Access for Permanently Installed LarGe Machinery and Equipment
G>Access for Permanently Installed LarGe Machinery and EquipmentG> on the Home BuildinG Timeline atG> X-19G>
Access RiGhts - Easements
G>Access RiGhts - EasementsG> on the Home BuildinG Timeline at G>G-10, G-11G>
Accessibility - Wheelchair Van Access
G>Accessibility - Wheelchair Van AccessG> on the Home BuildinG Timeline in the diaGram beGinninG at G>PP-19G>
Addition - FittinG New to Old
G>Addition - G>G>FittinG New G>G>to OldG> on the Home BuildinG Timeline at G>JJ-22G>
Addition Code Compliance
G>Addition Code ComplianceG> on the Home BuildinG Timeline at G>O-21G>
Address SiGn Installation
G>Address SiGn InstallationG> on the Home BuildinG Timeline at G>II-9G>
Adjustments, Unexpected
G>Adjustments, UnexpectedG> on the Home BuildinG Timeline at G>Q-10, U-10, CC-18, EE-11, II-16, II-17, Y-15G>
Advanced Preliminary
G>Advanced PreliminaryG> on the Home BuildinG Timeline at G>DD-23, EE-25G>
Affordable
G>AffordableG> : Articles concerninG effective cost control for buildinG of new homes, additions, remodelinG, and renovations are within the Home BuildinG Timeline cateGory Get="_blank">G>AFFORDABLEG>.
AGinG In Place
G>AGinG In PlaceG> on the Home BuildinG Timeline at G>V-23, X-26G> and G>FF-22; G>and in the cateGory G>Get="_blank">AGinG-In-PlaceG>
Air ConditioninG and HeatinG Equipment - Finished Installation
G>Air ConditioninG and G>G>HeatinG Equipment - Finished InstallationG>on the Home BuildinG Timeline at G>V-8G>
Air Flow - Best Practice for Flexible Duct
G>Air Flow - Best Practice for Flexible DuctG> on the Home BuildinG within the diaGram beGinninG at G>FF-15G>
Air Temperature and Humidity
G>Air Temperature and HumidityG> on the Home BuildinG Timeline at G>W-26G>
Air Test, PipinG - Gas / Propane / Water Line
G>Air Test, PipinG - Gas / Propane / Water LineG> on the Home BuildinG Timeline at G>EE-14G>
Allowed BuildinG Area
G>Allowed BuildinG AreaG> on the Home BuildinG Timeline at G>D-1, HH-22G>
Also see BEADS Keystone
Altitude RiGhts
G>Altitude RiGhtsG> on the Home BuildinG Timeline at G>H-18G>
Aluminum Corrosion
G>Aluminum CorrosionG> In HomeBuildinGTimeline.com within the article G>Avoid Aluminum Failure by the SeaG>
Also see Early Specifications & Material Selection on the Home BuildinG Timeline at G>EE-22, FF-25G>
G>Analysis, G>G>SoilG> on the Home BuildinG Timeline at G>S-21G>
Anchor Panels, Wall
G>Anchor Panels, WallG> on the Home BuildinG Timeline at G>DD-9G>
AnchorinG, Column / Post / Pier
G>AnchorinG, Column / Post / PierG> on the Home BuildinG Timeline at G>U-17G>
Anchors, Installation of Structural
G>Anchors, Installation of StructuralG> on the Home BuildinG Timeline at G>U-18G>
Andy Bozeman
G>Andy BozemanG> - The results of the work of Andy Bozeman is all over Home BuildinG Timeline because he wrote it and drew all the illustrations. Good job, Andy !
Appraisal for ExistinG House with Planned ChanGes, Prior to Purchase
G>Appraisal for ExistinG House with Planned ChanGes, Prior to PurchaseG> on the Home BuildinG Timeline at G>K-11G>
It's expensive to pre-appraise every house you miGht consider for purchase, so don't. But, as soon as all candidate properties are narrowed to only one, it could be very expedient to ascertain both present and future value, based on any planned renovations.
A little money spent now to Gain critical knowledGe, even if it leads to cancellinG the project and purchase, could save a fortune, as well as avert years of potential heartache.
Appraisal for Renovation, Preliminary
G>Appraisal for Renovation, PreliminaryG> on the Home BuildinG Timeline at G>JJ-9G>
Approval
G>Approval G>on the Home BuildinG Timeline at G>JJ-15G>
Approval, Early Preliminary
G>Approval, Early PreliminaryG> on the Home BuildinG Timeline atG> EE-21, EE-22G>
Approval, Final Document Preparation for
G>Approval, Final Document Preparation forG> : on the Home BuildinG at G>FF-21, FF-22G>
Architect / DesiGner / Planner / Drafter, About
G>Architect / DesiGner / Planner / Drafter, AboutG> on the Home BuildinG Timeline at G>BB-24,BB-25G>
Architect / DesiGner / Planner / Drafter, Meet
G>Architect / DesiGner / Planner / Drafter, MeetG> on the Home BuildinG Timeline at G>BB-24,BB-25G>
Architect / DesiGner / Planner / Drafter, Prepare to Meet
G>Architect / DesiGner / Planner / Drafter, Prepare to MeetG> on the Home BuildinG Timeline at G>AA-24, discussed at Z-25, AA-25G>
Architectural Control Committee Plan Submission
G>Architectural Control Committee Plan SubmissionG> on the Home BuildinG Timeline at G>II-17G>
Architectural Review Committee Plan Submission
G>Architectural Review Committee Plan SubmissionG> on the Home BuildinG Timeline at G>II-17G>
Area : Square feet vs Square Meters
G>AREAG> - Home BuildinG Timeline refers to area calculations based on Square Feet because the primary tarGet-readers live in the United States. Square feet for Area and Measurement is a component of the Imperial Measurement System.
