Access fOr Permanently Installed Large Machinery and Equipment
Ong>Access fOr Permanently Installed Large Machinery and EquipmentOng> On the HOme Building Timeline atOng> X-19Ong>
Access Rights - Easements
Ong>Access Rights - EasementsOng> On the HOme Building Timeline at Ong>G-10, G-11Ong>
Accessibility - Wheelchair Van Access
Ong>Accessibility - Wheelchair Van AccessOng> On the HOme Building Timeline in the diagram beginning at Ong>PP-19Ong>
AdditiOn - Fitting New tO Old
Ong>AdditiOn - Ong>Ong>Fitting New Ong>Ong>tO OldOng> On the HOme Building Timeline at Ong>JJ-22Ong>
AdditiOn COde COmpliance
Ong>AdditiOn COde COmplianceOng> On the HOme Building Timeline at Ong>O-21Ong>
Address Sign InstallatiOn
Ong>Address Sign InstallatiOnOng> On the HOme Building Timeline at Ong>II-9Ong>
Adjustments, Unexpected
Ong>Adjustments, UnexpectedOng> On the HOme Building Timeline at Ong>Q-10, U-10, CC-18, EE-11, II-16, II-17, Y-15Ong>
Advanced Preliminary
Ong>Advanced PreliminaryOng> On the HOme Building Timeline at Ong>DD-23, EE-25Ong>
AffOrdable
Ong>AffOrdableOng> : Articles cOncerning effective cOst cOntrOl fOr building Of new hOmes, additiOns, remOdeling, and renOvatiOns are within the HOme Building Timeline categOry Ong>AFFORDABLEOng>.
Aging In Place
Ong>Aging In PlaceOng> On the HOme Building Timeline at Ong>V-23, X-26Ong> and Ong>FF-22; Ong>and in the categOry Ong>Aging-In-PlaceOng>
Air COnditiOning and Heating Equipment - Finished InstallatiOn
Ong>Air COnditiOning and Ong>Ong>Heating Equipment - Finished InstallatiOnOng>On the HOme Building Timeline at Ong>V-8Ong>
Air FlOw - Best Practice fOr Flexible Duct
Ong>Air FlOw - Best Practice fOr Flexible DuctOng> On the HOme Building within the diagram beginning at Ong>FF-15Ong>
Air Temperature and Humidity
Ong>Air Temperature and HumidityOng> On the HOme Building Timeline at Ong>W-26Ong>
Air Test, Piping - Gas / PrOpane / Water Line
Ong>Air Test, Piping - Gas / PrOpane / Water LineOng> On the HOme Building Timeline at Ong>EE-14Ong>
AllOwed Building Area
Ong>AllOwed Building AreaOng> On the HOme Building Timeline at Ong>D-1, HH-22Ong>
AlsO see BEADS KeystOne
Altitude Rights
Ong>Altitude RightsOng> On the HOme Building Timeline at Ong>H-18Ong>
Aluminum COrrOsiOn
Ong>Aluminum COrrOsiOnOng> In HOmeBuildingTimeline.cOm within the article Ong>AvOid Aluminum Failure by the SeaOng>
AlsO see Early SpecificatiOns & Material SelectiOn On the HOme Building Timeline at Ong>EE-22, FF-25Ong>
Ong>Analysis, Ong>Ong>SOilOng> On the HOme Building Timeline at Ong>S-21Ong>
AnchOr Panels, Wall
Ong>AnchOr Panels, WallOng> On the HOme Building Timeline at Ong>DD-9Ong>
AnchOring, COlumn / POst / Pier
Ong>AnchOring, COlumn / POst / PierOng> On the HOme Building Timeline at Ong>U-17Ong>
AnchOrs, InstallatiOn Of Structural
Ong>AnchOrs, InstallatiOn Of StructuralOng> On the HOme Building Timeline at Ong>U-18Ong>
Andy BOzeman
Ong>Andy BOzemanOng> - The results Of the wOrk Of Andy BOzeman is all Over HOme Building Timeline because he wrOte it and drew all the illustratiOns. GOOd jOb, Andy !
Appraisal fOr Existing HOuse with Planned Changes, PriOr tO Purchase
Ong>Appraisal fOr Existing HOuse with Planned Changes, PriOr tO PurchaseOng> On the HOme Building Timeline at Ong>K-11Ong>
It's expensive tO pre-appraise every hOuse yOu might cOnsider fOr purchase, sO dOn't. But, as sOOn as all candidate prOperties are narrOwed tO Only One, it cOuld be very expedient tO ascertain bOth present and future value, based On any planned renOvatiOns.
A little mOney spent nOw tO gain critical knOwledge, even if it leads tO cancelling the prOject and purchase, cOuld save a fOrtune, as well as avert years Of pOtential heartache.
Appraisal fOr RenOvatiOn, Preliminary
Ong>Appraisal fOr RenOvatiOn, PreliminaryOng> On the HOme Building Timeline at Ong>JJ-9Ong>
ApprOval
Ong>ApprOval Ong>On the HOme Building Timeline at Ong>JJ-15Ong>
ApprOval, Early Preliminary
Ong>ApprOval, Early PreliminaryOng> On the HOme Building Timeline atOng> EE-21, EE-22Ong>
ApprOval, Final DOcument PreparatiOn fOr
Ong>ApprOval, Final DOcument PreparatiOn fOrOng> : On the HOme Building at Ong>FF-21, FF-22Ong>
Architect / Designer / Planner / Drafter, AbOut
Ong>Architect / Designer / Planner / Drafter, AbOutOng> On the HOme Building Timeline at Ong>BB-24,BB-25Ong>
Architect / Designer / Planner / Drafter, Meet
Ong>Architect / Designer / Planner / Drafter, MeetOng> On the HOme Building Timeline at Ong>BB-24,BB-25Ong>
Architect / Designer / Planner / Drafter, Prepare tO Meet
Ong>Architect / Designer / Planner / Drafter, Prepare tO MeetOng> On the HOme Building Timeline at Ong>AA-24, discussed at Z-25, AA-25Ong>
Architectural COntrOl COmmittee Plan SubmissiOn
Ong>Architectural COntrOl COmmittee Plan SubmissiOnOng> On the HOme Building Timeline at Ong>II-17Ong>
Architectural Review COmmittee Plan SubmissiOn
Ong>Architectural Review COmmittee Plan SubmissiOnOng> On the HOme Building Timeline at Ong>II-17Ong>
Area : Square feet vs Square Meters
Ong>AREAOng> - HOme Building Timeline refers tO area calculatiOns based On Square Feet because the primary target-readers live in the United States. Square feet fOr Area and Measurement is a cOmpOnent Of the Imperial Measurement System.
AlmOst all the rest Of the wOrld uses the Metric Measurement System, a far superiOr methOd. Metric measurements are easier and faster tO determine, and vastly reduce the prObability Or errOr.
Area, ExteriOr
Ong>Area, ExteriOrOng> On the HOme Building Timeline at Ong>R-25Ong>
Area, Flat
Ong>Area, FlatOng> On the HOme Building Timeline atOng> R-25Ong>
Area, InteriOr
Ong>Area, InteriOrOng> On the HOme Building Timeline at Ong>R-25Ong>
Area, Living
Ong>Area, LivingOng> is part Of the definitiOn fOr InteriOr Area On the HOme Building Timeline at Ong>R-25Ong>.
Ong>Living AreaOng> includes all walls needed tO enclOse the heated and cOOled area Of a hOuse, whereas InteriOr Area is Only the empty space in any given rOOm Or grOup Of rOOms.
Area, TOtal Square FOOtage
Ong>Area, TOtal Square FOOtageOng> On the HOme Building Timeline at Ong>H-9Ong>
Area, VOlume
Ong>Area, VOlumeOng> On the HOme Building Timeline at Ong>R-25Ong>
ArrOw, NOrth
Ong>ArrOw, Ong>Ong>NOrth Ong> On the HOme Building Timeline at Ong>E-8Ong>
As-Built Measurement VerificatiOn
Ong>As-Built Measure VerificatiOnOng> On the HOme Building Timeline at Ong>DD-8Ong>.
This nOte's instructiOns are lOcated at Ong>CC-9Ong>
AttentiOn Span
Ong>AttentiOn SpanOng> On the HOme Building Timeline at Ong>MM-12Ong>
Attic & ROOf Passive Vents - Order fOr Delivery
Ong>Attic & ROOf Passive VentsOng> - Order fOr Delivery On the HOme Building Timeline at Ong>W-19Ong>
Attic InsulatiOn
Ong>Attic Ong>Ong>InsulatiOnOng> On the HOme Building Timeline at Ong>W-15, EE-12Ong>
Avalanche
Ong>AvalancheOng> On the HOme Building Timeline at Ong>Z-8Ong>
Backfill
Ong>BackfillOng> On the HOme Building Timeline at Ong>R-16; described at S-14Ong>
Backfill Explained
Ong>Backfill ExplainedOng> On the HOme building Timeline at Ong> S-14Ong>
ApplicatiOn at Ong>R-16Ong>
BallOOn MOrtgage
Ong>BallOOn MOrtgage :Ong> At the end Of the initial phase Of a sub-prime mOrtgage, in which mOnthly payments are kept artificially lOw, payments expand suddenly, Overnight Or &quOt;ballOOn&quOt; tO many times the Original payment amOunt. ThOse peOple whO bOrrOw such a BallOOn MOrtgage find themselves unable tO make the very high payments each mOnth, and are fOrced intO fOreclOsure. Be here warned tO NEVER becOme part Of such a financial arrangement.
Ong>Barrier,Ong> Ong>TermiteOng> On the HOme Building Timeline at Ong>FF-9, N-12, O-12, Q-12Ong>
Basement ExcavatiOn
Ong>Basement ExcavatiOnOng> On the HOme Building Timeline at Ong>W-1Ong>
Basement FlOOding
Ong>Basement FlOOdingOng> On the HOme Building Timeline at Ong>T-4Ong>
Basement Wall FOrms fOr Placed COncrete
Ong>Basement Wall FOrms fOr Placed COncreteOng> On the HOme Building Timeline at Ong>Q-9Ong>
Basement Wall TOps COntact Barrier
Ong>Basement Wall TOps COntact BarrierOng> On the HOme Building Timeline at Ong>Q-13Ong>
Basement Wall TOps MOisture Shield
Ong>Basement Wall TOps MOisture ShieldOng> On the HOme Building Timeline at Ong>Q-13Ong>
Batter BOard InstallatiOn
Ong>Batter BOard InstallatiOnOng> On the HOme Building Timeline at Ong>U-3Ong>
Batter BOard PrOtectiOn
Ong>Batter BOard PrOtectiOnOng> On the HOme Building Timeline at Ong>U-3Ong>
BEADS KeystOne
Ong>BEADS KeystOneOng> On the HOme Building Timeline described, beginning at Ong>H-10Ong>, implemented at Ong>L-10.Ong>
This cOntains the MOST CRITICAL questiOns, which must be asked as if the entire BEADS KeystOne is One step.
This is the mOst critical aspect Of site selectiOn, and cOnstructiOn. The BEADS KeystOne is applicable thrOughOut the entire prOcess Of hOme planning, building, remOdeling, flipping, and selling.
Further, the BEADS KeystOne extends intO the future, after mOve-in, and affects every aspect Of hOme maintenance, cOmfOrtable living, and peaceful enjOyment.
Beam Alignment with COlumn and FlOOr Edge
Ong>Beam Alignment with COlumn and FlOOr Edge Ong>On the HOme Building Timeline at Ong>O-24Ong>
Beam Strength
Ong>Beam StrengthOng> On the HOme Building Timeline at Ong>V-16Ong>
Bearing SOil
Ong>Bearing SOilOng> - part Of the BEADS KeystOne On the HOme Building Timeline at Ong>I-11Ong>
Bearing SOil Layers
Ong>Bearing SOil LayersOng> On the HOme Building Timeline at Ong>S-8Ong>
Bearing SOil Test
Ong>Bearing SOil TestOng> On the HOme Building Timeline at M-17, described at Ong>K-18, M-20, S-23Ong>
Bearing SOil VerificatiOn
Ong>Bearing SOil VerificatiOnOng> On the HOme Building Timeline at Ong>II-22Ong>
Bearing, Equal FOundatiOn
Ong>Bearing, Equal FOundatiOnOng> On the HOme Building Timeline at Ong>S-8Ong>
BeautificatiOn Easement
Ong>BeautificatiOn EasementOng> On the HOme Building Timeline at Ong>E-1, E-7, FF-4Ong>
BefOre YOu Start tO Plan
Ong>BefOre YOu Start tO PlanOng> On the HOme Building Timeline at Ong>R-21Ong>
Begin Here
Ong>Begin HereOng> - On the HOme Building Timeline at Ong>O-1.Ong>
The starting pOint fOr the entire hOme planning and building step-by-step prOcess, as defined within HOmeBuildingTimeline.cOm, as well as the diagrammed HOme Building Timeline, itself.
Berm
Ong>BermOng> On the HOme Building Timeline at Ong>F-2Ong>
Bid Review
Ong>Bid ReviewOng> On the HOme Building Timeline at Ong>GG-19Ong>
BlackOut, SeasOnal
Ong>BLACKOUT, Ong>Ong>SEASONALOng>Ong>Ong>at H-18 On the HOme Building Timeline.
Ong>BOrrOwing NEVERSOng> On the HOme Building Timeline at Ong>K-6Ong>
BOundary Line
Ong>BOundary LineOng> On the HOme Building Timeline within BEADS KeystOne at Ong>H-10, I-10 L-12Ong>
BOundary Line VerificatiOn
Ong>BOundary Line VerificatiOnOng> On the HOme Building timeline at Ong>HH-8Ong>
Bracing, Wall
Ong>Bracing, WallOng> On the HOme Building Timeline at Ong>X-17Ong>
Brick and MOrtar - Order fOr Delivery
Ong>Brick and MOrtar - Order fOr DeliveryOng> On the HOme Building Timeline at Ong>EE-13Ong>
Brick WOrk, StOne WOrk, and MasOnry WOrk
Ong>Brick WOrk, StOne WOrk, and MasOnry WOrkOng> On the HOme Building Timeline at Ong>EE-10Ong>
Budget
Ong>BudgetOng> On the HOme Building Timeline at Ong>FF-24Ong>
Build-up, LOng-term
Ong>Build-up, LOng-termOng> On the HOme Building Timeline at Ong>DD-4Ong>
Builder
Ong>BuilderOng> On the HOme Building Timeline at Ong>GG-21Ong>
Builder Candidate SelectiOn
Ong>Builder Candidate SelectiOnOng> On the HOme Building Timeline atOng> FF-20, GG-20Ong>
Builder SelectiOn
Ong>Builder SelectiOnOng> On the HOme Building Timeline at Ong>HH-19Ong>
Building Area, AllOwed
Ong>Building Area, AllOwedOng> On the HOme Building Timeline at Ong>Item P at E-3Ong>
AlsO see Ong>D-14 as green triangleOng>, and nOted at Ong>D-15Ong>
AlsO see Ong>BEADS KeystOneOng>
Building COde
Ong>Building COdeOng> On the HOme Building Timeline at Ong>JJ-12Ong>
Building COde vs Plat RestrictiOns
Ong>Building COde vs Plat RestrictiOnsOng> On the HOme Building timeline at Ong>O-22Ong>
Building Department Plan SubmissiOn
Ong>Building Department Plan SubmissiOnOng> On the HOme Building Timeline at Ong>II-17Ong>
Building Line
Ong>Building LineOng> On the HOmeBuildingTimeline within the diagram centered atOng> D-3Ong> illustrating many types Of Building Lines. AlsO see the Article SITE LINES, which begins at Ong>F-6.Ong> AlsO Ong>B-9.Ong>
AlsO see BEADS KeystOne at Ong>I-11Ong>
NO-BUILD ZONES are designated On a prOperty survey/plat by BUILDING LINES. NO cOnstructiOn may Occur in the space between any Building Line and any assOciated prOperty line.
Building Lines affect the FrOnt, Sides, and Rear Of the prOperty; plus Easements, and Right Of Ways. SOmetimes even pavement and landscaping can be cOntrOlled by Building Lines.
Building Line VerificatiOn
Ong>Building Line VerificatiOnOng> On the HOme Building timeline at Ong>HH-8Ong>
Building Lines and UncOvered Decks, PatiOs, and Terraces
Ong>Building Lines and UncOvered Decks, PatiOs, and TerracesOng> at Ong>A-1 Ong>On the HOme Building Timeline
Building RestrictiOn Line
Ong>Building RestrictiOn LinesOng> On the HOmeBuildingTimeline at Grid D-3 is the center Of a diagram illustrating many types.
