SprinklErE="font-sizE: mEdium;"> on thE HomE Building TimElinE at E="font-sizE: mEdium;">K-11, Q-25

E="font-sizE: mEdium;">ArticlE Ef="http://homEbuildingtimElinE.com/yard-sprinklErs-cross-phasE-installation/" targEt="_blank" stylE="font-sizE: mEdium;">E="font-sizE: mEdium;">YARD SPRINKLERS - CROSS-PHASE INSTALLATION

 

   
Yard StructurEs

E="font-sizE: mEdium;">Yard StructurEs on thE HomE Building TimElinE at E="font-sizE: mEdium;">A-2

   


 
Zoning

E="font-sizE: mEdium;">Zoning on thE HomE Building TimElinE at G-7, I-20, BEADS KEystonE at H-10, L-12, M-19, LL-16

   


 
© Copyright 2010 - Andy Bozeman
  Site by ProSaura Systems LLC