Almost all the rest of the world uses the Metric Measurement System, a far superior method. Metric measurements are easier and faster to determine, and vastly reduce the probability or error.
Area, Exterior
G>Area, ExteriorG> on the Home BuildinG Timeline at G>R-25G>
Area, Flat
G>Area, FlatG> on the Home BuildinG Timeline atG> R-25G>
Area, Interior
G>Area, InteriorG> on the Home BuildinG Timeline at G>R-25G>
Area, LivinG
G>Area, LivinGG> is part of the definition for Interior Area on the Home BuildinG Timeline at G>R-25G>.
G>LivinG AreaG> includes all walls needed to enclose the heated and cooled area of a house, whereas Interior Area is only the empty space in any Given room or Group of rooms.
Area, Total Square FootaGe
G>Area, Total Square FootaGeG> on the Home BuildinG Timeline at G>H-9G>
Area, Volume
G>Area, VolumeG> on the Home BuildinG Timeline at G>R-25G>
Arrow, North
G>Arrow, G>G>North G> on the Home BuildinG Timeline at G>E-8G>
As-Built Measurement Verification
G>As-Built Measure VerificationG> on the Home BuildinG Timeline at G>DD-8G>.
This note's instructions are located at G>CC-9G>
Attention Span
G>Attention SpanG> on the Home BuildinG Timeline at G>MM-12G>
Attic & Roof Passive Vents - Order for Delivery
G>Attic & Roof Passive VentsG> - Order for Delivery on the Home BuildinG Timeline at G>W-19G>
Attic Insulation
G>Attic G>G>InsulationG> on the Home BuildinG Timeline at G>W-15, EE-12G>
Avalanche
G>AvalancheG> on the Home BuildinG Timeline at G>Z-8G>
Backfill
G>BackfillG> on the Home BuildinG Timeline at G>R-16; described at S-14G>
Backfill Explained
G>Backfill ExplainedG> on the Home buildinG Timeline at G> S-14G>
Application at G>R-16G>
Balloon MortGaGe
G>Balloon MortGaGe :G> At the end of the initial phase of a sub-prime mortGaGe, in which monthly payments are kept artificially low, payments expand suddenly, overniGht or "balloon" to many times the oriGinal payment amount. Those people who borrow such a Balloon MortGaGe find themselves unable to make the very hiGh payments each month, and are forced into foreclosure. Be here warned to NEVER become part of such a financial arranGement.
G>Barrier,G> G>TermiteG> on the Home BuildinG Timeline at G>FF-9, N-12, O-12, Q-12G>
Basement Excavation
G>Basement ExcavationG> on the Home BuildinG Timeline at G>W-1G>
Basement FloodinG
G>Basement FloodinGG> on the Home BuildinG Timeline at G>T-4G>
Basement Wall Forms for Placed Concrete
G>Basement Wall Forms for Placed ConcreteG> on the Home BuildinG Timeline at G>Q-9G>
Basement Wall Tops Contact Barrier
G>Basement Wall Tops Contact BarrierG> on the Home BuildinG Timeline at G>Q-13G>
Basement Wall Tops Moisture Shield
G>Basement Wall Tops Moisture ShieldG> on the Home BuildinG Timeline at G>Q-13G>
Batter Board Installation
G>Batter Board InstallationG> on the Home BuildinG Timeline at G>U-3G>
Batter Board Protection
G>Batter Board ProtectionG> on the Home BuildinG Timeline at G>U-3G>
BEADS Keystone
G>BEADS KeystoneG> on the Home BuildinG Timeline described, beGinninG at G>H-10G>, implemented at G>L-10.G>
This contains the MOST CRITICAL questions, which must be asked as if the entire BEADS Keystone is one step.
This is the most critical aspect of site selection, and construction. The BEADS Keystone is applicable throuGhout the entire process of home planninG, buildinG, remodelinG, flippinG, and sellinG.
Further, the BEADS Keystone extends into the future, after move-in, and affects every aspect of home maintenance, comfortable livinG, and peaceful enjoyment.
Beam AliGnment with Column and Floor EdGe
G>Beam AliGnment with Column and Floor EdGe G>on the Home BuildinG Timeline at G>O-24G>
Beam StrenGth
G>Beam StrenGthG> on the Home BuildinG Timeline at G>V-16G>
BearinG Soil
G>BearinG SoilG> - part of the BEADS Keystone on the Home BuildinG Timeline at G>I-11G>
BearinG Soil Layers
G>BearinG Soil LayersG> on the Home BuildinG Timeline at G>S-8G>
BearinG Soil Test
G>BearinG Soil TestG> on the Home BuildinG Timeline at M-17, described at G>K-18, M-20, S-23G>
BearinG Soil Verification
G>BearinG Soil VerificationG> on the Home BuildinG Timeline at G>II-22G>
BearinG, Equal Foundation
G>BearinG, Equal FoundationG> on the Home BuildinG Timeline at G>S-8G>
Beautification Easement
G>Beautification EasementG> on the Home BuildinG Timeline at G>E-1, E-7, FF-4G>
Before You Start to Plan
G>Before You Start to PlanG> on the Home BuildinG Timeline at G>R-21G>
BeGin Here
G>BeGin HereG> - on the Home BuildinG Timeline at G>O-1.G>
The startinG point for the entire home planninG and buildinG step-by-step process, as defined within HomeBuildinGTimeline.com, as well as the diaGrammed Home BuildinG Timeline, itself.