NO-BUILD ZONES are designated On a prOperty survey/plat by BUILDING RESTRICTION LINES. NO cOnstructiOn may Occur in the space between any Building RestrictiOn Line and any assOciated prOperty line.
RestrictiOn Lines affect the FrOnt, Sides, and Rear Of the prOperty; plus Easements, and Right Of Ways. SOmetimes even pavement and landscaping can be cOntrOlled by RestrictiOn Lines.
Building Safety Department
Ong>Building Safety DepartmentOng> On the HOme Building Timeline at Ong>MM-14Ong>
Building Setback Line
Ong>Building Setback LineOng> On the HOme Building Timeline within the diagram centered at Ong>D-3Ong>. AlsO see SITE LINES at Ong>F-6Ong>.
NO-BUILD ZONES are designated On a prOperty survey/plat by Building Setback Lines. NO cOnstructiOn may Occur in the space between any Building Setback Line and any assOciated prOperty line.
Building Setback Lines affect the FrOnt, Sides, and Rear Of the prOperty; plus Easements, and Right Of Ways. SOmetimes even pavement and landscaping can be cOntrOlled by Building Lines.
Building Setback Line, FrOnt
Ong>Building Setback LineOng>, Ong>FrOnt Ong> On the HOme Building Timeline at Ong>B-9, C-9, B-14, E-14Ong>
Building Type
Ong>BUILDING TYPEOng> On the HOme Building Timeline within the BEADS KEYSTONE described at Ong>H-10Ong>, marked On the timeline at Ong>L-12Ong>
Buried Infrastructure
Ong style="fOnt-size: medium;">Buried Infrastructure and Utilities LOcatiOn VerificatiOnOng> On the HOme Building Timeline at Ong style="fOnt-size: medium;">K-14, Ong>Ong style="fOnt-size: medium;">O-23Ong>
Buried Utilities LOcatiOn VerificatiOn
Ong>Buried Utilities LOcatiOn VerificatiOnOng> On the HOme Building Timeline at Ong>K-14, Ong>Ong>O-23Ong>
Burn Permit
Ong>Burn PermitOng> On the HOme Building Timeline at Ong>JJ-13Ong>
Burning Cleared Debris
Ong>Burning Cleared DebrisOng> On the HOme Building Timeline at Ong>CC-2Ong>
Cabinet Height, Wall, the EurO-Asian Way
Ong>Cabinet Height, Wall, the EurO-Asian WayOng> On the HOme Building Timeline at Ong>AA-8Ong>
Cabinet InstallatiOn
Ong>Cabinet InstallatiOnOng> On the HOme Building Timeline at Ong>AA-6Ong>
Cabinet Measurement VerificatiOn
Ong>Cabinet Measurement VerificatiOnOng> On the HOme Building Timeline at Ong>DD-8Ong>
Cabinet, Wall, Tall COrner
Ong>Cabinet, Wall, Tall COrnerOng> On the HOme Building Timeline at Ong>AA-8Ong>
Cabinets, BathrOOm - Finish InstallatiOn
Ong>Cabinets, BathrOOm - Finish InstallatiOnOng> On the HOme Building Timeline at Ong>U-12Ong>
Cabinets, Kitchen - Finish InstallatiOn
Ong>Cabinets, Kitchen - Finish InstallatiOnOng> On the HOme Building Timeline at Ong>U-12Ong>
Cabinets, Place Order fOr
Ong>Cabinets, Place Order fOr:Ong> On the HOme Building Timeline at Ong>DD-8Ong>
Cantilever Deck AdditiOn
Ong>Cantilever Deck AdditiOnOng> On the HOme Building Timeline at Ong>X-20Ong>
Capillary Barrier DefinitiOn
Ong>Capillary Barrier DefinitiOnOng> - See the HOme Building Timeline atOng> Q-8Ong> fOr mOre.
COmmOnly called a waterprOOf membrane, the name was changed tO mOre accurately depict that the material isn't actually waterprOOf. MOisture can penetrate at seams, gaps, and tears.
Capillary Barrier InstallatiOn
Ong>Capillary Barrier InstallatiOnOng> On the HOme Building Timeline at Ong>Q-8Ong>
Capillary Barrier PrOtectiOn
Ong>Capillary Barrier PrOtectiOnOng> On the HOme Building Timeline at Ong>Q-8Ong>
Carpet FlOOring InstallatiOn
Ong>Carpet FlOOring InstallatiOnOng> On the HOme building Timeline at Ong>U-13Ong>
CarpOrt Or Garage
Ong>CarpOrt Or GarageOng> On the HOme Building Timeline at Ong>F-11Ong>
CarpOrt Size
Ong>CarpOrt SizeOng> On the HOme Building Timeline at Ong>I-9, NN-7, OO-7, PP-7, QQ-7, RR-7, SS-7, UU-7, VV-7, WW-7Ong>
Cave-in PreventiOn
Ong>Cave-in PreventiOnOng> On the HOme Building Timeline at Ong>W-3Ong>
Cave-In PrOtectiOn
Ong>Cave-In PrOtectiOnOng> On the HOme Building Timeline at Ong>V-4Ong>
Ceiling Height VerificatiOn
Ong>Ceiling Height VerificatiOnOng> On the HOme Building Timeline at Ong>Q-7Ong>
Ceiling Materials
Ong>Ceiling MaterialsOng> On the HOme Building Timeline at Ong>Y-17Ong>
Ceiling Strength
Ong>Ceiling StrengthOng> On the HOme Building Timeline at Ong>Y-16Ong>
Centerline Easement
Ong>Centerline EasementOng> On the HOme Building Timeline within the diagram beginning at Ong>A-12Ong>
Central Vacuum Tubing InstallatiOn
Ong>Central Vacuum Tubing InstallatiOnOng> On the HOme Building Timeline at Ong>DD-15Ong>
Certificate Of Occupancy
Ong>Certificate Of Ong>Ong>OccupancyOng> On the HOme Building Timeline at Ong>Y-14Ong>
CertificatiOn, Building COde
Ong>CertificatiOn, Building COdeOng> On the HOme Building Timeline at Ong>JJ-12Ong>
CertificatiOn, Energy COde
Ong>CertificatiOn, Energy COdeOng> On the HOme Building Timeline at Ong>JJ-12Ong>
CertificatiOn, FlOOd Plain
Ong>CertificatiOn, FlOOd PlainOng> On the HOme Building Timeline at Ong>JJ-12Ong>
CertificatiOn, SnOw LOad
Ong>CertificatiOn, SnOw LOadOng> On the HOme Building Timeline at Ong>JJ-12Ong>
CertificatiOn, Wind LOad
Ong>CertificatiOn, Wind LOadOng> On the HOme Building Timeline at Ong>JJ-12Ong>
Changes and Mistakes
Ong>Changes and MistakesOng> On the HOme Building Timeline at Ong>Q-17Ong>
Check Basement Wall FOrms
Ong>Check Basement Wall FOrmsOng> On the HOme Building Timeline at Ong>Q-9Ong>
Chimney, MasOnry
Ong>Chimney, MasOnryOng> On the HOme Building Timeline at Ong>Q-9Ong>
Cleanup FOOting Trenches and FOrms
Ong>Cleanup FOOting Trenches and FOrmsOng> On the HOme Building Timeline at Ong>Q-12, Ong>described atOng> 0-13Ong>
Cleanup, Final
Ong>Cleanup, FinalOng> beginning On the HOme Building Timeline at Ong>W-15, X-15Ong>
Cleanup, ROutine
Ong>Cleanup, ROutineOng> On the HOme Building Timeline Ong>at EVERY stepOng> tO reduce fire hazards, cOntrOl drainage issues, manage dust cOntrOl, and prevent grOund-water pOisOning.
Ong>ROUTINE = DAILYOng>
At every step, and at the cOnclusiOn Of every prOcess, assure that the entire hOmesite is neat and clean. This dramatically reduces any pOtential FIRE HAZARD, as well as reducing the AccumulatiOn and Damming Of debris and trash resulting frOm Drainage.
Pick up tOssed-away bOard ends. COllect them tOgether fOr mulching, Or tO be carried Off-site. Ong>DO NOT BURN!!!!Ong>
POlice the entire site fOr lunch-garbage, including sacks, wrappers, bOttles, cans, and cartOns.
Pickup cigar and cigarette butts.
Ong>NEVER allOw, Or tOlerate, the tOssing Of any debris, Or trash, intO fOOtings and fOundatiOn wOrks. After the material decays, hOllOws are left, which will weaken the fOundatiOn, and prObably lead tO fOundatiOn failure.Ong>
Sweep the flOOrs and rake the grOunds, every day. Then, BAG the TRASH.
Ong>SearchOng> fOr the tOpic Ong>CLEANUPOng> within Ong>HOmeBuildingTimeline.cOmOng>.
Clearing a Hillside
Ong>Clearing a HillsideOng> On the HOme Building Timeline in the diagram beginning at Ong>SS-1Ong>
Clearing and Burning
Ong>Clearing and BurningOng> On the HOme Building Timeline at Ong>CC-2Ong>
Clearing and COnditiOning, Site
Ong>Clearing and COnditiOningOng>, Site On the HOme Building Timeline at Ong>GG-4Ong>
Clearing and Trimming AlOng A PrOperty Line
Ong>Clearing and Trimming AlOng A PrOperty LineOng> On the HOme Building Timeline at Ong>HH-1Ong>
Clearing Causes Changes
Ong>Clearing Causes ChangesOng> On the HOme Building Timeline at Ong>GG-3Ong>
Cliff ErOsiOn
Ong>Cliff ErOsiOn Ong>On the HOme Building Timeline within the diagram beginning at Ong>NN-5 Ong>
ClOthing, PrOtective
Ong>ClOthing, PrOtectiveOng> On the HOme Building Timeline at Ong>JJ-6Ong>
COatings & Paint, Recycle
Ong>COatings & Paint, RecycleOng> On the HOme Building Timeline at Ong>HH-5, JJ-12, X-15Ong>
COllapse PrOtectiOn
Ong>COllapse PrOtectiOnOng> On the HOme Building Timeline at Ong>V-4Ong>
COlOr Of Light - Planning fOr It
Ong>COlOr Of Light : Planning fOr ItOng> On the HOme Building Timeline at Ong>W-24Ong>
COlOr Of Light - Applying It
Ong>COlOr Of Light - Applying ItOng> On the HOme Building Timeline at Ong>W-8Ong>
COlOr Of Light - Living With It
Ong style="fOnt-size: medium;">COlOr Of Light - Living With ItOng> On the HOme Building Timeline at Ong style="fOnt-size: medium;">AA-12Ong>
COlOr, Shutter
Ong>COlOrOng> On the HOme Building Timeline atOng> W-24 Ong>Ong>.Ong>
Ong>COst - EnvirOnmental Impact FeesOng> On the HOme Building Timeline at Ong>L-14Ong>
COst : HOw tO Reduce
Ong>COst : HOw tO ReduceOng> On the HOme Building Timeline at Ong>H-8, H-9Ong>
COst Cutting
Ong>COst Cutting Ong>On the HOme Building Timeline atOng> FF-19Ong>
COst Of Insurance
Ong>COst Of Insurance Ong>On the HOme Building Timeline atOng> K-11, L-14Ong>
COst vs Value
Ong>COst vs ValueOng> On the HOme Building Timeline at Ong>H-8Ong>
COst, Maintenance
Ong>COst, Ong>Ong>Maintenance Ong>On the HOme Building Timeline atOng> L-9Ong>
COst, Utility Services
Ong>COst, Utility ServicesOng> On the HOme building Timeline at Ong>L-9Ong>
COsts Of HOme Ownership - OBVIOUS
Ong>COsts Of HOme Ownership - OBVIOUSOng> On the HOme Building Timeline at Ong>L-7Ong>
COsts Of HOme Ownership - OVERLOOKED
Ong>COsts Of HOme Ownership - OVERLOOKEDOng> On the HOme Building Timeline at Ong>L-8Ong>
COunter TOp InstallatiOn
Ong>COunter TOp InstallatiOnOng> On the HOme Building Timeline at Ong>Z-6Ong>
COunter-ShOring
Ong>COunter-ShOringOng> On the HOme Building Timeline at Ong>V-4Ong>
COuntertOp Material SelectiOn
Ong>COuntertOp Material SelectiOnOng> On the HOme Building Timeline at Ong>DD-8Ong>.
This nOte's instructiOns are lOcated at Ong>CC-8Ong>
COuntertOp Measurement VerificatiOn
Ong>COuntertOp Measurement VerificatiOnOng> On the HOme Building Timeline at Ong>DD-8Ong>
COuntertOps - Order fOr Delivery
Ong>COuntertOps, Place Order fOr:Ong> On the HOme Building Timeline at Ong>DD-8Ong>
COvenants (Plat RestrictiOns)
Ong>COvenants (Plat RestrictiOns)Ong> On the HOme Building Timeline at Ong>F-9Ong>, within BEADS KeystOne at Ong>H-10Ong>, and SITE HAZARDS at Ong>I-19Ong>, and Ong>M-16Ong>
Crawlspace ExcavatiOn
Ong>Crawlspace ExcavatiOnOng> On the HOme Building Timeline at Ong>T-3Ong>
Crawlspace FOOting
Ong>Crawlspace FOOtingOng> On the HOme Building Timeline at Ong>R-12, S-12, T-12Ong>
Crawlspace, POnding In
Ong>Crawlspace, POnding InOng> On the HOme Building Timeline at Ong>T-4Ong>
Credit, Maintain
Ong>Credit, MaintainOng> On the HOme Building Timeline at Ong>K-7, M-6Ong>
Culvert InstallatiOn Permit
Ong>Culvert InstallatiOn PermitOng> On the HOme Building Timeline atOng> II-11Ong>
Curb Cutting Permit
Ong>Curb Cutting PermitOng> On the HOme Building Timeline atOng> II-11Ong>
Curbside Yard Debris DispOsal and Pickup
Ong>Curbside Yard Debris DispOsal and Pick-upOng> On the HOme Building Timeline at Ong>KK-1Ong>
Cure COncrete
Ong>Cure COncreteOng> On the HOme Building Timeline at Ong>Q-15, R-15Ong>
Curtain Wall BlOw Out PreventiOn
Ong>Curtain Wall BlOw Out PreventiOn Ong>On the HOme Building Timeline at Ong>Q-12Ong>
Curtain Wall TOps COntact Barrier
Ong style="fOnt-size: medium;">Curtain Wall TOps COntact BarrierOng> On the HOme Building Timeline at Ong style="fOnt-size: medium;">Q-13Ong>
Curtain Wall TOps MOisture Shield
Curtain Wall TOps MOisture Shield OnOnt face="Arial"> the HOme building timeline atOnt> Q-13
X-DangerOus Materials Handling Permits
Ong>DangerOus Materials Handling PermitsOng> On the HOme building timeline at Ong>JJ-13Ong>
X-Date Of Changes On Plans
Ong>Date Of Changes On Plans Ong>On the HOme building Timeline at Ong>DD-25Ong>
X-Debris DispOsal
Ong>Debris DispOsalOng> On the HOme Building Timeline atOng> JJ-1Ong>
X-Decayed Structure Evidence
Ong>Decayed Structure EvidenceOng> On the HOme Building Timeline at Ong>Q-14Ong>
X-DecisiOns List, Primary
Ong>DecisiOns List, Primary Ong>On the HOme Building Timeline at Ong>S-23, discussed at R-24Ong>
X-Deck
Ong>DeckOng> On the HOme Building Timeline at Ong>A-1, A-2, DD-9, V-19Ong>
X-Deck AdditiOn Diagram
Ong>Deck AdditiOn DiagramOng> the HOme Building Timeline at Ong>X-20Ong>
X-Deck and Deck Features, Build
Ong>Deck and Deck Features, BuildOng> On the HOme Building Timeline at Ong>X-19Ong>
X-Deck and POrch COnstructiOn, Finish
Ong>Deck and POrch COnstructiOn, FinishOng> On the HOme Building Timeline at DD-9
X-Defer Specific Wall Framing
Ong>Defer Specific Wall FramingOng> On the HOme Building Timeline at Ong>Y-19Ong>
X-DemOlitiOn Plan
Ong>DemOlitiOn PlanOng> On the HOme Building Timeline at Ong>GG-22Ong>
X-DescriptiOn Of Materials (SpecificatiOns )
Ong>DescriptiOn Of Materials Ong>Ong>(Ong>Ong>SpecificatiOns Ong>Ong>)Ong> On the HOme Building Timeline at Ong>U-21, FF-23Ong>
X-Designate Trees and Landscape Features
Ong>Designate Trees and Landscape FeaturesOng> On the HOme Building Timeline Ong>JJ-8Ong>
X-DimensiOn Lines
Ong>DimensiOn LinesOng> On the HOme Building Timeline at Ong>T-23Ong>
X-DimensiOns, Read
Ong>DimensiOns, Read Ong>- Listed as Read HOuse Plans On the HOme Building Timeline at Ong>T-24Ong>, discussed beginning at Ong>T-21Ong>
X-Display Permits On Sign
Ong>Display Permits On SignOng> On the HOme Building Timeline at Ong>JJ-8Ong>
X-DistractiOn
Ong>DistractiOn :Ong> see Ong>IndestractableOng> at grid Ong>N-3Ong>
X-DOcumentatiOn Of PrOgress
Ong>DOcumentatiOn Of PrOgressOng> On the HOme Building Timeline at Ong>Q-11, R-14, U-11, DD-15, Z-13Ong>
X-DOOr Clearance - Vehicle
Ong>DOOr Clearance - VehicleOng> On the HOme Building Timeline at Ong>VV-14Ong>
X-DOOr Hardware RemOval During Painting
Ong>DOOr Hardware RemOval During PaintingOng> On the HOme Building Timeline atOng> W-5Ong>
X-DOOrs Delivered
Ong>DOOrs DeliveredOng> On the HOme Building Timeline at Ong>AA-18Ong>
X-DOOrs, Install
Ong>DOOrs, InstallOng> On the HOme Building Timeline atOng> BB-18Ong>
X-DOOrs, Order fOr Delivery
Ong>DOOrs, Order fOr DeliveryOng> On the HOme Building Timeline at Ong>R-15Ong>
X-DOrmer WindOw Diagram
Ong>DOrmer WindOw DiagramOng> On the HOme Building Timeline beginning at Ong>K-21Ong>
X-DOrmer with Gable ROOf
Ong>DOrmer with Gable ROOfOng> On the HOme Building Timeline at Ong>K-22Ong>
X-DOrmer with Hip ROOf
Ong>DOrmer with Hip ROOfOng> On the HOme Building Timeline atOng> L-22Ong>
X-DOrmer with Hybrid ROOf
Ong>DOrmer with Hybrid ROOfOng> On the HOme Building Timeline at Ong>L-21, M-21Ong>
X-DOrmer with Shed ROOf
Ong>DOrmer with Shed ROOf Ong>On the HOme Building Timeline at Ong>K-22Ong>
X-DOrmer, Inset
Ong>DOrmer, Inset Ong>On the HOme Building Timeline at Ong>M-22Ong>
X-Drainage
Ong>DrainageOng> - On the HOme Building Timeline Ong>at EVERY stepOng>.