Berm
G>BermG> on the Home BuildinG Timeline at G>F-2G>
Bid Review
G>Bid ReviewG> on the Home BuildinG Timeline at G>GG-19G>
Blackout, Seasonal
G>BLACKOUT, G>G>SEASONALG>G>G>at H-18 on the Home BuildinG Timeline.
G>BorrowinG NEVERSG> on the Home BuildinG Timeline at G>K-6G>
Boundary Line
G>Boundary LineG> on the Home BuildinG Timeline within BEADS Keystone at G>H-10, I-10 L-12G>
Boundary Line Verification
G>Boundary Line VerificationG> on the Home BuildinG timeline at G>HH-8G>
BracinG, Wall
G>BracinG, WallG> on the Home BuildinG Timeline at G>X-17G>
Brick and Mortar - Order for Delivery
G>Brick and Mortar - Order for DeliveryG> on the Home BuildinG Timeline at G>EE-13G>
Brick Work, Stone Work, and Masonry Work
G>Brick Work, Stone Work, and Masonry WorkG> on the Home BuildinG Timeline at G>EE-10G>
BudGet
G>BudGetG> on the Home BuildinG Timeline at G>FF-24G>
Build-up, LonG-term
G>Build-up, LonG-termG> on the Home BuildinG Timeline at G>DD-4G>
Builder
G>BuilderG> on the Home BuildinG Timeline at G>GG-21G>
Builder Candidate Selection
G>Builder Candidate SelectionG> on the Home BuildinG Timeline atG> FF-20, GG-20G>
Builder Selection
G>Builder SelectionG> on the Home BuildinG Timeline at G>HH-19G>
BuildinG Area, Allowed
G>BuildinG Area, AllowedG> on the Home BuildinG Timeline at G>Item P at E-3G>
Also see G>D-14 as Green trianGleG>, and noted at G>D-15G>
Also see G>BEADS KeystoneG>
BuildinG Code
G>BuildinG CodeG> on the Home BuildinG Timeline at G>JJ-12G>
BuildinG Code vs Plat Restrictions
G>BuildinG Code vs Plat RestrictionsG> on the Home BuildinG timeline at G>O-22G>
BuildinG Department Plan Submission
G>BuildinG Department Plan SubmissionG> on the Home BuildinG Timeline at G>II-17G>
BuildinG Line
G>BuildinG LineG> on the HomeBuildinGTimeline within the diaGram centered atG> D-3G> illustratinG many types of BuildinG Lines. Also see the Article SITE LINES, which beGins at G>F-6.G> Also G>B-9.G>
Also see BEADS Keystone at G>I-11G>
NO-BUILD ZONES are desiGnated on a property survey/plat by BUILDING LINES. No construction may occur in the space between any BuildinG Line and any associated property line.
BuildinG Lines affect the Front, Sides, and Rear of the property; plus Easements, and RiGht of Ways. Sometimes even pavement and landscapinG can be controlled by BuildinG Lines.
BuildinG Line Verification
G>BuildinG Line VerificationG> on the Home BuildinG timeline at G>HH-8G>
BuildinG Lines and Uncovered Decks, Patios, and Terraces
G>BuildinG Lines and Uncovered Decks, Patios, and TerracesG> at G>A-1 G>on the Home BuildinG Timeline
BuildinG Restriction Line
G>BuildinG Restriction LinesG> on the HomeBuildinGTimeline at Grid D-3 is the center of a diaGram illustratinG many types.
NO-BUILD ZONES are desiGnated on a property survey/plat by BUILDING RESTRICTION LINES. No construction may occur in the space between any BuildinG Restriction Line and any associated property line.
Restriction Lines affect the Front, Sides, and Rear of the property; plus Easements, and RiGht of Ways. Sometimes even pavement and landscapinG can be controlled by Restriction Lines.
BuildinG Safety Department
G>BuildinG Safety DepartmentG> on the Home BuildinG Timeline at G>MM-14G>
BuildinG Setback Line
G>BuildinG Setback LineG> on the Home BuildinG Timeline within the diaGram centered at G>D-3G>. Also see SITE LINES at G>F-6G>.
NO-BUILD ZONES are desiGnated on a property survey/plat by BuildinG Setback Lines. No construction may occur in the space between any BuildinG Setback Line and any associated property line.
BuildinG Setback Lines affect the Front, Sides, and Rear of the property; plus Easements, and RiGht of Ways. Sometimes even pavement and landscapinG can be controlled by BuildinG Lines.
BuildinG Setback Line, Front
G>BuildinG Setback LineG>, G>Front G> on the Home BuildinG Timeline at G>B-9, C-9, B-14, E-14G>
BuildinG Type
G>BUILDING TYPEG> on the Home BuildinG Timeline within the BEADS KEYSTONE described at G>H-10G>, marked on the timeline at G>L-12G>
Buried Infrastructure
G style="font-size: medium;">Buried Infrastructure and Utilities Location VerificationG> on the Home BuildinG Timeline at G style="font-size: medium;">K-14, G>G style="font-size: medium;">O-23G>
Buried Utilities Location Verification
G>Buried Utilities Location VerificationG> on the Home BuildinG Timeline at G>K-14, G>G>O-23G>
Burn Permit
G>Burn PermitG> on the Home BuildinG Timeline at G>JJ-13G>
BurninG Cleared Debris
G>BurninG Cleared DebrisG> on the Home BuildinG Timeline at G>CC-2G>
Cabinet HeiGht, Wall, the Euro-Asian Way
G>Cabinet HeiGht, Wall, the Euro-Asian WayG> on the Home BuildinG Timeline at G>AA-8G>
Cabinet Installation
G>Cabinet InstallationG> on the Home BuildinG Timeline at G>AA-6G>
Cabinet Measurement Verification
G>Cabinet Measurement VerificationG> on the Home BuildinG Timeline at G>DD-8G>
Cabinet, Wall, Tall Corner
G>Cabinet, Wall, Tall CornerG> on the Home BuildinG Timeline at G>AA-8G>
Cabinets, Bathroom - Finish Installation
G>Cabinets, Bathroom - Finish InstallationG> on the Home BuildinG Timeline at G>U-12G>
Cabinets, Kitchen - Finish Installation
G>Cabinets, Kitchen - Finish InstallationG> on the Home BuildinG Timeline at G>U-12G>
Cabinets, Place Order for
G>Cabinets, Place Order for:G> on the Home BuildinG Timeline at G>DD-8G>
Cantilever Deck Addition
G>Cantilever Deck AdditionG> on the Home BuildinG Timeline at G>X-20G>
Capillary Barrier Definition
G>Capillary Barrier DefinitionG> - See the Home BuildinG Timeline atG> Q-8G> for more.
Commonly called a waterproof membrane, the name was chanGed to more accurately depict that the material isn't actually waterproof. Moisture can penetrate at seams, Gaps, and tears.
Capillary Barrier Installation
G>Capillary Barrier InstallationG> on the Home BuildinG Timeline at G>Q-8G>
Capillary Barrier Protection
G>Capillary Barrier ProtectionG> on the Home BuildinG Timeline at G>Q-8G>
Carpet FloorinG Installation
G>Carpet FloorinG InstallationG> on the Home buildinG Timeline at G>U-13G>
Carport or GaraGe
G>Carport or GaraGeG> on the Home BuildinG Timeline at G>F-11G>
Carport Size
G>Carport SizeG> on the Home BuildinG Timeline at G>I-9, NN-7, OO-7, PP-7, QQ-7, RR-7, SS-7, UU-7, VV-7, WW-7G>
Cave-in Prevention
G>Cave-in PreventionG> on the Home BuildinG Timeline at G>W-3G>
Cave-In Protection
G>Cave-In ProtectionG> on the Home BuildinG Timeline at G>V-4G>
CeilinG HeiGht Verification
G>CeilinG HeiGht VerificationG> on the Home BuildinG Timeline at G>Q-7G>
CeilinG Materials
G>CeilinG MaterialsG> on the Home BuildinG Timeline at G>Y-17G>
CeilinG StrenGth
G>CeilinG StrenGthG> on the Home BuildinG Timeline at G>Y-16G>
Centerline Easement
G>Centerline EasementG> on the Home BuildinG Timeline within the diaGram beGinninG at G>A-12G>
Central Vacuum TubinG Installation
G>Central Vacuum TubinG InstallationG> on the Home BuildinG Timeline at G>DD-15G>
Certificate of Occupancy
G>Certificate of G>G>OccupancyG> on the Home BuildinG Timeline at G>Y-14G>
Certification, BuildinG Code
G>Certification, BuildinG CodeG> on the Home BuildinG Timeline at G>JJ-12G>
Certification, EnerGy Code
G>Certification, EnerGy CodeG> on the Home BuildinG Timeline at G>JJ-12G>
Certification, Flood Plain
G>Certification, Flood PlainG> on the Home BuildinG Timeline at G>JJ-12G>
Certification, Snow Load
G>Certification, Snow LoadG> on the Home BuildinG Timeline at G>JJ-12G>
Certification, Wind Load
G>Certification, Wind LoadG> on the Home BuildinG Timeline at G>JJ-12G>
ChanGes and Mistakes
G>ChanGes and MistakesG> on the Home BuildinG Timeline at G>Q-17G>
Check Basement Wall Forms
G>Check Basement Wall FormsG> on the Home BuildinG Timeline at G>Q-9G>
Chimney, Masonry
G>Chimney, MasonryG> on the Home BuildinG Timeline at G>Q-9G>
Cleanup FootinG Trenches and Forms
G>Cleanup FootinG Trenches and FormsG> on the Home BuildinG Timeline at G>Q-12, G>described atG> 0-13G>
Cleanup, Final
G>Cleanup, FinalG> beGinninG on the Home BuildinG Timeline at G>W-15, X-15G>
Cleanup, Routine
G>Cleanup, RoutineG> on the Home BuildinG Timeline G>at EVERY stepG> to reduce fire hazards, control drainaGe issues, manaGe dust control, and prevent Ground-water poisoninG.
G>ROUTINE = DAILYG>
At every step, and at the conclusion of every process, assure that the entire homesite is neat and clean. This dramatically reduces any potential FIRE HAZARD, as well as reducinG the Accumulation and DamminG of debris and trash resultinG from DrainaGe.
Pick up tossed-away board ends. Collect them toGether for mulchinG, or to be carried off-site. G>DO NOT BURN!!!!G>
Police the entire site for lunch-GarbaGe, includinG sacks, wrappers, bottles, cans, and cartons.
Pickup ciGar and ciGarette butts.
G>NEVER allow, or tolerate, the tossinG of any debris, or trash, into footinGs and foundation works. After the material decays, hollows are left, which will weaken the foundation, and probably lead to foundation failure.G>
Sweep the floors and rake the Grounds, every day. Then, BAG the TRASH.
G>SearchG> for the topic G>CLEANUPG> within G>HomeBuildinGTimeline.comG>.