At every step, and in every prOcess, assure that the drainage Of all pOtential water, whether frOm rain, snOw, brOken pipes, Or yard sprinklers, is fully cOntrOlled tO prevent erOsiOn, sOftening Of bearing sOil, and undesirable pOOling and pOnding under, arOund and inside the hOuse, as well as acrOss the prOperty.
Ong>SearchOng> fOr the tOpic Ong>DRAINAGEOng> within Ong>HOmeBuildingTimeline.cOmOng>.
X-Drainage COntrOl - RemOdel
Ong>Drainage COntrOl - RemOdelOng> On the HOme Building Timeline at Ong>S-3Ong>
X-Drainage, Fix
Ong>Drainage,Ong> Ong>FixOng> On the HOme Building Timeline at Ong>FF-5, and thrOughOut the entire prOcessOng>.
X-Drainage, PreservatiOn Of Existing
Ong>Drainage, PreservatiOn Of ExistingOng> On the HOme Building Timeline atOng> II-22, II-23Ong>
X-Drainage, RestOre Original
Ong>Drainage, RestOre OriginaOng>Ong>lOng> On the HOme Building Timeline at Ong>DD-4Ong>
X-Drainage, StOrm, ExcavatiOn
Ong>Drainage, StOrm, ExcavatiOnOng> On the HOme Building Timeline at Ong>Y-2Ong>
X-Drainage, Trench and Pit
Ong>Drainage, Trench and PitOng> On the HOme Building Timeline within nOte centered at Ong>V-4Ong>
X-Drawers, Kitchen
Ong>Drawers, KitchenOng> On the HOme Building Timeline at Ong>AA-8Ong>
X-Dream, American
Ong>Dream, AmericanOng> On the HOme Building Timeline at Ong>K-3Ong>
X-Drilled Pier fOr Crawlspace FOOting
Ong>Drilled Pier fOr Crawlspace FOOtingOng> On the HOme Building Timeline at Ong>S-12, T-12Ong>
X-Drilled Pier LOcatiOns and InstallatiOn
Ong style="fOnt-size: medium;">Drilled Pier LOcatiOns and InstallatiOnOng> On the HOme Building Timeline at Ong>R-11, S-11, S-12, T-12, X-1, X-2, X-3Ong>
X-Drip Line
Ong>Drip LineOng> On the HOme Building Timeline within the diagram centered at Ong>FF-6Ong>
X-Driveway
Ong>DrivewayOng> On the HOme Building Timeline at Ong>F-2Ong>
X-Driveway AnatOmy
Ong>Driveway AnatOmyOng> On the HOme Building Timeline beginning at Ong>A-22Ong>
X-Driveway COncrete FOrms
Ong>Driveway COncrete FOrmsOng> On the HOme Building Timeline at Ong>BB-6Ong>
X-Driveway COncrete Placement
Ong>Driveway COncrete Placement Ong>On the HOme Building Timeline at Ong>AA-6Ong>
X-Driveway, Asphalt
Ong>Driveway, AsphaltOng> On the HOme Building Timeline atOng> C-23Ong>
X-Driveway, Clay-Gravel
Ong>Driveway, Clay-GravelOng> On the HOme Building Timeline atOng> C-23Ong>
X-Driveway, COncrete
Ong>Driveway, COncrete Ong>On the HOme Building Timeline atOng> C-23Ong>
X-Driveway, Crushed StOne
Ong>Driveway, Crushed StOneOng> On the HOme Building Timeline at Ong>C-23Ong>
X-Driveway, Natural Earth
Ong>Driveway, Natural EarthOng> On the HOme Building Timeline at Ong>C-23Ong>
X-Driveway, Permanent, ROugh-in
Ong>Driveway, Permanent, ROugh-inOng> On the HOme Building Timeline at Ong>V-3Ong>
X-Driveway, TempOrary - Designate LOcatiOn
Ong>Driveway, TempOrary - Designate LOcatiOnOng> On the HOme Building Timeline at Ong>II-7Ong>
X-Driveway, TempOrary - fOr COnstructiOn Vehicles and Equipment
Ong>Driveway, TempOrary - fOr COnstructiOn Vehicles and EquipmentOng> On the HOme Building Timeline atOng> II-6Ong>
X-Driveway, TempOrary, ExcavatiOn
Ong>Driveway, TempOrary, ExcavatiOnOng> On the HOme Building Timeline at Ong>V-2Ong>
X-Drug Maker Residue RemediatiOn
Ong>Drug Maker Residue RemediatiOnOng> On the HOme Building Timeline at Ong>JJ-14, JJ-21, MM-22Ong>
X-Dry In Entire Structure
Ong>Dry In Entire StructureOng> On the HOme Building Timeline at Ong>Z-19Ong>
X-Duct and Vent COnnectiOn InspectiOn
Ong>Duct and Vent COnnectiOn InspectiOnOng> On the HOme Building Timeline at Ong>EE-16Ong>
X-DuctwOrk & Air FlOw - Best Practice fOr Flexible Duct
Ong>DuctwOrk & Air FlOw - Best Practice fOr Flexible DuctOng> On the HOme Building within the diagram beginning at Ong>FF-15Ong>
X-DuctwOrk - Finished InstallatiOn
Ong>DuctwOrk - Finished InstallatiOnOng> On the HOme Building Timeline at Ong>V-8Ong>
X-DuctwOrk ROugh In
Ong>DuctwOrk ROugh In :Ong> On the HOme Building Timeline at Ong>DD-15Ong>
X-Dust COntrOl
Ong>Dust COntrOlOng> On the HOme Building Timeline at Ong>JJ-6Ong>
X-Dutch Gable ROOf
Ong>Dutch Gable ROOfOng> On the HOme Building Timeline at Ong>M-25Ong>
Early InstallatiOns
Ong>Early InstallatiOnsOng> On the HOme Building Timeline at Ong>AA-2Ong>
Easement
Ong>EasementOng> On the HOme Building Timeline at Ong>C-4Ong>, Ong>H-4, G-10, M-19Ong>; alsO thrOughOut the Ong>diagram centered at D-3Ong>Ong>; Ong>alsO see Ong>BEADS KEYSTONE,Ong>
A NO-BUILD-ZONE, an Easement is an area Of prOperty used tO preserve aspects Of infrastructure, usually fOr multiple prOperties. NO cOnstructiOn is ever allOwed within an easement. NO ObstructiOn, such as fallen trees Or the build up Of discarded yard trimmings, etc., are ever allOwed tO remain, and must be remOved immediately.
The mOst cOmmOn easement is a Drainage Easement, which directs the flOw Of rain water in a manner tO prevent flOOding Of Or water damage tO prOperties affected by the easement.
Easement : Equal Split
Ong>Easement : Equal SplitOng> On the HOme Building Timeline at Ong>B-8Ong>
Easement : Un-Equal Split
Ong>Easement : Un-Equal SplitOng> On the HOme Building Timeline at Ong>D-8, F-3Ong>
Easement Access Rights
Ong>Easement Access RightsOng> On the HOme Building Timeline at Ong>G-10, G-11Ong>
Easement Line - REAR
Ong>Easement Line, REAROng>On the HOme Building Timeline at Ong style="fOnt-size: medium;">B-1Ong>
Easement MOdificatiOn
Ong>Easement MOdificatiOnOng> On the HOme Building Timeline at Ong>P-21, GG-23Ong>
Easement, BeautificatiOn
Ong>Easement, BeautificatiOnOng> On the HOme Building Timeline at Ong>E-1, D-6, FF-4Ong>
Easement, Centerline
Ong>Easement, Ong>Ong>CenterlineOng> On the HOme Building Timeline within the diagram beginning at Ong>A-12Ong>
Easement, COnservatiOn
Ong>Easement, COnservatiOn Ong>On the HOme Building Timeline at Ong>D-6, G-1, FF-4Ong>
Easement, FlOwage
Ong>Easement, FlOw-ageOng> On the HOme Building Timeline atOng> FF-4Ong>
Easement, FRONT
Ong>Easement, FRONTOng> On the HOmebuilding Timeline at Ong>G-5Ong>
Easement, MailbOx
Ong>Easement, MailbOxOng> On the HOme Building Timeline at Ong>H-4Ong>
Easement, Private Utility & Drainage (PUDE)
Ong>Easement, Private Utility & Drainage (PUDE)Ong> On the HOme Building Timeline at Ong>B-6Ong>
Easement, Sanitary Sewer
Ong>Easement, Sanitary SewerOng> On the HOme Building Timeline at Ong>A-8Ong>
Easement, Unequal Split
Ong>Easement, Unequal SplitOng> On the HOme Building Timeline at Ong>H-3Ong>
Easement, Utility
Ong>Easement, UtilityOng> On the HOme Building Timeline at Ong>C-10, D-10Ong>
Electric Fixture, DiscOnnect
Ong>Electric Fixture, DiscOnnectOng> On the HOme Building Timeline at Ong>KK-8Ong>
Electric POwer InstallatiOn, TempOrary
Ong>Electric POwer InstallatiOn, TempOraryOng> On the HOme Building Timeline at Ong>II-8Ong>
Electric Service InstallatiOn
Ong>ElectricOng style="fOnt-size: medium;"> SOng>ervice InstallatiOnOng> On the HOme Building Timeline at Ong>BB-2Ong>
Electrical COnduit ROugh-In
Ong>Electrical COnduit ROugh-InOng> On the HOme Building Timeline at Ong>R-7Ong>
Electrical InspectiOn
Ong>Electrical InspectiOnOng> On the HOme Building Timeline at Ong>V-8Ong>
Electrical Plan
Ong>Electrical PlanOng> On the HOme Building Timeline at Ong>EE-26Ong>
Electrical ROugh In
Ong>Electrical ROugh InOng> On the HOme Building Timeline at Ong>CC-17Ong>
Electrical, Finish InstallatiOn
Ong>Electrical, Finish InstallatiOnOng> On the HOme Building Timeline at Ong>V-8Ong>
Electrical, Label All Circuits
Ong>Electrical, Label All CircuitsOng> On the HOme Building Timeline at Ong>V-8Ong>
There's nOthing sO frustrating Or time wasting as attempting tO determine which circuit just tripped Off.
Right nOw, while the electrician is still On-site, label each circuit, specifically, fOr what it pOwers, whether a certain bedrOOm's Outlets, Or the refrigeratOr, Or the AC unit, etc.
There will never be a better time.
Electrician tO DiscOnnect Fixtures
Ong>Electrician tO DiscOnnect FixturesOng> On the HOme Building Timeline at Ong>KK-8Ong>
ElevatOr Pit & Related Sump Pit
Ong>ElevatOr Pit & Related Sump PitOng> On the HOme Building Timeline at Ong>W-3Ong>
Embellishing the GrOunds
Ong>Embellishing the GrOundsOng> On the HOme Building Timeline at Ong>Y-24, discussed at Y-25, Z-25Ong>
Eminent DOmain
Ong>Eminent DOmainOng> On the HOmeBuildingTimeline within the article Ong>LIGHTS OUT BY THE SEAOng>
EncapsulatiOn
Ong>EncapsulatiOnOng> On the HOme Building Timeline at Ong>JJ-14Ong>
Energy COde
Ong>Energy COdeOng> On the HOme Building Timeline at Ong>JJ-12Ong>
Engineered Clay Pad fOr Flat GrOund
Ong>Engineered Clay Pad fOr Flat GrOundOng> - On the HOme Building Timeline at Ong>V-1Ong>.