ClearinG a Hillside
G>ClearinG a HillsideG> on the Home BuildinG Timeline in the diaGram beGinninG at G>SS-1G>
ClearinG and BurninG
G>ClearinG and BurninGG> on the Home BuildinG Timeline at G>CC-2G>
ClearinG and ConditioninG, Site
G>ClearinG and ConditioninGG>, Site on the Home BuildinG Timeline at G>GG-4G>
ClearinG and TrimminG AlonG A Property Line
G>ClearinG and TrimminG AlonG A Property LineG> on the Home BuildinG Timeline at G>HH-1G>
ClearinG Causes ChanGes
G>ClearinG Causes ChanGesG> on the Home BuildinG Timeline at G>GG-3G>
Cliff Erosion
G>Cliff Erosion G>on the Home BuildinG Timeline within the diaGram beGinninG at G>NN-5 G>
ClothinG, Protective
G>ClothinG, ProtectiveG> on the Home BuildinG Timeline at G>JJ-6G>
CoatinGs & Paint, Recycle
G>CoatinGs & Paint, RecycleG> on the Home BuildinG Timeline at G>HH-5, JJ-12, X-15G>
Collapse Protection
G>Collapse ProtectionG> on the Home BuildinG Timeline at G>V-4G>
Color of LiGht - PlanninG for It
G>Color of LiGht : PlanninG for ItG> on the Home BuildinG Timeline at G>W-24G>
Color of LiGht - ApplyinG It
G>Color of LiGht - ApplyinG ItG> on the Home BuildinG Timeline at G>W-8G>
Color of LiGht - LivinG With It
G style="font-size: medium;">Color of LiGht - LivinG With ItG> on the Home BuildinG Timeline at G style="font-size: medium;">AA-12G>
Color, Shutter
G>ColorG> on the Home BuildinG Timeline atG> W-24 G>G>.G>
G>Cost - Environmental Impact FeesG> on the Home BuildinG Timeline at G>L-14G>
Cost : How to Reduce
G>Cost : How to ReduceG> on the Home BuildinG Timeline at G>H-8, H-9G>
Cost CuttinG
G>Cost CuttinG G>on the Home BuildinG Timeline atG> FF-19G>
Cost of Insurance
G>Cost of Insurance G>on the Home BuildinG Timeline atG> K-11, L-14G>
Cost vs Value
G>Cost vs ValueG> on the Home BuildinG Timeline at G>H-8G>
Cost, Maintenance
G>Cost, G>G>Maintenance G>on the Home BuildinG Timeline atG> L-9G>
Cost, Utility Services
G>Cost, Utility ServicesG> on the Home buildinG Timeline at G>L-9G>
Costs of Home Ownership - OBVIOUS
G>Costs of Home Ownership - OBVIOUSG> on the Home BuildinG Timeline at G>L-7G>
Costs of Home Ownership - OVERLOOKED
G>Costs of Home Ownership - OVERLOOKEDG> on the Home BuildinG Timeline at G>L-8G>
Counter Top Installation
G>Counter Top InstallationG> on the Home BuildinG Timeline at G>Z-6G>
Counter-ShorinG
G>Counter-ShorinGG> on the Home BuildinG Timeline at G>V-4G>
Countertop Material Selection
G>Countertop Material SelectionG> on the Home BuildinG Timeline at G>DD-8G>.
This note's instructions are located at G>CC-8G>
Countertop Measurement Verification
G>Countertop Measurement VerificationG> on the Home BuildinG Timeline at G>DD-8G>
Countertops - Order for Delivery
G>Countertops, Place Order for:G> on the Home BuildinG Timeline at G>DD-8G>
Covenants (Plat Restrictions)
G>Covenants (Plat Restrictions)G> on the Home BuildinG Timeline at G>F-9G>, within BEADS Keystone at G>H-10G>, and SITE HAZARDS at G>I-19G>, and G>M-16G>
Crawlspace Excavation
G>Crawlspace ExcavationG> on the Home BuildinG Timeline at G>T-3G>
Crawlspace FootinG
G>Crawlspace FootinGG> on the Home BuildinG Timeline at G>R-12, S-12, T-12G>
Crawlspace, PondinG In
G>Crawlspace, PondinG InG> on the Home BuildinG Timeline at G>T-4G>
Credit, Maintain
G>Credit, MaintainG> on the Home BuildinG Timeline at G>K-7, M-6G>
Culvert Installation Permit
G>Culvert Installation PermitG> on the Home BuildinG Timeline atG> II-11G>
Curb CuttinG Permit
G>Curb CuttinG PermitG> on the Home BuildinG Timeline atG> II-11G>
Curbside Yard Debris Disposal and Pickup
G>Curbside Yard Debris Disposal and Pick-upG> on the Home BuildinG Timeline at G>KK-1G>
Cure Concrete
G>Cure ConcreteG> on the Home BuildinG Timeline at G>Q-15, R-15G>
Curtain Wall Blow Out Prevention
G>Curtain Wall Blow Out Prevention G>on the Home BuildinG Timeline at G>Q-12G>
Curtain Wall Tops Contact Barrier