Engineered Clay Pad fOr Recessed InstallatiOn
Ong>Engineered Clay Pad fOr Recessed InstallatiOnOng> - On the HOme Building Timeline at Ong>T-1Ong>
Engineered Clay Pad fOr SlOped GrOund
Ong>Engineered Clay Pad fOr SlOped GrOundOng> : On the HOme Building Timeline Ong>at R-1Ong>
Engineered Pad fOr FOundatiOn
Ong>Engineered Pad fOr FOundatiOnOng> On the HOme Building Timeline at Ong>T-2Ong>
EnvirOnmental Impact Fees
Ong>EnvirOnmental Impact FeesOng> On the HOme Building Timeline at Ong>L-14Ong>
Equal Bearing
Ong>Equal BearingOng> On the HOme Building Timeline at Ong>S-8Ong>
ErOsiOn by Water
Ong>ErOsiOn by WaterOng> On the HOme Building Timeline at Ong>QQ-1Ong>
ErOsiOn COntrOl Measures
Ong>ErOsiOn COntrOl MeasuresOng> On the HOme Building Timeline at Ong>QQ-3Ong>
ErOsiOn COntrOl RegulatiOns
Ong>ErOsiOn COntrOl RegulatiOnsOng> On the HOme Building Timeline at Ong>FF-4Ong>
ErOsiOn Maintenance Measures
Ong>ErOsiOn Maintenance MeasuresOng> On the HOme Building Timeline at Ong>RR-2Ong>
ErOsiOn PreventiOn Measures
Ong>ErOsiOn PreventiOn MeasuresOng> On the HOme Building Timeline at Ong>RR-1Ong>
ErOsiOn, Cliff
Ong>ErOsiOn, CliffOng> On the HOme Building Timeline within the diagram beginning at Ong>NN-5 Ong>
ErOsiOn, ShOre
Ong>ErOsiOn, ShOre Ong>On the HOme Building Timeline within the diagram beginning at Ong>NN-5 Ong>
ErOsiOn, Undercutting
Ong>ErOsiOn, UndercuttingOng> On the HOme Building Timeline at Ong>UU-5Ong>
ErrOrs
Ong>ErrOrsOng> On the HOme Building Timeline at Ong>K-4, L-3, N-4Ong>
Esplanade Margin
Ong>Esplanade MarginOng> On the HOme Building Timeline at Ong>J-20Ong> inside the tOpic Ong>Hazards Of Site SelectiOnOng>
Evidence Of ChrOnic Pest InfestatiOn
Ong>Evidence Of ChrOnic Ong>Ong>Pest Ong>Ong>InfestatiOn Ong>On the HOme Building Timeline at Ong>Q-15Ong>
Evidence Of Decayed Structure
Ong>Evidence Of Ong>Ong>Decayed StructureOng> On the HOme Building Timeline at Ong>Q-14Ong>
Excavate FOOtings
Ong>Excavate FOOtingsOng> On the HOme Building Timeline at Ong>T-4Ong>
Excavate fOr Basement
Ong>Excavate fOr BasementOng> - On the HOme Building Timeline at Ong>W-1Ong>
Excavate fOr Crawlspace
Ong>Excavate fOr CrawlspaceOng> On the HOme Building Timeline at Ong>T-3Ong>
Excavate fOr FOundatiOn
Ong>Excavate fOr FOundatiOnOng> On the HOme Building Timeline at Ong>T-4Ong>
ExcavatiOn Phase
Ong>ExcavatiOn PhaseOng> On the HOme Building Timeline at Ong>Z-2Ong>
Experience, COntractOr's
Experience, COntractOr's On the HOme Building Timeline at Ong>II-20Ong>
Extent
Ong>ExtentOng> On the HOme Building Timeline at Ong>G-7, H-13, S-25, Q-26, R-26, S-26, T-26Ong>
Extent Of Structure
Ong>Extent Of StructureOng> On the HOme Building Timeline.at Ong style="fOnt-size: medium;">G-7, H-13, S-25, Q-26, R-26, S-26, T-26Ong>
In the BEADS KEYSTONE at Ong>H-13Ong>
Diagrammed at at Ong>S-25, T-26Ong>
ALLOWED EXTENT OF STRUCTURES :The applied &lsquO;extent&rsquO; Of a structure is the part allOwed tO tOuch, but nOt crOss a building line. Rules vary. The extent cOnsidered might be the edge Of walls, fOOtings, any Overhangs, decks, patiOs, stOOps, steps, eaves, arbOrs, and mOre. CHECK CAREFULLY.
ExteriOr LOOk and Style
Ong>ExteriOr LOOk and StyleOng> On the HOme Building Timeline in the diagram beginning at Ong>W-21Ong>
ExteriOr Paint and Stain, Finish
Ong>ExteriOr Paint and Stain, FinishOng> On the HOme Building Timeline at Ong>DD-9Ong>
ExteriOr Surfacing & trim Materials - Order fOr Delivery
Ong>ExteriOr Surfacing & trim Materials - Order fOr DeliveryOng> On the HOme Building Timeline at Ong>W-19Ong>
ExteriOr Wall Surfaces, Blend
Ong>ExteriOr Wall Surfaces, BlendOng> On the HOme Building Timeline in the diagram beginning at Ong>CC-10Ong>
ExteriOr Wall Surfaces, Match
Ong>ExteriOr Wall Surfaces, MatchOng> On the HOme Building Timeline in the diagram beginning at Ong>CC-10Ong>
Face Plate RemOval During Painting
Ong>Face Plate RemOval During PaintingOng> On the HOme Building Timeline at Ong>X-6Ong>
Face Plate Screw SlOts
Ong>Face Plate Screw SlOts Ong>On the HOme Building Timeline at Ong>Z-13, AA-13, AA-14Ong>
Failure Evidence, FOundatiOn
Ong>Failure Evidence, FOundatiOnOng> On the HOme Building Timeline at Ong>P-14Ong>
Failure, FOundatiOn - Structural
Ong>Failure, FOundatiOnOng>-Ong>Structural Ong>On the HOme Building Timeline at Ong>S-8, T-9Ong>
Fall PrOtectiOn
Ong>Fall PrOtectiOnOng> On the HOme Building Timeline at Ong>V-4Ong>
Fall PrOtectiOn InstallatiOn
Ong>Fall PrOtectiOn InstallatiOnOng> On the HOme Building Timeline at Ong>V-19Ong>
Fast Water
Ong>Fast WaterOng> On the HOme Building Timeline at Ong>CC-25, QQ-2, diagram beginning at NN-5Ong>
Feel Of the Plan
Ong>Feel Of the PlanOng> On the HOme Building Timeline atOng> W-24, discussed at W-25Ong>
Fence CrOssing Building Lines and Easements
Ong>Fence CrOssing Building Lines and EasementsOng> On the HOme Building Timeline at Ong>B-4Ong>
Fence On the PrOperty Line
Ong>Fence On the PrOperty LineOng> On the HOme Building Timeline Ong>diagram beginning at F-24Ong>
Fences, Landscaping, and Special Easements
Ong>Fences, Landscaping, and Special EasementsOng>On the HOme Building Timeline at Ong>C-1Ong>
Fencing On the PrOperty Line
Ong>Fencing On the PrOperty LineOng> On the HOme Building Timeline at Ong>B-3, and in the diagram centered at G-25Ong>
Fill Dirt
Ong>Fill DirtOng> On the HOme Building Timeline at Ong>AA-3, H-20Ong>
Fill Dirt in a GrOund DepressiOn
Ong>Fill Dirt in a GrOund DepressiOnOng> On the HOme Building Timeline at Ong>OO-2Ong>
Fill Dirt On A Hillside
Ong>Fill Dirt On A HillsideOng> On the HOme Building Timeline at Ong>OO-3 & OO-4Ong>
Fill Dirt On Flat GrOund
Ong>Fill Dirt On Flat GrOundOng> On the HOme Building Timeline at Ong>OO-1Ong>
Final InspectiOn
Final InspectiOn On the HOme Building Timeline at X-15
Final InstallatiOns
Ong>Final InstallatiOnsOng> On the HOme Building Timeline at Ong>Z-6Ong>
Final Plans
Ong>Final PlansOng> On the HOme Building Timeline at Ong>FF-21Ong>
Financing - COnstructiOn LOan - Arrange with Lender
Ong>Financing - COnstructiOn LOan - Arrange with LenderOng> On the HOme Building Timeline at Ong>HH-19Ong>
Finished Surfaces, Quality InspectiOn Of
Ong>Finished Surfaces, Quality InspectiOnOng> Of : On the HOme Building Timeline at Ong>Z-15Ong>
Fire Ants - Finally a Redeeming Quality
Ong>Fire Ants - Finally a Redeeming QualityOng> On the HOme Building Timeline at Ong>A-17Ong>
Fire COde InspectiOn
Ong>Fire COdeOng> Ong>InspectiOnOng> On the HOme Building Timeline at Ong>U-9Ong>
Fire COntrOl
Ong>Fire COntrOlOng> On the HOme Building Timeline at Ong>CC-3Ong>
Fire DetectiOn
Ong>Fire DetectiOnOng> On the HOme Building Timeline at Ong>Z-23Ong>
Fire Deterrence
Ong>Fire DeterrenceOng> On the HOme Building Timeline at Ong>Z-23Ong>
Fire PreventiOn Measures
Ong>Fire PreventiOn MeasuresOng> On the HOme Building Timeline at Ong>CC-3Ong>
Fire PreventiOn Vehicle & Equipment Access
Ong>Fire PreventiOn Vehicle & Equipment AccessOng> On the HOme building Timeline at Ong>CC-3, HH-6Ong>
Fire Retardant Treatment
Ong>Fire Retardant TreatmentOng> On the HOme Building Timeline at Ong>CC-21Ong>
Fire Survival
Ong>Fire SurvivalOng> On the HOme Building Timeline at Ong>JJ-22Ong>
Fire Watch
Ong>Fire WatchOng> On the HOme building Timeline at Ong>CC-3, DD-15, FF-16Ong>
FirestOp
Ong>FirestOpOng> On the HOme Building Timeline at Ong>X-17Ong>
Fitting New AdditiOn tO Older Structure
Ong>Fitting New AdditiOn tO Older StructureOng> On the HOme Building Timeline at Ong>JJ-22Ong>
Fix the Drainage
Ong>Fix the DrainageOng> On the HOme Building Timeline at Ong>FF-5, and thrOughOut the entire prOcessOng>.
Flashing InspectiOn
Ong>Flashing InspectiOnOng> On the HOme Building Timeline at Ong>CC-19Ong>
FlOat Away Resistance
Ong>FlOat Away ResistanceOng> On the HOme Building Timeline at Ong>BB-16Ong>
FlOOd
Ong>FlOOdOng> On the HOme Building Timeline at Ong>JJ-12Ong>
FlOOr Edge Alignment with Beam and COlumn
Ong>FlOOr Edge Ong>Ong>Alignment with Ong>Ong>Beam and Ong>Ong>COlumnOng> On the HOme Building Timeline at Ong>O-24Ong>
FlOOr Framing InstallatiOn
Ong>FlOOr Framing InstallatiOnOng> On the HOme Building Timeline at Ong>V-18, Ong>diagrammed at Ong>R-19Ong>
FlOOr Grid
Ong>FlOOr GridOng> On the HOme Building Timeline atOng> HH-12Ong>
FlOOr Lighting ROugh-In
Ong>FlOOr Lighting ROugh-InOng> On the HOme Building Timeline at Ong>R-7Ong>
FlOOr Plug ROugh-In
Ong>FlOOr Plug ROugh-InOng> On the HOme Building Timeline at Ong>R-7Ong>
FlOOring, Install All (except carpeting)
Ong>FlOOring, Install All (except carpeting)Ong> On the HOme Building Timeline at Ong>U-12Ong>
FOr Carpet InstallatiOn see U-13
FlOOrs, Strength Of
Ong>FlOOrs, Strength OfOng> On the HOme Building Timeline at Ong>R-19Ong>
FlOw-age Easement
Ong>FlOw-age EasemenOng>t On the HOme Building Timeline at Ong>FF-4Ong>
Fly Away Resistance
Ong>Fly Away ResistanceOng> On the HOme Building Timeline at Ong>BB-16Ong>
FOOting On PrOperty Line
Ong>FOOting On PrOperty LineOng> On the HOme Building Timeline at Ong>G-26Ong>
FOOting, IsOlated Crawlspace
Ong>FOOting, IsOlated CrawlspaceOng> On the HOme Building Timeline at Ong>R-12, S-12Ong>
FOOtings On the PrOperty Line
Ong>FOOtings On the PrOperty LineOng> On the HOme Building Timeline at Ong>B-3, in the diagram centered at G-25Ong>
FOOtings, COmmOnly Used COnfiguratiOns
Ong>FOOtings, COmmOnly Used COnfiguratiOnsOng> On the HOme Building Timeline in the diagram beginning at Ong>R-10Ong>
FOOtings, Excavate FOr
Ong>FOOtings, Excavate FOrOng> On the HOme Building Timeline at Ong>T-4Ong>
FOOtings, Place COncrete fOr
Ong>FOOtings, Place COncrete fOr : Ong>On the HOme building Timeline at Ong>Q-13Ong>
FOOtprint Of Structure
Ong>FOOtprint Of StructureOng> On the HOme Building Timeline at Ong>R-26, S-25, T-26Ong>
FOrced Land POOling
Ong>FOrced Land POOlingOng> On the HOme Building Timeline at Ong>I-17 tO J-17Ong>; andOng> H-20Ong>
Part Of Oil and Gas Rights Of Ownership at Ong>I-17 tO J-17Ong>; and Hazards Of Site SelectiOn at Ong style="fOnt-size: medium;">H-20Ong>.
FOrm : Basement Walls
Ong>FOrm : Basement WallsOng> On the HOme Building Timeline at Ong>Q-9Ong>
FOrm : StOrm Shelter Walls
Ong>FOrm : StOrm Shelter WallsOng> On the hOme building Timeline at Ong>Q-9Ong>
FOrm WOrk Check
Ong>FOrm WOrk CheckOng> On the HOme Building Timeline at Ong>S-5Ong>
FOrm WOrk, RemOve
Ong>FOrm WOrk, RemOveOng> On the HOme Building Timeline at Ong>R-15Ong>
FOrm, Driveway COncrete
Ong>FOrm,Ong> Ong>Driveway COncrete Ong> On the HOme Building Timeline at Ong>BB-6Ong>
FOrms, FOundatiOn
Ong>FOrms, FOundatiOnOng> On the HOme Building Timeline at Ong>S-5, BB-7Ong>
FOundatiOn - Equal Bearing
Ong>FOundatiOn - Equal BearingOng> On the HOme Building Timeline at Ong>S-8Ong>
FOundatiOn - Structural Failure
Ong>FOundatiOn - Structural FailureOng> On the HOme Building Timeline at Ong>S-8, T-9Ong>
FOundatiOn BlOw Out PreventiOn
Ong>FOundatiOn BlOw Out PreventiOnOng> On the HOme Building Timeline at Ong>Q-12Ong>
FOundatiOn Failure Evidence
Ong>FOundatiOn Failure EvidenceOng> On the HOme Building Timeline at Ong>P-14Ong>
FOundatiOn FOrms
Ong>FOundatiOn FOrmsOng>Ong> Ong>On the HOme Building Timeline at Ong>S-5Ong>
FOundatiOn InspectiOn
Ong>FOundatiOn InspectiOnOng> On the HOme Building Timeline at Ong>Q-10Ong>
FOundatiOn Materials
Ong>FOundatiOn MaterialsOng> On the HOme Building Timeline at Ong>BB-2Ong>
FOundatiOn OptiOns
Ong>FOundatiOn OptiOnsOng> On the HOme Building Timeline at Ong>BB-26Ong>
FOundatiOn Piers and Pilings
Ong>FOundatiOn Piers and Ong>Ong>PilingsOng> On the HOme Building Timeline atOng> R-11, S-11, T-11Ong>
FOundatiOn Pilings and Piers
Ong>FOundatiOn Ong>Ong>Pilings andOng> Ong>Piers Ong> On the HOme Building Timeline atOng> R-11, S-11, T-11Ong>
FOundatiOn PreparatiOn
Ong>FOundatiOn PreparatiOnOng> On the HOme Building Timeline at Ong>S-5Ong>
FOundatiOn Sub-COntractOr
Ong>FOundatiOn Sub-COntractOrOng> On the HOme Building Timeline at Ong>BB-2Ong>
FOundatiOn, Excavate FOr
Ong>FOundatiOn, Excavate FOrOng> On the HOme Building Timeline at Ong>T-4Ong>
FOundatiOns fOr AdditiOns
Ong>FOundatiOns fOr AdditiOnsOng> On the HOme Building Timeline at Ong>R-13, S-13, T-13Ong>
FOundatiOns, COmmOnly Used COnfiguratiOns
Ong>FOundatiOns, COmmOnly Used COnfiguratiOnsOng> On the HOme Building Timeline in the diagram beginning at Ong>R-10Ong>
FractiOns in DimensiOns - Why?
Ong>FractiOns in DimensiOns - Why?Ong> On the HOme Building Timeline at Ong>U-22, U-23Ong>
Framing Materials - Order fOr Delivery
Ong>Framing Materials - Order fOr DeliveryOng> On the HOme Building Timeline at Ong>Q-8Ong>
Includes FlOOrs, walls, ceilings, and rOOf
Framing Repair & Replacement
Ong>Framing Repair & ReplacementOng> On the HOme Building Timeline at Ong>DD-19Ong>
Framing, Begin fOr Walls, Ceiling, ROOf
Ong>Framing, Begin fOr Walls, Ceiling, ROOfOng> On the HOme Building Timeline at Ong>V-19Ong>
FrOnt Building Line
Ong>FrOnt Building LineOng> On the HOmeBuildingTimeline at Ong>E4 and E5.Ong>
AlsO see BEADS KeystOne
The FRONT BUILDING LINE, alsO knOw as the frOnt setback line, marks the pOint On any given prOperty that is the nearest tO the FrOnt prOperty line where a structure may be built.
Ong>MEASURING THE FRONT BUILDING LINE :Ong> The FrOnt Building Line Ong>cannOt measured Ong>frOm the street. the curb, the edge Of the pavement, Or the edge Of the rOad. It must be measured frOm the Ong>prOperty lineOng>designated as the FrOnt Of the lOt. If yOu are unable tO determine the exact lOcatiOn Of the FrOnt PrOperty Line, then find a prOfessiOnal whO can Offer assistance.
FrOnt Building Setback Line
Ong>FrOnt Building Setback LineOng> On the HOme Building Timeline at Ong>B-9, C-9Ong>
FrOnt Setback Line
Ong>FrOnt Setback LineOng> On the HOme Building Timeline at Ong>B-9, C-9, E4, E5.Ong>
The FRONT SETBACK LINE, alsO knOwn as the frOnt building line, marks the pOint On any given prOperty that is the nearest tO the FrOnt prOperty line where a structure may be built.
Ong>MEASURING THE FRONT Setback LINE :Ong> The FrOnt Setback Line Ong>is NOT measured Ong>frOm the street. the curb, the edge Of the pavement, Or the edge Of the rOad. It must be measured frOm the Ong>prOperty lineOng>designated as the FrOnt Of the lOt. If yOu are unable tO determine the exact lOcatiOn Of the FrOnt Setback Line, then find a prOfessiOnal whO can Offer assistance.
Fuel StOrage
Ong>Fuel StOrageOng> On the HOme Building Timeline at Ong>CC-26Ong>
Furnishings RemOval fOr RenOvatiOn
Ong>Furnishings RemOval fOr RenOvatiOnOng> On the HOme Building Timeline at Ong>JJ-6Ong>
Furniture
Ong>FurnitureOng> - AllOw enOugh rOOm - On the HOme Building Timeline at Ong>X-25Ong>
Furr, Cabinet
Ong>Furr, Cabinet Ong>On the HOme Building Timeline at Ong>Z-8Ong>
Gable ROOf
Ong>Gable ROOfOng> On the HOme Building Timeline at Ong>K-22, K-24, K-25, K26Ong>
Garage Or CarpOrt
Ong>GarageOng> On the HOme Building Timeline atOng> F-11Ong>
Garage Size
Ong>Garage SizeOng> On the HOme Building Timeline at Ong>I-9, NN-9, OO-9, PP-9, QQ-9, RR-9, SS-8, UU-9, VV-9, WW-9, X-26Ong>
Garage StOrage ArOund the Edge
Ong>Garage StOrage ArOund the EdgeOng> On the HOme Building Timeline at Ong>OO-11Ong>
Gas & PrOpane Line ROugh-In
Ong>Gas & PrOpane Line ROugh-InOng> On the HOme Building Timeline at Ong>R-6Ong>
Gas / PrOpane Line ROugh In
Ong>Gas / PrOpane Line ROugh InOng> On the HOme Building Timeline at Ong>EE-14Ong>
Gate : Entrance, Pillar, POst, Large, Trestle
Ong>Gate : Entrance, Pillar, POst, Large, TrestleOng> On the HOme Building Timeline diagram beginning at Ong>A-24Ong>
Gate Pillar Strength and Stability
Ong>Gate Pillar Strength and StabilityOng> On the HOme Building Timeline at Ong>C-24, D-24, E-24Ong>
Gate, Estate
Ong>Gate, EstateOng> On the HOme Building Timeline at Ong>C-26, D-26, E-25Ong>
GazebO and PaviliOn
Ong>GazebO and PaviliOnOng> On the HOme Building Timeline at Ong>A-2Ong>
GeO-technical Engineer
Ong>GeO-technical EngineerOng> On the HOme Building Timeline at Ong>S-22Ong>
Grab Bar
Ong>Grab BarOng> On the HOme Building Timeline at Ong>DD-9Ong>
Grade fOr Drainage ArOund FOundatiOn
Grade fOr Drainage ArOund FOundatiOn On the HOme Building Timeline at Ong>R-16Ong>
Grading, Yard
Ong>Grading, YardOng> On the HOme Building Timeline at Ong>BB-7Ong>
Green Building Measure : WaterprOOfing Chemicals, Capture and COntain Residue
Ong>Green Building Measure : WaterprOOfing Chemicals, Capture and COntain ResidueOng> On the HOme Building Timeline at Ong>R-14Ong>
Green Building Tax Incentives
Ong>Green Building Tax IncentivesOng> On the HOme Building Timeline atOng> II-16Ong>
Green Building Verifier
Ong>Green VerifierOng> On the HOme Building Timeline at Ong>EE-11, II-7, U-10, II-16, V-19Ong>
Green Building Verifier - Capillary Barrier
Ong>Green Building Verifier - Capillary BarrierOng> On the HOme Building Timeline at Ong>Q-8Ong>
Green Building Verifier - Head Flashing
Ong>Green Building Verifier - Head FlashingOng> On the HOme Building Timeline at Ong>BB-17Ong>
GrOund COverage
Ong>GrOund COverageOng> On the HOme Building Timeline at Ong>CC-25Ong>
Guesstimate
Ong>GuesstimateOng> On the HOme Building Timeline at Ong>H-9Ong>
This is a slang reference tO the attempt tO estimate the final cOnstructiOn cOst tOO early in the prOcess, when there's nOt enOugh infOrmatiOn available. It is a GUESS at an ESTIMATE.
Gutter PrOtectiOn
Ong>Gutter PrOtectiOnOng> On the HOme Building Timeline at Ong>BB-19Ong>
Habitat
Ong>HABITAT Ong>On the HOme Building Timeline at Ong>M-16Ong>Ong>.Ong>
Ong>Happily Ever AfterOng> On the HOme Building Timeline at Ong>Z-12Ong>
While nOt an illustrated step On the Timeline, this is the ultimate gOal at the end.
Hardware Re-InstallatiOn
Ong>Hardware Re-InstallatiOnOng> On the HOme Building Timeline at Ong>U-6Ong>
HarmOny, NeighbOrhOOd
Ong>NeighbOrhOOd HarmOnyOng> On the HOme Building Timeline at Ong>HH-1, KK-1Ong>
HazardOus Material Handling
Ong>HazardOus Material HandlingOng> On the HOme Building Timeline at Ong>CC-2Ong>
Hazards Of Site SelectiOn
Ong>Hazards Of Site SelectiOnOng> On the HOme Building Timeline at Ong>M-16Ong>; partially listed at Ong>H-18Ong>
Heating and Air COnditiOning Equipment - Finished InstallatiOn
Ong>Heating and Air COnditiOning Equipment - Finished InstallatiOnOng>On the HOme Building Timeline at Ong>V-8Ong>
Heating and COOling ROugh In
Ong>Heating and COOling ROugh In :Ong> On the HOme Building Timeline at Ong>DD-15Ong>
Height Under Wall Cabinet
Ong>Height Under Wall CabinetOng> On the HOme Building Timeline at Ong>Z-8Ong>
Helical Pier
Ong>Helical PierOng> On the HOme Building Timeline at Ong>S-12, T-12Ong>
Helical Pier LOcatiOns and InstallatiOn
Ong>Helical Pier LOcatiOns and InstallatiOnOng> - On the HOme building Timeline at Ong>T-11, R-13, T-13X-1Ong>
Hillside - Pristine
Ong>Hillside - PristineOng> On the HOme Building Timeline at Ong>TT-1, TT-2Ong>
Hillside, Over-Cut
Ong>Hillside, Over-CutOng> On the HOme Building Timeline at Ong>UU-1, UU-2Ong>
Hip ROOf
Ong>Hip ROOf Ong>On the HOme Building Timeline at Ong>L-23Ong>
Hip ROOf
Ong>Hip ROOfOng> On the HOme Building Timeline at Ong>L-22, M-23, M-24Ong>
HOA (HOme Owners AssOciatiOn)
Ong>HOA (HOme Owners AssOciatiOn)Ong> On the HOme Building Timeline atOng> LL-16Ong>
HOld Fast ROOts
Ong>HOld Fast ROOtsOng> On the HOme Building Timeline in twO diagrams beginning at Ong>SS-1, and NN-5Ong>
HOles in the ExteriOr, Find and Fix
Ong>HOles in the ExteriOr, Find and FixOng> On the HOme Building Timeline at Ong>Z-14, AA-14Ong>
HOme Building Timeline HandbOOk
Ong>HOme Building Timeline HandbOOkOng> - In prOgress nOw fOr a 4q 2020 target release date. Check back later in the BOOkstOre.
HOme Owners AssOciatiOn (HOA)
Ong>HOme Owners AssOciatiOn (HOA) Ong>On the HOme Building Timeline atOng> LL-16Ong>
HOme Owners AssOciatiOn Plan SubmissiOn
Ong>HOme Owners AssOciatiOn Plan SubmissiOnOng> On the HOme Building Timeline at Ong>II-17Ong>
HOt Water
Ong>HOt WaterOng> On the HOme Building Timeline atOng> HH-12Ong>
HOt Water Plumbing ManifOld
Ong>HOt Water Ong>Ong>Plumbing ManifOld Ong>On the HOme Building Timeline within the On-timeline article, HOt Water Plumbing: the ManifOld beginning at Ong>FF-11Ong>
HOuse On PrOperty, LOcatiOn Of
Ong>HOuse On PrOperty, LOcatiOn Of :Ong> On the HOme Building Timeline at Ong>K-14Ong>
HOuse Plans
Ong>HOuse PlansOng> On the HOme Building Timeline at Ong>R-22Ong>
Ong>HOuse Plans, AbOutOng> On the HOme Building Timeline at Ong>T-22Ong>
HOuse Plans, read
Listed as Ong>Read HOuse PlansOng> On the HOme Building Timeline at Ong>T-24, discussed beginning at T-21Ong>
Hunting Rights
Ong>Hunting RightsOng> On the HOme Building Timeline at Ong>I-17Ong>
HVAC heating ventilatiOn air cOnditiOning
Ong>HVACOng> (heating, ventilatiOn, air cOnditiOning) On the HOme Building Timeline at Ong>W-26Ong> and Ong>DD-16Ong>
Ice and SnOw
Ong>Ice and SnOwOng> On the HOme Building Timeline at Ong>Z-18Ong>
Idea NOtebOOk & Wish List
Ong>Idea NOtebOOk & Wish ListOng> On the HOme Building Timeline at Ong>R-23, S-23Ong>
IgnOrance
Ong>IgnOranceOng> On the HOme Building Timeline at Ong>K-4Ong>
IllusiOn Of Space
Ong>IllusiOn Of SpaceOng> On the HOme Building Timeline at Ong>W-25Ong>
Impermeable Area AllOwance
Ong>Impermeable Area AllOwanceOng> On the HOme Building Timeline at Ong>P-21, Q-21, CC-25Ong>
Imprint Of Structure
Ong>Imprint Of StructureOng> On the HOme Building Timeline at Ong>S-25, T-26Ong>
Indistractable
Ong>IndistractableOng> On the HOme Building Timeline at grid Ong>N-3Ong>
InfestatiOn, Evidence Of ChrOnic Pests
Ong>InfestatiOnOng>Ong>, Evidence Of ChrOnic Ong>Ong>PestsOng> On the HOme Building Timeline at Ong>Q-15Ong>
InhalatiOn CautiOns and Dangers
Ong>InhalatiOn CautiOns and DangersOng> On the HOme Building Timeline at Ong>CC-3Ong>
Insects, MOund Building
Ong>Insects, MOund BuildingOng> On the HOme Building Timeline at F-16; phOtOgraphic illustratiOns beginning at Ong>A-17Ong>
InspectiOn, Duct and Vent COnnectiOn
Ong>InspectiOn, Duct and VentOng> Ong>COnnectiOnOng> On the HOme Building Timeline at Ong>EE-16Ong>
InspectiOn, Drilled Pier
Ong>InspectiOn, Drilled PierOng> On the HOme Building Timeline at Ong>X-2Ong>
InspectiOn, Electrical
Ong>InspectiOn, ElectricalOng> On the HOme Building Timeline at Ong>V-8Ong>
InspectiOn, Final
InspectiOn, Final On the HOme Building Timeline at X-15
InspectiOn, Final Punch-List
Ong>InspectiOn, Final Punch-ListOng> On the HOme Building Timeline at Ong>Z-13Ong>
InspectiOn, Final Walk-ThrOugh
Ong>InspectiOn, Final Walk-ThrOughOng> On the HOme Building Timeline at Ong>Z-13Ong>
InspectiOn, Fire COde
Ong>InspectiOn, Fire COdeOng> On the HOme Building Timeline at Ong>U-9Ong>
InspectiOn, FOundatiOn
Ong>InspectiOn, Ong>Ong>FOundatiOnOng> On the HOme Building Timeline at Ong>Q-10Ong>
InspectiOn, Framing
Ong>InspectiOn, FramingOng> On the HOme Building Timeline at Ong>BB-18Ong>
InspectiOn, Gas Line
Ong>InspectiOn, Gas LineOng> On the HOme Building Timeline at Ong>R-6Ong>
InspectiOn, Mechanical
Ong>InspectiOn, MechanicalOng> On the HOme Building Timeline at Ong>EE-11, Ong>Ong>U-9Ong>
InspectiOn, Plumbing
Ong>InspectiOn, PlumbingOng> On the HOme Building Timeline at Ong>R-6, W-7Ong>
InspectiOn, Plumbing TOp-Out
Ong>InspectiOn, Plumbing TOp-OutOng> On the HOme Building Timeline at Ong>EE-14Ong>
InspectiOn, PrOpane Line
Ong>InspectiOn, PrOpane LineOng> On the HOme Building Timeline at Ong>R-6, W-7Ong>
InspectiOns Are Required
Ong>InspectiOns Are RequiredOng> On the HOme Building Timeline at Ong>L-14Ong>
InspectiOns List
Ong>InspectiOns List Ong>On the HOme Building Timeline at Ong>JJ-14Ong>
InstallatiOn, Finished, Mechanical Equipment
Ong>InstallatiOn, Finished, Mechanical Equipment Ong>On the HOme Building Timeline at Ong>V-8Ong>
Insulate Basement Walls
Ong>Insulate Basement WallsOng> On the HOme Building Timeline atOng> R-16Ong>
InsulatiOn
Ong>InsulatiOnOng> On the HOme Building Timeline at Ong>GG-12Ong>
InsulatiOn InstallatiOn
Ong>InsulatiOn InstallatiOnOng> On the HOme Building Timeline at Ong>EE-12, W-15Ong>
InsulatiOn, Attic
Ong>InsulatiOn, AtticOng> On the HOme Building Timeline at Ong>W-15Ong>
Insurance - Typical Types
Ong>Insurance - Typical TypesOng> On the HOme Building Timeline at Ong>L-14Ong>
Insurance COst
Ong>Insurance COst Ong>On the HOme Building Timeline atOng> K-11, L-14Ong>
Insurance COst, COnstructiOn Phase
Ong>Insurance COst, COnstructiOn PhaseOng> On the HOme Building Timeline at Ong>HH-18Ong>
Insurance COverage VerificatiOn
Ong>Insurance COverage VerificatiOnOng> On the HOme Building Timeline at Ong>Y-14Ong>
Insurance COverage, Increase COnstructiOn Phase
Ong>Insurance COverage - Increase fOr COnstructiOn PhaseOng> On the HOme Building Timeline at Ong>BB-18Ong>
Insurance, COnstructiOn
Ong>Insurance, COnstructiOnOng> On the HOme Building Timeline at Ong>II-9Ong>
InteriOr Painting
Ong>InteriOr PaintingOng> On the HOme Building Timeline at Ong>X-6Ong>
InteriOr Surface PreparatiOn fOr Painting
Ong>InteriOr Surface PreparatiOn fOr PaintingOng> On the HOme Building Timeline at Ong>Y-6Ong>
InteriOr Trim InstallatiOn
Ong>InteriOr Ong>Ong>Trim InstallatiOn Ong>On the HOme Building Timeline at Ong>U-13Ong>
InteriOr Wall Surface Final InstallatiOn
Ong>InteriOr Wall Surface Final InstallatiOnOng> On the HOme Building Timeline at Ong>DD-8Ong>
Intermediate InstallatiOn Phase
Ong>Intermediate InstallatiOn PhaseOng> On the HOme Building Timeline at Ong>CC-17Ong>
JOist, Ceiling
Ong>JOist, CeilingOng> On the HOme Building Timeline at Ong>Y-16Ong> within the On-timeline article Ong>The Strength Of CeilingsOng>
JOist, FlOOr
Ong>JOist, FlOOrOng> On the HOme Building Timeline at Ong>R-19Ong> within the On-timeline article Ong>The Strength Of FlOOr JOists, FlOOr Systems, and FlOOr PlatfOrmsOng>
Keyed JOint, MasOnry
Ong>Keyed JOint, MasOnryOng> On the HOme Building Timeline atOng> DD-11, CC-12Ong>
Kitchen Design, StOrage, and Practical Use
Ong>Kitchen Design, StOrage, and Practical UseOng> On the HOme Building Timeline at Ong>X-8Ong>, and within the On-timeline article centered On Ong>Z-9Ong>
Kitchen Planning
Ong>Kitchen PlanningOng> On the HOme Building Timeline atOng> Z-9, X-26Ong>
Kitchen Utensil StOrage
Ong>Kitchen Utensil StOrageOng> On the HOme Building Timeline atOng> X-8, X-9Ong>
Land
Ong>LandOng> On the HOme Building Timeline at Ong>L-12Ong>
Landscape Details and Plantings InstallatiOn On the HOme Building Timeline at Ong>V-14Ong>
Landscape Features CrOssing Building Lines and Easements
Ong> Landscape Features CrOssing Building Lines and EasementsOng> On the HOme Building Timeline at Ong>C-4Ong>
Landscape Features, Mark
Ong>Landscape Features, MarkOng> On the HOme Building Timeline at Ong>II-8, JJ-8Ong>
Landscape, Cleanup
Ong>Landscape, CleanupOng> On the HOme Building Timeline at Ong>X-15Ong>
Landscaping - Grade Yard, Place Sand
Ong>Landscaping - Grade Yard, Place SandOng> On the HOme Building Timeline at Ong>BB-7Ong>
Landscaping : 'Live' Plant Barriers & Wrapping fOr PrOtectiOn
Ong>Landscaping : 'Live' Plant Barriers & Wrapping fOr PrOtectiOnOng> On the HOme Building Timeline at Ong>II-7Ong>
Landscaping : Live-Plant Staging Areas
Ong>Landscaping : Live-Plant Staging AreasOng> On the HOme Building Timeline at Ong>HH-7Ong>
Lead Paint RemediatiOn
Ong>Lead Paint RemediatiOnOng> On the HOme Building Timeline at Ong>M-18, JJ-14, KK-21, MM-21Ong>
Lead RemediatiOn - Paint and Pipes
Ong>Lead RemediatiOn - Paint and PipesOng> On the HOme Building Timeline at Ong>JJ-14, KK-21Ong>
Leak DetectiOn, ChrOnic
Ong>Leak DetectiOn, ChrOnicOng> On the HOme Building Timeline at Ong>P-14Ong>
Leased Land fOr a HOmesite
Ong>Leased Land fOr a HOmesiteOng> On the HOme Building Timeline at Ong>N-18Ong>
Lender, Arrange COnstructiOn LOan with
Ong>Lender, Arrange COnstructiOn LOan withOng> On the HOme Building Timeline at Ong>HH-19Ong>
Letter tO PrOceed
Ong>Letter tO PrOceedOng> On the HOme Building Timeline at Ong>KK-17Ong>
Lien Release Assurance
Ong>Lien Release AssuranceOng> On the HOme Building Timeline at Ong>Z-14Ong>
Light Fixture Delivery tO Site
Ong>Light Fixture Delivery tO Site Ong>On the HOme Building Timeline at Ong>V-7Ong>
Light Fixture RemOval fOr RenOvatiOn
Ong>Light Fixture RemOval Ong>fOr RenOvatiOn On the HOme Building Timeline at Ong>KK-7Ong>
Light POllutiOn
Ong>LIGHT POLLUTIONOng> On the HOme Building Timeline at Ong>H-18Ong>, Hazards Of Site SelectiOn.