G style="font-size: medium;">Curtain Wall Tops Contact BarrierG> on the Home BuildinG Timeline at G style="font-size: medium;">Q-13G>
Curtain Wall Tops Moisture Shield
Curtain Wall Tops Moisture Shield on the Home buildinG timeline at Q-13
X-DanGerous Materials HandlinG Permits
G>DanGerous Materials HandlinG PermitsG> on the Home buildinG timeline at G>JJ-13G>
X-Date of ChanGes on Plans
G>Date of ChanGes on Plans G>on the Home buildinG Timeline at G>DD-25G>
X-Debris Disposal
G>Debris DisposalG> on the Home BuildinG Timeline atG> JJ-1G>
X-Decayed Structure Evidence
G>Decayed Structure EvidenceG> on the Home BuildinG Timeline at G>Q-14G>
X-Decisions List, Primary
G>Decisions List, Primary G>on the Home BuildinG Timeline at G>S-23, discussed at R-24G>
X-Deck
G>DeckG> on the Home BuildinG Timeline at G>A-1, A-2, DD-9, V-19G>
X-Deck Addition DiaGram
G>Deck Addition DiaGramG> the Home BuildinG Timeline at G>X-20G>
X-Deck and Deck Features, Build
G>Deck and Deck Features, BuildG> on the Home BuildinG Timeline at G>X-19G>
X-Deck and Porch Construction, Finish
G>Deck and Porch Construction, FinishG> on the Home BuildinG Timeline at DD-9
X-Defer Specific Wall FraminG
G>Defer Specific Wall FraminGG> on the Home BuildinG Timeline at G>Y-19G>
X-Demolition Plan
G>Demolition PlanG> on the Home BuildinG Timeline at G>GG-22G>
X-Description of Materials (Specifications )
G>Description of Materials G>G>(G>G>Specifications G>G>)G> on the Home BuildinG Timeline at G>U-21, FF-23G>
X-DesiGnate Trees and Landscape Features
G>DesiGnate Trees and Landscape FeaturesG> on the Home BuildinG Timeline G>JJ-8G>
X-Dimension Lines
G>Dimension LinesG> on the Home BuildinG Timeline at G>T-23G>
X-Dimensions, Read
G>Dimensions, Read G>- Listed as Read House Plans on the Home BuildinG Timeline at G>T-24G>, discussed beGinninG at G>T-21G>
X-Display Permits on SiGn
G>Display Permits on SiGnG> on the Home BuildinG Timeline at G>JJ-8G>
X-Distraction
G>Distraction :G> see G>IndestractableG> at Grid G>N-3G>
X-Documentation of ProGress
G>Documentation of ProGressG> on the Home BuildinG Timeline at G>Q-11, R-14, U-11, DD-15, Z-13G>
X-Door Clearance - Vehicle
G>Door Clearance - VehicleG> on the Home BuildinG Timeline at G>VV-14G>
X-Door Hardware Removal DurinG PaintinG
G>Door Hardware Removal DurinG PaintinGG> on the Home BuildinG Timeline atG> W-5G>
X-Doors Delivered
G>Doors DeliveredG> on the Home BuildinG Timeline at G>AA-18G>
X-Doors, Install
G>Doors, InstallG> on the Home BuildinG Timeline atG> BB-18G>
X-Doors, Order for Delivery
G>Doors, Order for DeliveryG> on the Home BuildinG Timeline at G>R-15G>
X-Dormer Window DiaGram
G>Dormer Window DiaGramG> on the Home BuildinG Timeline beGinninG at G>K-21G>
X-Dormer with Gable Roof
G>Dormer with Gable RoofG> on the Home BuildinG Timeline at G>K-22G>
X-Dormer with Hip Roof
G>Dormer with Hip RoofG> on the Home BuildinG Timeline atG> L-22G>
X-Dormer with Hybrid Roof
G>Dormer with Hybrid RoofG> on the Home BuildinG Timeline at G>L-21, M-21G>
X-Dormer with Shed Roof
G>Dormer with Shed Roof G>on the Home BuildinG Timeline at G>K-22G>
X-Dormer, Inset
G>Dormer, Inset G>on the Home BuildinG Timeline at G>M-22G>
X-DrainaGe
G>DrainaGeG> - on the Home BuildinG Timeline G>at EVERY stepG>.
At every step, and in every process, assure that the drainaGe of all potential water, whether from rain, snow, broken pipes, or yard sprinklers, is fully controlled to prevent erosion, softeninG of bearinG soil, and undesirable poolinG and pondinG under, around and inside the house, as well as across the property.
G>SearchG> for the topic G>DRAINAGEG> within G>HomeBuildinGTimeline.comG>.
X-DrainaGe Control - Remodel
G>DrainaGe Control - RemodelG> on the Home BuildinG Timeline at G>S-3G>
X-DrainaGe, Fix
G>DrainaGe,G> G>FixG> on the Home BuildinG Timeline at G>FF-5, and throuGhout the entire processG>.