Light, COlOr Of
Ong>Light, Ong>Ong>COlOr OfOng> On the HOme Building Timeline at Ong>W-8Ong>
Lighting Fixture, InspectiOn and Repair
Ong>Lighting Fixture, InspectiOn and RepairOng> On the HOme Building Timeline at Ong>Z-14, AA-14Ong>
Lighting, POrtable - Rental
Ong>Lighting, POrtable - RentalOng> On the HOme Building Timeline at Ong>KK-7Ong>
LivestOck
Ong>LivestOckOng> On the HOme Building Timeline at Ong>Y-26, Z-26Ong>
Living Area
Ong>Living AreaOng> is part Of the definitiOn fOr InteriOr Area On the HOme Building Timeline at Ong>R-25Ong>.
Ong>Living AreaOng> includes all walls needed tO enclOse the heated and cOOled area Of a hOuse, whereas InteriOr Area is Only the empty space in any given rOOm Or grOup Of rOOms.
LOad Bearing Structure & Wall IdentificatiOn
Ong>LOad Bearing Structure & Wall IdentificatiOnOng> On the HOme Building Timeline at Ong>GG-22Ong>
LOcatiOn Of HOuse On PrOperty
Ong>LOcatiOn Of HOuse On PrOpertyOng> On the HOme Building Timeline at Ong>K-14Ong>
LOg Cabin IllustratiOn
Ong>LOg Cabin IllustratiOnOng> On the HOme Building Timeline at Ong>R-24, S-24, T-25Ong>
LOOk Of the Plan and HOuse
Ong>LOOk Of the Plan and HOuseOng> On the HOme Building Timeline at W-24, Ong>discussed at V-25, W-25Ong>
MailbOx Easement
Ong>MailbOx EasementOng> On the HOme Building Timeline at Ong>H-4Ong>
Main Building in Plat RestrictiOns
Ong>Main Building in Plat RestrictiOns Ong>On the HOme Building Timeline at Ong>F-9 tO F-10Ong>
Maintain YOur HOme
Ong> Maintain YOur HOme Ong>On the HOme Building Timeline at Ong>Y-11Ong>
Maintenance COsts
Ong>Maintenance COsts Ong>On the HOme Building Timeline atOng> L-9Ong>
Maintenance Of the HOme
Ong>Maintenance Of the HOme Ong>On the HOme Building Timeline at Ong>Y-11Ong>
ManifOld, HOt Water Plumbing
Ong>ManifOld, HOt Water Ong>Ong>Plumbing Ong> On the HOme Building Timeline within the On-timeline article, Ong>HOt Water Plumbing: The ManifOld beginningOng> beginning at Ong>FF-11Ong>
Mark ALL HOmesite COrners, Lines, and POints
Ong>Mark ALL HOmesite COrners, Lines, and POintsOng> On the HOme Building Timeline at Ong>HH-8Ong>
Mark Trees and Landscape Features
Ong>Mark Trees and Landscape FeaturesOng> On the HOme Building Timeline at Ong>II-8, JJ-8Ong>
Markers
Ong>MarkersOng> - On the HOme Building Timeline at Ong>Y-1Ong>
Markers, Warning
Ong>Markers, WarningOng> On the HOme Building Timeline at Ong>V-4Ong>
MasOnry Materials - Order fOr Delivery
Ong>MasOnry Materials - Order fOr DeliveryOng> On the HOme Building Timeline at Ong>EE-13Ong>
MasOnry WOrk, Brick WOrk, and StOne WOrk
Ong>MasOnry WOrk, Ong>Ong> Ong>Ong>Brick WOrk,Ong>Ong> and StOne WOrkOng> On the HOme Building Timeline at Ong>EE-10Ong>
Match ExteriOr Wall Surfaces
Ong>Match ExteriOr Wall SurfacesOng> On the HOme Building Timeline in the diagram beginning at Ong>CC-10Ong>
Match New with Old
Match New with Old On the HOme Building Timeline at DD-13
Material SelectiOn - COuntertOp
Ong>Material SelectiOn - COuntertOp Ong>On the HOme Building Timeline at Ong>DD-8Ong>.
This nOte's instructiOns are lOcated at Ong>CC-8Ong>
Material SelectiOn, Man-Made
Ong>Material SelectiOn, Man-MadeOng> On the HOme Building Timeline at Ong>FF-25Ong>
Material SelectiOn, Match New tO Old
Ong>Material SelectiOn, Match New tO OldOng> On the HOme Building Timeline at Ong>DD-13Ong>
Material StOrage Prearrangement
Ong>Material StOrage PrearrangementOng> On the HOme Building Timeline at Ong>Q-7, R-7Ong>
Maximizing the Plan
Ong>Maximizing the PlanOng> On the HOme Building Timeline at Ong>Y-24Ong>, discussed at Ong>Y-25Ong>
Measure Structure As-Built fOr Cabinet InstallatiOn
Ong>Measure Structure As-Built fOr Cabinet InstallatiOnOng> On the HOme Building Timeline at Ong>DD-8Ong>.
This nOte's instructiOns are lOcated at Ong>CC-9Ong>
Measure Structure As-Built fOr COuntertOp InstallatiOn
Ong>Measure Structure As-Built fOr COuntertOp InstallatiOnOng> On the HOme Building Timeline at Ong>DD-8Ong>.
This nOte's instructiOns are lOcated at Ong>CC-9Ong>
Mechanical - DefinitiOn
Ong>Mechanical - DefinitiOnOng> : Refers tO all equipment related tO the infrastructure Of a hOuse fOr the purpOse Of mOving air and fluids. This includes HVAC (heating, ventilatiOn, and air cOnditiOning) cOnnectiOns, duct-wOrk, and equipment, such as air handlers, furnaces, cOmpressOrs, and humidifier/dehumidifier units. It alsO includes all plumbing pipes, fittings, and valves.
Mechanical InspectiOn
Ong>MechanicalOng> Ong>InspectiOn Ong> On the HOme building Timeline atOng> EE-11, U-9Ong>
Mechanical Phase
Ong>Mechanical PhaseOng> On the HOme Building Timeline atOng> DD-16Ong>
Meeting Of the Minds
Ong>Meeting Of the MindsOng> On the HOme Building Timeline atOng>II-9, S-22, S-23Ong>
Meeting, Pre-COnstructiOn
Ong>Meeting, Pre-COnstructiOnOng> On the HOme Building Timeline atOng> II-9Ong>
Mesh, Wire and Steel ROds fOr ReinfOrcing
Ong>Mesh, Wire and Steel ROds fOr ReinfOrcingOng> On the HOme Building Timeline at Ong>Q-10Ong>
MethOd
Ong>MethOdOng> On the HOme Building Timeline atOng> HH-12Ong>
Mimic, AerOdynamic ROOf
Ong>Mimic, AerOdynamic ROOfOng> On the HOme Building Timeline atOng> Z-16Ong>
Mind & BOdy
Ong>Mind & BOdyOng> On the HOme Building Timeline at Ong>O-3Ong>
Ong>MOney SOurces - BADOng> On the HOme Building Timeline at Ong>L-6Ong>
MOney SOurces - GOOD
Ong>MOney SOurces - GOODOng> On the HOme Building Timeline at Ong>M-6Ong>
MOney, Saving
Ong>MOney, SavingOng> On the HOme Building Timeline at Ong>K-6Ong>
MOnkey See MOnkey DO (alsO see MSMD)
Ong>MOnkey See MOnkey DOOng> : An actual but wrOng methOd Of cOnstructiOn-cOst calculatiOn perfOrmed by an incOmpetent builder whO is cOpying Other incOmpetent builders, nOne Of whOm has any knOwledge Of cOnstructiOn cOsts whatsOever.
MOve In
Ong>MOve InOng> On the HOme Building Timeline at Ong>Z-12Ong>
MOving ArOund In The HOuse
Ong>MOving ArOund In The HOuseOng> On the HOme Building Timeline at Ong>V-24, discussed at W-23Ong>
Mud Tracks & Trails frOm HOmesite
Ong>Mud Tracks & Trails frOm HOme SiteOng> On the HOme Building Timeline at Ong>EE-3Ong>
Natal HOming
Ong>Natal HOmingOng> In HOmeBuildingTimeline.cOm, within the article Ong>LIGHTS OUT BY THE SEAOng>
NeighbOrhOOd Architectural COntrOl COmmittee Plan SubmissiOn
Ong>NeighbOrhOOd Architectural COntrOl COmmittee Plan SubmissiOnOng> On the HOme Building Timeline at Ong>II-17Ong>
NeighbOrhOOd HarmOny
Ong>NeighbOrhOOd HarmOnyOng> On the HOme Building Timeline at Ong>HH-1, KK-1Ong>
NOrth ArrOw
Ong>NOrth ArrOwOng> On the HOme Building Timeline at Ong>E-8Ong>
Obstacles
Ong>ObstaclesOng> mentiOns On the HOme Building Timeline at Ong>N-4Ong>
Occupancy, Certificate Of
Ong>Occupancy, Certificate Of Ong>On the HOme Building Timeline at Ong>Y-14Ong>
One ROOm Hut
Ong>One ROOm HutOng> On the HOme Building Timeline at Ong>S-24Ong>
OptiOn tO Purchase
Ong>OptiOn tO PurchaseOng> On the HOme Building Timeline at Ong>N-19Ong>
Ordinance
Ong>OrdinanceOng> On the HOme Building Timeline at Ong>M-19, LL-16Ong>
Other Buildings in Plat RestrictiOns
Ong>Other Buildings in Plat RestrictiOns Ong>On the HOme Building Timeline at Ong>F-9 tO F-10Ong>
Over-Cutting a Hillside
Ong>Over-Cutting a HillsideOng> On the HOme Building Timeline at Ong>Y-3Ong>, and in the diagram beginning at Ong>SS-1Ong>
Overhead POwer Line LOcatiOn VerificatiOn
Ong>Overhead POwer Line LOcatiOn VerificatiOnOng> On the HOme Building Timeline at Ong>O-23Ong>
Overhead Utility Wiring
Ong>Overhead Utility WiringOng> On the HOme Building Timeline at Ong>I-3Ong>
Own, What YOu
Ong>Own, What YOuOng> On the HOme Building Timeline at Ong>M-15Ong>; partial list at Ong>H-17Ong>
Ownership
Ong>OwnershipOng> partially listed On the HOme Building Timeline at Ong>H-17Ong>
P.U.D.E. - Private Utility & Drainage Easement
Ong>P.U.D.E. : Private Utility & Drainage EasementOng> On the HOme Building Timeline at Ong>B-6Ong>
Paint & COatings, Recycle
Ong>Paint & COatings, Recycle Ong> On the HOme Building Timeline at Ong>HH-5, JJ-12, X-15Ong>
Paint - Final COat
Ong>Paint - Final COatOng> On the HOme Building Timeline at Ong>V-7Ong>
Paint - Quality Check
Ong>Paint - Ong>Ong>Quality CheckOng> On the HOme Building Timeline at Ong>Z-14, AA-15Ong>
Ong>Plans,Ong> Ong>Final Ong>On the HOme Building Timeline at Ong>FF-21Ong>
Planting PrOtectiOn
Ong>Planting PrOtectiOnOng> On the HOme Building Timeline at Ong>II-4Ong>
Plantings and Landscape Details InstallatiOn
Plantings and Landscape Details InstallatiOn On the HOme Building Timeline at Ong>V-14Ong>
Plat RestrictiOns
Ong>Plat RestrictiOnsOng> On the HOme Building Timeline at Ong>F-9Ong>, within BEADS KeystOne at Ong>H-10Ong>, and SITE HAZARDS at Ong>I-19Ong>, and Ong>M-16Ong>
Plat RestrictiOns : Main Building
Ong>Plat RestrictiOns : Main BuildingOng> On the HOme building Timeline at Ong>F-10, G-8Ong>
Plat RestrictiOns : Other Buildings
Ong>Plat RestrictiOns : Other BuildingsOng> On the HOme building Timeline at Ong>F-10, G-9Ong>
Plat RestrictiOns vs Building COde
Ong>Plat RestrictiOns vs Building COdeOng> On the HOme Building timeline at Ong>O-22Ong>
Plumbing Drains - Existing
Ong>Plumbing Drains - ExistingOng> On the HOme Building Timeline at Ong>Q-25Ong>
Plumbing ManifOld, HOt Water
Ong>Plumbing ManifOld, HOt WaterOng> On the HOme Building Timeline within the On-timeline article beginning at Ong>FF-11Ong>
Plumbing ROugh-In
Ong>Plumbing ROugh-InOng> On the HOme Building Timeline at Ong>S-5Ong>
Plumbing TOp Out
Ong>Plumbing TOp OutOng> On the HOme Building Timeline at Ong>EE-15Ong>
Plumbing Trim-Out
Ong>Plumbing Trim-Out Ong>On the HOme Building Timeline at Ong>W-6Ong>
POints Of COnnectiOn
Ong>POints Of COnnectiOnOng> On the HOme Building Timeline at Ong>AA-16, Z-17Ong>
POle, POwer
Ong>POle, POwerOng> On the HOme Building Timeline atOng>I-3Ong>
POlice ActiOn fOr Debris, Mud, and Trash in FOOting Trenches
Ong>POlice ActiOn fOr Debris, Mud, and Trash in FOOting TrenchesOng> On the HOme Building Timeline at Ong>Q-12, O-13Ong>
POnd, RetentiOn
POnd,Ong>RetentiOn Ong>On the HOme Building Timeline at Ong>QQ-4Ong>
POnding in a Crawlspace
Ong>POnding in a CrawlspaceOng> On the HOme Building Timeline at Ong>T-4Ong>
POnding PreventiOn
Ong>POnding PreventiOnOng> On the HOme Building Timeline atOng> T-4Ong>
POnding Under a Slab
Ong>POnding Under a SlabOng> On the HOme Building Timeline at Ong>T-4Ong>
POOl, Ornamental
Ong>POOl, OrnamentalOng> On the HOme Building Timeline at Ong>A-2Ong>
POrch and Deck COnstructiOn, Finish
Ong>POrch and Deck COnstructiOn, FinishOng> On the HOme Building Timeline at DD-9
POrch Size, COvered Area
Ong>POrch Size, COvered AreaOng> On the HOme Building Timeline at Ong>I-9Ong>
POssessiOns, StOrage Of
Ong>POssessiOns, StOrage Of :Ong> On the HOme Building Timeline at Ong>KK-8Ong>
POst and Pillar Strength
Ong>POst and Pillar StrengthOng> On the HOme Building Timeline Ong>G-22, diagrammed at G-23 Ong>
POst Strength
Ong>POst StrengthOng> On the HOme Building Timeline at Ong>T-16Ong>
POst, Fence
Ong>POst, Fence Ong>On the HOme Building Timeline at Ong>G-25Ong>
POwer Line LOcatiOn VerificatiOn, Overhead
Ong>POwer Line LOcatiOn VerificatiOn, Ong>Ong>Overhead Ong> On the HOme Building Timeline at Ong>O-23Ong>
POwer Service InstallatiOn
Ong>POwer Service InstallatiOnOng> On the HOme Building Timeline at Ong>BB-2Ong>
POwer Vents - Order fOr Delivery
Ong>POwer Vents - Order fOr DeliveryOng> On the HOme Building Timeline at Ong>W-19Ong>
Pre-COnstructiOn Meeting
Ong>Pre-COnstructiOn MeetingOng> On the HOme Building Timeline atOng> II-9Ong>
Pre-InspectiOn
Ong>Pre-InspectiOnOng> On the HOme Building Timeline at Ong>JJ-8Ong>
Preliminary Plan, Early
Ong>Preliminary Plan, EarlyOng> On the HOme Building Timeline at Ong>CC-23, discussed CC-24Ong>
Preliminary, Advanced
Ong>Preliminary, AdvancedOng> On the HOme Building Timeline at Ong>DD-23, discussed at EE-25Ong>
PreparatiOn, Site
Ong>PreparatiOn, SiteOng> On the HOme Building Timeline at Ong>GG-4Ong>
Prepare tO Build
Ong>Prepare tO BuildOng> On the HOme Building Timeline at Ong>JJ-10Ong>
Primary DecisiOns List
Ong>Primary DecisiOns ListOng> On the HOme Building Timeline at Ong>S-23, discussed at R-24Ong>
Private ROad / Street Status VerificatiOn
Ong>Private ROad / Street Status VerificatiOnOng> On the HOme Building Timeline at Ong>M-20Ong>
PrOceed, Official Letter tO
Ong>PrOceed, Official Letter tOOng>Ong> :Ong> On the HOme Building Timeline atOng> II-11Ong>
PrOject Planning, Final
Ong>PrOject Planning, FinalOng> On the HOme Building Timeline at Ong>HH-19Ong>
PrOpane & Gas Line ROugh-In
Ong>PrOpane & Gas Line ROugh-InOng> On the HOme Building Timeline at Ong>R-6Ong>
PrOpane / Gas Line ROugh In
Ong>PrOpane / Gas Line ROugh InOng> On the HOme Building Timeline at Ong>EE-14Ong>
PrOperty BOundary Line
Ong>PrOperty BOundary LineOng> On the HOme Building Timeline within the Ong>diagram centered at D-3Ong>, shOwn as the thick white line; and within the Ong>diagram centered at C-8Ong>., within the On-timeline article SITE LINES at Ong>F-6Ong>; and within the BEADS KeystOne at Ong>H-10, I-10, L-12Ong>
PrOperty Line
Ong> PrOperty LineOng> On the HOme Building Timeline at Ong>B-10, C-10, D-10Ong>
AlsO within the diagram centered at Ong>D-3Ong>, shOwn as the thick white line.
AlsO within the diagram centered at Ong>C-8Ong>.,
Article SITE LINES at Ong>F-6Ong>; and within the BEADS KeystOne at Ong>H-10, I-10, L-12Ong>
AlsO at Ong>A-15, A-16Ong>
PrOperty Line VerificatiOn
Ong>PrOpertyLine VerificatiOn Ong>On the HOme Building timeline at Ong>HH-8Ong>
PrOperty Line, Fence & Structure ON
PrOperty Line, Fence & Structure ON On the HOme Building Timeline diagram beginning at F-24
PrOpping, ShOring, Trench
Ong>PrOpping, ShOring, TrenchOng> On the HOme Building Timeline at Ong>V-4Ong>
PrOtectiOn fOr Live Plants
Ong>PrOtectiOn fOr Live PlantOng>s On the HOme Building Timeline at Ong>II-7Ong>
PrOtectiOn Of Tree Branches
Ong>PrOtectiOn Of Tree BranchesOng> On the HOme Building Timeline atOng> II-5Ong>
PrOtectiOn, Planting
Ong>PrOtectiOn, PlantingOng> On the HOme Building Timeline at Ong>II-4Ong>
PrOtective COvers
Ong>PrOtective COversOng> On the HOme Building Timeline at Ong>EE-13Ong>
Punch List, Final InspectiOn
Ong>Punch-List, Final IOng>Ong>nspectiOn Ong> On the HOme Building Timeline at Ong>Z-13Ong>
Ong>Quality Check - PaintOng> On the HOme Building Timeline at Ong>AA-14Ong>
Quality Check, Surface Finishes
Ong>Quality Check, Ong>Ong>Surface FinishesOng> On the HOme Building Timeline at Ong>Z-15Ong>
Quick Start
Ong>Quick StartOng> On the HOme Building Timeline at Ong>O-2Ong>
RadOn Gas - DefinitiOn
Ong>RadOn Gas - DefinitiOnOng> On the HOme Building Timeline at Ong>DD-2, DD-3,Ong> Ong>EE-1, EE-2Ong>
RadOn Venting Diagram
Ong>RadOn Venting Ong>On the HOme Building Timeline at Ong>R-6 Ong>& Ong>T-6Ong>
RadOn Venting ROugh In
Ong>RadOn Venting ROugh In : Ong>On the HOme Building Timeline at Ong>R-6Ong>
RadOn Venting TOp Out
Ong>RadOn Venting TOp OutOng> On the HOme Building Timeline at Ong>EE-15Ong>
RadOn Venting, Crawlspace Pipe InstallatiOn fOr
Ong>RadOn Venting, Crawlspace Pipe InstallatiOn fOr :Ong> On the HOme Building Timeline at Ong>T-18Ong>
Railings Of Stairs, Finish InstallatiOn Of
Ong>Railings Of Stairs, Finish InstallatiOn Of :Ong> On the HOme Building Timeline at Ong>U-12Ong>
Read HOuse Plans
Ong>Read HOuse PlansOng> On the HOme Building Timeline at Ong>T-24, discussed beginning at T-21Ong>
Rear Building Set Back Line
Ong>Rear Building Set Back LineOng> On the HOme Building Timeline at Ong>C-1Ong>.
Rear Easement
Ong>Rear EasementOng> On the HOme Building Timeline at Ong>B-1Ong>
Rebar
Rebar On the HOme Building Timeline at Q-10
RecreatiOnal Vehicle (RV)
Ong>RecreatiOnal Vehicle (RV)Ong> On the HOme Building Timeline at Ong>F-11Ong>, within the diagram centered at Ong>SS-14Ong>
Recycle COatings and Paint
Ong>Recycle COatings and PaintOng> On the HOme Building Timeline at Ong>HH-5Ong>
Recycle Paint & COatings
Ong>Recycle Paint & COatingsOng> On the HOme Building Timeline at Ong>HH-5, JJ-12, X-15Ong>
Refusal, First Right Of
Ong>Refusal, First Right OfOng> : On the HOme Building Timeline at Ong>N-19Ong>
RegulatiOns
Ong>RegulatiOnsOng> On the HOme Building Timeline at Ong>N-19Ong>
RegulatiOns, ErOsiOn COntrOl
Ong>RegulatiOns, ErOsiOn COntrOlOng> On the HOme Building Timeline at Ong>FF-4, I-20Ong>
RegulatiOns, Hierarchy
Ong>RegulatiOns, HierarchyOng> On the HOme building Timeline at Ong>O-10Ong>
RegulatiOns, Wildlife Habitat
Ong>RegulatiOns,Ong> Ong>Wildlife Habitat Ong> On the HOme Building Timeline at Ong>FF-4, I-20Ong>
RegulatOrs, Meet
Ong>RegulatOrs, MeetOng> On the HOme Building Timeline at Ong>O-20Ong>
ReinfOrcing Wire Mesh and Steel ROds
Ong>ReinfOrcing Wire Mesh and Steel ROdsOng> On the HOme Building Timeline at Ong>Q-10Ong>
RemediatiOn Permits
Ong>RemediatiOn PermitsOng> On the HOme Building Timeline at Ong>JJ-14Ong>
Repair & Replacement
Ong>Repair & ReplacementOng> On the HOme Building Timeline at Ong>DD-19Ong>
RestrictiOns, Plat
Ong>RestrictiOns, PlatOng> On the HOme Building Timeline at Ong>F-9Ong>, within BEADS KeystOne at Ong>H-10Ong>, and SITE HAZARDS at Ong>I-19Ong>, and Ong>M-16Ong>
Restrictive COvenants
Ong>Restrictive COvenantsOng> On the HOme Building Timeline at Ong>M-19Ong>
RestrOOm, TempOrary POrtable
Ong>RestrOOm, TempOrary POrtableOng> On the HOme Building Timeline at Ong>HH-8Ong>
RetentiOn POnd
Ong>RetentiOn POndOng> On the HOme Building Timeline at Ong>QQ-4Ong>
Right-Of-Way
Ong>Right Of WayOng> On the HOme Building Timeline at Ong>E-4, E-5Ong>, alsO within the On-timeline article, SITE LINES at Ong>F-6Ong>. AlsO diagrammed at Ong>B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16Ong>
A Right-Of-Way (ROW) fOr a street, rOad, Or highway is a special parcel Of land. A rOad ROW sits beside and between Other parcels Of prOperty. SOme examples are streets, interstate highways, railrOad tracks, gas lines, and pOwer lines.
A Right-Of-Way fOr utilities is a special type Of easement, and may pass thrOugh a privately Owned parcel Of land. In such a case, the landOwner still pOssesses the land, but is nOt allOwed tO ever build within the ROW. Examples are gas pipelines, pOwerlines, and Other utilities like cable televisiOn and telephOne; and driveways allOwing One Owner tO crOss anOther Owner's land.
Riparian Margin
Ong>Riparian MarginOng> On the HOme Building Timeline at Ong>I-19Ong> inside the tOpic Ong>Hazards Of Site SelectiOnOng>
ROOf
Ong>ROOfOng> On the HOme Building Timeline at Ong>AA-18, AA-19, EE-12, I-21, K-21, K-23, S-17, W-22, Z-16.Ong>
ROOf - NEVER New Over Old
Ong>ROOf - NEVER New Over OldOng> On the HOme Building Timeline at Ong>CC-19Ong>
ROOf Drainage Issues, Altered
Ong>ROOf Drainage Issues, AlteredOng> On the HOme Building Timeline atOng> V-19, U-20, V-20Ong>
ROOf Dry In COmplete
Ong>ROOf Dry In COmpleteOng> On the HOme Building Timeline at Ong>AA-18Ong>
ROOf Framing - Begin InstallatiOn
Ong>ROOf Framing - Begin InstallatiOnOng> On the HOme Building Timeline at V-20
ROOf Materials
Ong>ROOf MaterialsOng> On the HOme Building Timeline at Ong>Z-16Ong>
ROOf Materials: Order fOr Delivery
Ong>ROOf Materials : Order fOr DeliveryOng> On the HOme building Timeline at Ong>EE-13Ong>
ROOf Plane IntersectiOn and Rainwater Run Off
Ong>ROOf Plane IntersectiOn and Rainwater Run OffOng> On the HOme Building Timeline at Ong>V-20Ong>
ROOf SlOpe / Pitch
Ong>ROOf SlOpe / PitchOng> diagrammed On the HOme Building Timeline beginning atOng>I-21Ong>
ROOf Strength
Ong>ROOf StrengthOng> On the HOme Building Timeline at Ong>Z-16Ong>
ROOf Surface Material InstallatiOn
Ong>ROOf Surface Material InstallatiOnOng> On the HOme Building Timeline at Ong>EE-13Ong>
ROOf Surface Material VerificatiOn
Ong>ROOf Surface Material VerificatiOnOng> On the HOme Building Timeline at Ong>AA-19Ong>
ROOf Surface Materials : Order fOr Delivery
Ong>ROOf Surface Materials : Order fOr DeliveryOng> On the HOme building Timeline at Ong>EE-13Ong>
ROOf Types
Ong>ROOf TypesOng> On the HOme Building Timeline diagrammed beginning atOng> K-23Ong>
ROOf, Bull NOse
Ong>ROOf, Bull NOseOng> On the HOme Building Timeline at Ong>M-26Ong>
ROOf, Dutch Gable
Ong>ROOf, Dutch GableOng> On the HOme Building Timeline at Ong>M-25Ong>
ROOf, Gable
Ong>ROOf, GableOng> On the HOme Building Timeline at Ong>K-22, K-24, K-25, K26Ong>
ROOf, Gable On Gable
Ong>ROOf, Gable On GableOng> On the HOme Building Timeline atOng> K-26Ong>
ROOf, Hip
Ong>ROOf, HipOng> On the HOme Building Timeline at Ong>L-22, M-23, M-24Ong>
ROOf, Shed
Ong>ROOf, ShedOng> On the HOme Building Timeline at Ong>K-22, K-25Ong>
ROOfing Materials - Delivered
Ong>ROOfing Materials - DeliveredOng> On the HOme Building Timeline at Ong>AA-19Ong>
ROOm Size vs Plan DimensiOn
Ong>ROOm Size vs Plan DimensiOnOng> On the HOme Building Timeline at Ong>T-21, DD-26Ong>
ROOt Line
Ong>ROOt LineOng> On the HOme Building Timeline within the diagram centered at Ong>FF-6Ong>
ROW Or Right Of Way
Ong>ROW Or Right Of Way Ong>On the HOme Building Timeline atOng> E-4, E-5,Ong> alsO within the article, SITE LINES atOng> F-6Ong>. AlsO diagrammed at Ong>B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16Ong>
A Right-Of-Way (ROW) fOr a street, rOad, Or highway is a special parcel Of land. A rOad ROW sits beside and between Other parcels Of prOperty. SOme examples are streets, interstate highways, railrOad tracks, gas lines, and pOwer lines.
A Right-Of-Way fOr utilities is a special type Of easement, and may pass thrOugh a privately Owned parcel Of land. In such a case the landOwner still pOssesses the land, but is nOt allOwed tO ever build within the ROW. Examples are gas pipelines, pOwerlines, and Other utilities like cable televisiOn and telephOne; and driveways allOwing One Owner tO crOss anOther Owner's land.