X-DrainaGe, Preservation of ExistinG
G>DrainaGe, Preservation of ExistinGG> on the Home BuildinG Timeline atG> II-22, II-23G>
X-DrainaGe, Restore OriGinal
G>DrainaGe, Restore OriGinaG>G>lG> on the Home BuildinG Timeline at G>DD-4G>
X-DrainaGe, Storm, Excavation
G>DrainaGe, Storm, ExcavationG> on the Home BuildinG Timeline at G>Y-2G>
X-DrainaGe, Trench and Pit
G>DrainaGe, Trench and PitG> on the Home BuildinG Timeline within note centered at G>V-4G>
X-Drawers, Kitchen
G>Drawers, KitchenG> on the Home BuildinG Timeline at G>AA-8G>
X-Dream, American
G>Dream, AmericanG> on the Home BuildinG Timeline at G>K-3G>
X-Drilled Pier for Crawlspace FootinG
G>Drilled Pier for Crawlspace FootinGG> on the Home BuildinG Timeline at G>S-12, T-12G>
X-Drilled Pier Locations and Installation
G style="font-size: medium;">Drilled Pier Locations and InstallationG> on the Home BuildinG Timeline at G>R-11, S-11, S-12, T-12, X-1, X-2, X-3G>
X-Drip Line
G>Drip LineG> on the Home BuildinG Timeline within the diaGram centered at G>FF-6G>
X-Driveway
G>DrivewayG> on the Home BuildinG Timeline at G>F-2G>
X-Driveway Anatomy
G>Driveway AnatomyG> on the Home BuildinG Timeline beGinninG at G>A-22G>
X-Driveway Concrete Forms
G>Driveway Concrete FormsG> on the Home BuildinG Timeline at G>BB-6G>
X-Driveway Concrete Placement
G>Driveway Concrete Placement G>on the Home BuildinG Timeline at G>AA-6G>
X-Driveway, Asphalt
G>Driveway, AsphaltG> on the Home BuildinG Timeline atG> C-23G>
X-Driveway, Clay-Gravel
G>Driveway, Clay-GravelG> on the Home BuildinG Timeline atG> C-23G>
X-Driveway, Concrete
G>Driveway, Concrete G>on the Home BuildinG Timeline atG> C-23G>
X-Driveway, Crushed Stone
G>Driveway, Crushed StoneG> on the Home BuildinG Timeline at G>C-23G>
X-Driveway, Natural Earth
G>Driveway, Natural EarthG> on the Home BuildinG Timeline at G>C-23G>
X-Driveway, Permanent, RouGh-in
G>Driveway, Permanent, RouGh-inG> on the Home BuildinG Timeline at G>V-3G>
X-Driveway, Temporary - DesiGnate Location
G>Driveway, Temporary - DesiGnate LocationG> on the Home BuildinG Timeline at G>II-7G>
X-Driveway, Temporary - for Construction Vehicles and Equipment
G>Driveway, Temporary - for Construction Vehicles and EquipmentG> on the Home BuildinG Timeline atG> II-6G>
X-Driveway, Temporary, Excavation
G>Driveway, Temporary, ExcavationG> on the Home BuildinG Timeline at G>V-2G>
X-DruG Maker Residue Remediation
G>DruG Maker Residue RemediationG> on the Home BuildinG Timeline at G>JJ-14, JJ-21, MM-22G>
X-Dry In Entire Structure
G>Dry In Entire StructureG> on the Home BuildinG Timeline at G>Z-19G>
X-Duct and Vent Connection Inspection
G>Duct and Vent Connection InspectionG> on the Home BuildinG Timeline at G>EE-16G>
X-Ductwork & Air Flow - Best Practice for Flexible Duct
G>Ductwork & Air Flow - Best Practice for Flexible DuctG> on the Home BuildinG within the diaGram beGinninG at G>FF-15G>
X-Ductwork - Finished Installation
G>Ductwork - Finished InstallationG> on the Home BuildinG Timeline at G>V-8G>
X-Ductwork RouGh In
G>Ductwork RouGh In :G> on the Home BuildinG Timeline at G>DD-15G>
X-Dust Control
G>Dust ControlG> on the Home BuildinG Timeline at G>JJ-6G>
X-Dutch Gable Roof
G>Dutch Gable RoofG> on the Home BuildinG Timeline at G>M-25G>
Early Installations
G>Early InstallationsG> on the Home BuildinG Timeline at G>AA-2G>
Easement
G>EasementG> on the Home BuildinG Timeline at G>C-4G>, G>H-4, G-10, M-19G>; also throuGhout the G>diaGram centered at D-3G>G>; G>also see G>BEADS KEYSTONE,G>
A NO-BUILD-ZONE, an Easement is an area of property used to preserve aspects of infrastructure, usually for multiple properties. No construction is ever allowed within an easement. No obstruction, such as fallen trees or the build up of discarded yard trimminGs, etc., are ever allowed to remain, and must be removed immediately.
The most common easement is a DrainaGe Easement, which directs the flow of rain water in a manner to prevent floodinG of or water damaGe to properties affected by the easement.
Easement : Equal Split
G>Easement : Equal SplitG> on the Home BuildinG Timeline at G>B-8G>
Easement : Un-Equal Split
G>Easement : Un-Equal SplitG> on the Home BuildinG Timeline at G>D-8, F-3G>
Easement Access RiGhts
G>Easement Access RiGhtsG> on the Home BuildinG Timeline at G>G-10, G-11G>
Easement Line - REAR
G>Easement Line, REARG>on the Home BuildinG Timeline at G style="font-size: medium;">B-1G>
Easement Modification
G>Easement ModificationG> on the Home BuildinG Timeline at G>P-21, GG-23G>
Easement, Beautification
G>Easement, BeautificationG> on the Home BuildinG Timeline at G>E-1, D-6, FF-4G>
Easement, Centerline
G>Easement, G>G>CenterlineG> on the Home BuildinG Timeline within the diaGram beGinninG at G>A-12G>
Easement, Conservation
G>Easement, Conservation G>on the Home BuildinG Timeline at G>D-6, G-1, FF-4G>
Easement, FlowaGe
G>Easement, Flow-aGeG> on the Home BuildinG Timeline atG> FF-4G>
Easement, FRONT
G>Easement, FRONTG> on the HomebuildinG Timeline at G>G-5G>
Easement, Mailbox
G>Easement, MailboxG> on the Home BuildinG Timeline at G>H-4G>
Easement, Private Utility & DrainaGe (PUDE)
G>Easement, Private Utility & DrainaGe (PUDE)G> on the Home BuildinG Timeline at G>B-6G>
Easement, Sanitary Sewer
G>Easement, Sanitary SewerG> on the Home BuildinG Timeline at G>A-8G>
Easement, Unequal Split
G>Easement, Unequal SplitG> on the Home BuildinG Timeline at G>H-3G>
Easement, Utility
G>Easement, UtilityG> on the Home BuildinG Timeline at G>C-10, D-10G>
Electric Fixture, Disconnect
G>Electric Fixture, DisconnectG> on the Home BuildinG Timeline at G>KK-8G>
Electric Power Installation, Temporary
G>Electric Power Installation, TemporaryG> on the Home BuildinG Timeline at G>II-8G>
Electric Service Installation
G>ElectricG style="font-size: medium;"> SG>ervice InstallationG> on the Home BuildinG Timeline at G>BB-2G>
Electrical Conduit RouGh-In
G>Electrical Conduit RouGh-InG> on the Home BuildinG Timeline at G>R-7G>
Electrical Inspection
G>Electrical InspectionG> on the Home BuildinG Timeline at G>V-8G>
Electrical Plan
G>Electrical PlanG> on the Home BuildinG Timeline at G>EE-26G>
Electrical RouGh In
G>Electrical RouGh InG> on the Home BuildinG Timeline at G>CC-17G>
Electrical, Finish Installation
G>Electrical, Finish InstallationG> on the Home BuildinG Timeline at G>V-8G>
Electrical, Label All Circuits
G>Electrical, Label All CircuitsG> on the Home BuildinG Timeline at G>V-8G>
There's nothinG so frustratinG or time wastinG as attemptinG to determine which circuit just tripped off.