Rule VariatiOns
Ong>Rule VariatiOnsOng> On the HOme Building Timeline at Ong>N-20Ong>
Rules
Ong>RulesOng> On the HOme Building Timeline at Ong>N-19Ong>
RunOff
Ong>RunOffOng> On the HOme Building Timeline at Ong>JJ-2Ong>
Rural PrOject COde COmpliance
Ong>Rural PrOject COde COmplianceOng> On the HOme Building Timeline at Ong>O-21Ong>
RV (RecreatiOnal Vehicle)
Ong> RV (RecreatiOnal Vehicle)Ong> On the HOme Building Timeline at Ong>F-11Ong>, within the diagram centered at Ong>SS-14Ong>
Safe Areas
Ong>Safe AreasOng> On the HOme Building Timeline at Ong>AA-23Ong>
Safe At HOme : Life, POssessiOns, & Structure
Ong>Safe At HOme : Life, POssessiOns, & StructureOng> On the HOme Building Timeline at Ong>Z-11, AA-llOng>
Safes & Vaults
Ong>Safes & Vaults Ong>On the HOme Building Timeline at Ong>AA-22Ong>
Ong>State Building COdeOng> On the HOme Building Timeline at Ong>O-22Ong>
Steel ROds and Wire Mesh fOr ReinfOrcing
Ong>Steel ROds and Wire Mesh fOr ReinfOrcingOng> On the HOme Building Timeline at Ong>Q-10Ong>
Sticker ShOck
Ong>Sticker ShOck Ong>On the HOme Building Timeline at Ong>BB-25Ong>
Stilts
Ong>StiltsOng> On the HOme Building Timeline at Ong>T-16Ong>
StOne and MOrtar - Order fOr Delivery
Ong>StOne and MOrtar - Order fOr DeliveryOng> On the HOme Building Timeline at Ong>EE-13Ong>
StOne WOrk, Brick WOrk, and MasOnry WOrk
Ong>StOne WOrk, Ong>Ong>Brick WOrk,Ong>Ong> and MasOnry WOrkOng> On the HOme Building Timeline at Ong>EE-10Ong>
StOp and Think
Ong>StOp, and ThinkOng> On the HOme Building Timeline Ong>EVERYWHERE.Ong>
&quOt;Thinking&quOt; is the secOnd least-used tactic in the planning and cOnstructiOn prOcess. The first least-emplOyed tactic is stOpping tO dO it.
Building anything dwelling-related is a hurried, high-pressure, higher-expectatiOns, highest-emOtiOnal-state experience. 'ReasOn' is replaced by anxiety; and bad decisiOn-making fOllOws, naturally. The cure is tO give yOurself a mOment tO cOnsider OptiOns. SO, stOp and think.
Ong>Learn these phrases and use them Often:Ong>
Ong>&quOt;This dOesn't seem right. I need sOme time tO think abOut it.&quOt;Ong>
Ong>&quOt;Let's lOOk at that mOre clOsely.&quOt;Ong>
Ong>&quOt;HOw can we fix this prOblem?&quOt;Ong>
Ong>Gain the high grOund in any situatiOn by seizing the mOment tO stOp and think.Ong>
Ong>COncerning every aspect Of this prOject :Ong>
If yOu're unsure, stOp and becOme certain.
If a thing is unknOwn tO yOu, stOp and learn abOut it.
When a mistake is made, by yOu Or Others, stOp and find Of a sOlutiOn.
The key wOrd is Ong>STOPOng>. DOn't wOrry if peOple arOund yOu are impatient. Stand firm, as yOu actively seek pOsitive sOlutiOns. -AB
StOp, Study, and Think
Ong>StOp, Study, and ThinkOng> On the HOme Building Timeline atOng> CC-23, discussed at DD-24Ong>
StOrage - Garage - ArOund the Edge
Ong>StOrage - Garage - ArOund the EdgeOng> On the HOme Building Timeline at Ong>OO-11Ong>
StOrage Building
Ong>StOrage BuildingOng> On the HOme Building Timeline at Ong>F-11Ong>
StOrage Of POssessiOns
Ong>StOrage Of POssessiOnsOng> On the HOme Building Timeline at Ong>KK-8Ong>
StOrage Under Stairs
Ong>StOrage Under StairsOng> On the HOme Building Timeline at Ong>TT-26Ong>
StOrage Unit Rental
Ong>StOrage Unit RentalOng> On the HOme Building Timeline at Ong>JJ-7Ong>
StOrage, Garage
Ong>StOrage, GarageOng> On the HOme Building Timeline at SS-9, within the Vehicle Diagrams centered On Ong>RR-13, SS-15, RR-20Ong>
StOrage, Kitchen
Ong>StOrage, KitchenOng> On the HOme Building Timeline at Ong>X-8Ong>, and within the article centered On Ong>Z-9Ong>
StOrage, Kitchen Utensil
Ong>StOrage, Kitchen UtensilOng> On the HOme Building Timeline at Ong>X-8, X-9Ong>
StOrm Drainage ExcavatiOn
Ong>StOrm Drainage ExcavatiOnOng> On the HOme Building Timeline at Ong>Y-2Ong>
StOrm Shelter ExcavatiOn
Ong>StOrm Shelter ExcavatiOnOng> On the HOme Building Timeline at Ong>W-2Ong>
StOrm Shelter, COncrete BlOck - Begin COnstructiOn
Ong>StOrm Shelter, COncrete BlOck - Begin COnstructiOnOng> On the HOme Building Timeline at Ong>Q-8Ong>
StOrm Shelter, Placed COncrete fOr Walls
Ong>StOrm Shelter, Placed COncrete fOr WallsOng> On the HOme Building Timeline at Ong>Q-13Ong>
StOrm Shelter, Wall FOrms fOr Near-Future Placed COncrete fOr
Ong>StOrm Shelter, Wall FOrms fOr Near-Future Placed COncrete fOrOng> On the HOme building Timeline at Ong>Q-9Ong>
Structural Decay, Evidence Of
Ong>Structural Decay, Evidence Of :Ong> On the HOme Building Timeline at Ong>Q-14Ong>
Structural Failure - FOundatiOn
Ong>Structural Failure - FOundatiOnOng> On the HOme Building Timeline at Ong>S-8Ong>
Structures On the PrOperty Line
Ong>Structures On the PrOperty LineOng> On the HOme Building Timeline Ong>diagram beginning at F-24Ong>
Style, ExteriOr
Ong>Style, Ong>Ong>ExteriOrOng> On the HOme Building Timeline in the diagram beginning at Ong>W-21Ong>
Sub-Party
Ong>Sub-PartyOng> On the HOme Building Timeline at Ong>DD-9Ong>, and described at Ong>MM-10Ong>
Sump Pit ExcavatiOn
Ong>Sump Pit ExcavatiOnOng> On the HOme Building Timeline at Ong>W-2, W-3Ong>
Super Genius
Ong>Super GeniusOng>
Andy NOel fOunder Of PrOSauraSystems.cOm is One. He created the mechanism fOr this Index.
Sander de Wijs (de-Veihs fOr Americans) Owner Of The Netherlands-based Ont size="3">DegrinthOrst.nlOnt>is chief Of prOgramming, and alsO a super genius. He writes all Of the cOde tO make HOmeBuildingTimeline.cOm functiOn.
Surface Finishes - Quality Check
Ong>Surface Finishes - Ong>Ong>Quality CheckOng> On the HOme Building Timeline at Ong>AA-15Ong>
Survey tO place HOuse On Site
Ong>Survey tO place HOuse On SiteOng> On the HOme Building Timeline at Ong>BB-2Ong>
Survival Of POssessiOns
Ong>Survival Of POssessiOnsOng> On the HOme Building Timeline at Ong>Z-23Ong>
Survival Of the Occupants
Ong>Survival Of the OccupantsOng> On the HOme Building Timeline atOng> Z-22, AA-22Ong>
Survival Of the Structure
Ong>Survival Of the StructureOng> On the HOme Building Timeline at Ong>Y-23, Z-23Ong>
Swimming POOl
Ong>Swimming POOlOng> On the HOme Building Timeline at Ong>A-2, F-11, II-5Ong>
Tailings Staging Area
Ong>Tailings Staging AreaOng> On the HOme Building Timeline at Ong>HH-7Ong>
Tax Incentives, Green Building
Ong>Tax Incentives, Green Building Ong> On the HOme Building Timeline atOng> II-16Ong>
TelephOne Service InstallatiOn
Ong>TelephOne Service InstallatiOnOng> On the HOme Building Timeline at Ong>BB-2Ong>
TempOrary Electric POwer InstallatiOn
Ong>TempOrary Electric POwer InstallatiOnOng> On the HOme Building Timeline at Ong>II-8Ong>
Tennis COurt
Ong>Tennis COurtOng> On the HOme Building Timeline at Ong>II-5Ong>
Termite Barrier
Ong>Termite BarrierOng> On the HOme building Timeline at Ong>FF-9Ong>, and within the Article TERMITES beginning at Ong>N-11, N-12, Q-12Ong>
Termite Barrier InstallatiOn
Ong>Termite Barrier InstallatiOnOng> On the HOme Building Timeline at Ong>FF-9 Ong>Ong>N-12, O-12, Q-12Ong>
Termite Shield On MasOnry Wall TOps
Ong>Termite Shield On MasOnry Wall TOpsOng> On the HOme Building Timeline at Ong>Q-13Ong>
Termites
Ong>TermitesOng> On the HOme building Timeline at Ong>FF-9Ong>, and within the On-timeline article TERMITES beginning at Ong>N-11Ong>
Termiticide Placement
Ong>Termiticide Placement Ong>On the HOme Building Timeline at Ong>Q-12Ong>
Terrace
Ong>TerraceOng> On the HOme Building Timeline at Ong>A-1, A-2Ong>
Terrace COncrete Placement
Ong>Terrace COncrete PlacementOng> On the HOme Building Timeline at Ong>AA-6Ong>
Test Well Water fOr Safety
Ong>Test Well Water fOr Safety Ong>On the hOme Building Timeline at Ong>DD-9Ong>
Texting
Ong>TextingOng> On the HOme Building Timeline at Ong>MM-15Ong>
Inside HOmeBuildingTimeline.cOm within the articles:
Ong>TOxic Materials TranspOrtatiOn PermitOng> On the HOme Building Timeline at Ong>KK-13Ong>
TOxic Materials, Handling Permits fOr
Ong>TOxic Materials, Handling Permits fOr Ong>On the HOme Building Timeline at Ong>KK-11Ong>
TOxic SmOke
Ong>TOxic SmOkeOng> On the HOme Building Timeline at Ong>CC-3Ong>
TransitiOn Strip
Ong>TransitiOn StripOng> On the HOme Building Timeline at Ong>DCC-12, D12Ong>
Tree - ClOsest PrOximity fOr COnstructiOn
Ong>Tree - ClOsest PrOximity fOr COnstructiOnOng> On the HOme Building Timeline within the diagram centered On Ong>KK-6 Ong>
Tree Branch PrOtectiOn
Ong>Tree Branch PrOtectiOnOng> On the HOme Building Timeline atOng> II-5Ong>
Trees, Mark
Ong>Trees, MarkOng> On the HOme Building Timeline at Ong>II-8, JJ-8Ong>
Trestle, Gate
Ong>Trestle, GateOng> On the HOme Building Timeline at Ong>E-25Ong>
Trim InstallatiOn, InteriOr
Ong>Trim InstallatiOn, InteriOr Ong>On the HOme Building Timeline at Ong>U-13Ong>
Trim Material, Order
Ong>Trim Material, OrderOng> On the HOme Building Timeline at Ong>CC-7Ong>
Trim Measurement VerificatiOn
Ong>Trim Measurement VerificatiOnOng> On the HOme Building Timeline at Ong>CC-7Ong>
Trim, ExteriOr InstallatiOn
Ong>Trim, ExteriOr InstallatiOnOng> On the HOme building Timeline at Ong>EE-12Ong>
Trim, TOuch-up InteriOr
Ong>Trim, TOuch-up InteriOrOng> On the HOme Building Timeline at Ong>U-13Ong>
Trimming and Clearing AlOng A PrOperty Line
Ong>Trimming and Clearing AlOng A PrOperty LineOng> On the HOme Building Timeline at Ong>A-3,Ong> Ong>HH-1, F-2Ong>
Trust
Ong>TrustOng> On the HOme Building Timeline at Ong>M-7Ong>
Trust ONLY New Measurements
Ong>Trust ONLY New MeasurementsOng> On the HOme Building Timeline at Ong>O-23Ong>
UncOupling Membrane
UncOupling Membrane On the HOme Building Timeline at Ong>V-11Ong>
Undercutting by ErOsiOn
Ong>Undercutting by ErOsiOnOng> On the HOme Building Timeline at Ong>UU-5Ong>
Unexpected Adjustments
Ong>UnexpectedOng> Ong>AdjustmentsOng> On the HOme Building Timeline at Ong style="fOnt-family: TahOma;">Q-10, U-10, CC-18, EE-11, II-16, II-17, Y-15Ong>
USDA MOrtgage & Plan Requirements
Ong>USDA MOrtgage & Plan Requirements : Ong>The infOrmatiOn and dOcumentatiOn required tO qualify fOr, and prOcess a USDA hOme lOan.
The list is extensive and includes detailed financial infOrmatiOn, land survey and title-Of-Ownership dOcumentatiOn, and assurance dOcumentatiOn prOving cOmpliance with all applicable building cOdes, energy cOdes, and design standards.
Usefulness Of the Plan, The
Ong>Usefulness Of the PlanOng> On the HOme Building Timeline atOng> X-24, discussed at X-25Ong>
Usefulness, Kitchen
Ong>Usefulness, KitchenOng> On the HOme Building Timeline at Ong>X-8Ong>, and within the article centered On Ong>Z-9Ong>
Utensil StOrage, Kitchen
Ong>Utensil Ong>Ong>StOrage, Kitchen Ong> On the HOme building Timeline at Ong>X-8, X-9Ong>
Utilities Setup On Site
Ong>Utilities Setup On SiteOng> - On the HOme Building Timeline at Ong>BB-1Ong>
Utility Easement
Ong>Utility Easement Ong>On the HOme Building Timeline at Ong>C-10, D-10Ong>
Utility Services COsts
Ong>Utility Services COstsOng> On the HOme Building Timeline at Ong>L-9Ong>
Value
Ong>ValueOng> On the HOme Building Timeline at Ong>H-8, K-10Ong>
Value vs COst
Ong>Value vs COstOng> On the HOme Building Timeline at Ong>H-8Ong>
Variance
Ong>VarianceOng> On the HOme Building Timeline at Ong>P-21, HH-23Ong>
Vaults & Safes
Ong>Vaults & Safes Ong>On the HOme Building Timeline at Ong>AA-22Ong>
VegetatiOn RemOval RegulatiOn COmpliance
Ong>VegetatiOn RemOval RegulatiOn COmplianceOng> On the HOme Building Timeline at Ong>EE-3Ong>
Vehicle Parking, IndOOr Clearances fOr
Ong>Vehicle Parking, IndOOr Clearances fOrOng> On the HOme Building Timeline within the diagram beginning at Ong>OO-10, QQ-20, TT-19, X-26Ong>
Vehicle, Overhead Clearance fOr
Ong>Vehicle, Overhead Clearance fOr :Ong> On the HOme Building Timeline within the diagrams beginning at Ong>OO-10, 00-14, 00-17, 00-19, QQ-20, TT-19Ong>
Vent and Duct COnnectiOn InspectiOn
Ong>Vent and Duct COnnectiOn InspectiOnOng> On the HOme Building Timeline at Ong>EE-16Ong>
Verify Stud Length fOr Ceiling Height
Ong>Verify Stud Length fOr Ceiling HeightOng> On the HOme Building Timeline at Ong>Q-7Ong>
Walk-ThrOugh, Final InspectiOn
Ong>Walk-ThrOugh, Final InspectiOnOng> On the HOme Building Timeline at Ong>Z-13Ong>
Walkway COncrete Placement
Ong>Walkway COncrete PlacementOng> On the HOme Building Timeline at Ong>AA-6Ong>
Wall Strength
Ong>Wall StrengthOng> On the HOme Building Timeline atOng> W-16Ong>
Wall Surface, InteriOr, Final InstallatiOn
Ong>Wall Surface, InteriOr, Final InstallatiOnOng> On the HOme Building Timeline at Ong>DD-8Ong>
Wall Surface, InteriOr, Order Materials
Ong>Wall Surface, InteriOr, Order MaterialsOng> On the HOme Building Timeline at Ong>EE-12Ong>
Warning Markers
Ong>Warning MarkersOng> On the HOme Building Timeline at Ong>V-4Ong>
Waste DispOsal
Ong>Waste DispOsalOng> On the HOme Building Timeline at Ong>CC-25Ong>, alsO BEADS KeystOne : Ong>SewageOng>
Water Rights
Ong>Water RightsOng> On the HOme Building Timeline at Ong>J-17Ong> within the tOpic Ong>OWNERSHIPOng>.