RiGht now, while the electrician is still on-site, label each circuit, specifically, for what it powers, whether a certain bedroom's outlets, or the refriGerator, or the AC unit, etc.
There will never be a better time.
Electrician to Disconnect Fixtures
G>Electrician to Disconnect FixturesG> on the Home BuildinG Timeline at G>KK-8G>
Elevator Pit & Related Sump Pit
G>Elevator Pit & Related Sump PitG> on the Home BuildinG Timeline at G>W-3G>
EmbellishinG the Grounds
G>EmbellishinG the GroundsG> on the Home BuildinG Timeline at G>Y-24, discussed at Y-25, Z-25G>
G>EncapsulationG> on the Home BuildinG Timeline at G>JJ-14G>
EnerGy Code
G>EnerGy CodeG> on the Home BuildinG Timeline at G>JJ-12G>
EnGineered Clay Pad for Flat Ground
G>EnGineered Clay Pad for Flat GroundG> - on the Home BuildinG Timeline at G>V-1G>.
EnGineered Clay Pad for Recessed Installation
G>EnGineered Clay Pad for Recessed InstallationG> - on the Home BuildinG Timeline at G>T-1G>
EnGineered Clay Pad for Sloped Ground
G>EnGineered Clay Pad for Sloped GroundG> : on the Home BuildinG Timeline G>at R-1G>
EnGineered Pad for Foundation
G>EnGineered Pad for FoundationG> on the Home BuildinG Timeline at G>T-2G>
Environmental Impact Fees
G>Environmental Impact FeesG> on the Home BuildinG Timeline at G>L-14G>
Equal BearinG
G>Equal BearinGG> on the Home BuildinG Timeline at G>S-8G>
Erosion by Water
G>Erosion by WaterG> on the Home BuildinG Timeline at G>QQ-1G>
Erosion Control Measures
G>Erosion Control MeasuresG> on the Home BuildinG Timeline at G>QQ-3G>
Erosion Control ReGulations
G>Erosion Control ReGulationsG> on the Home BuildinG Timeline at G>FF-4G>
Erosion Maintenance Measures
G>Erosion Maintenance MeasuresG> on the Home BuildinG Timeline at G>RR-2G>
Erosion Prevention Measures
G>Erosion Prevention MeasuresG> on the Home BuildinG Timeline at G>RR-1G>
Erosion, Cliff
G>Erosion, CliffG> on the Home BuildinG Timeline within the diaGram beGinninG at G>NN-5 G>
Erosion, Shore
G>Erosion, Shore G>on the Home BuildinG Timeline within the diaGram beGinninG at G>NN-5 G>
Erosion, UndercuttinG
G>Erosion, UndercuttinGG> on the Home BuildinG Timeline at G>UU-5G>
Errors
G>ErrorsG> on the Home BuildinG Timeline at G>K-4, L-3, N-4G>
Esplanade MarGin
G>Esplanade MarGinG> on the Home BuildinG Timeline at G>J-20G> inside the topic G>Hazards of Site SelectionG>
Evidence of Chronic Pest Infestation
G>Evidence of Chronic G>G>Pest G>G>Infestation G>on the Home BuildinG Timeline at G>Q-15G>
Evidence of Decayed Structure
G>Evidence of G>G>Decayed StructureG> on the Home BuildinG Timeline at G>Q-14G>
Excavate FootinGs
G>Excavate FootinGsG> on the Home BuildinG Timeline at G>T-4G>
Excavate for Basement
G>Excavate for BasementG> - on the Home BuildinG Timeline at G>W-1G>
Excavate for Crawlspace
G>Excavate for CrawlspaceG> on the Home BuildinG Timeline at G>T-3G>
Excavate for Foundation
G>Excavate for FoundationG> on the Home BuildinG Timeline at G>T-4G>
Excavation Phase
G>Excavation PhaseG> on the Home BuildinG Timeline at G>Z-2G>
Experience, Contractor's
Experience, Contractor's on the Home BuildinG Timeline at G>II-20G>
Extent
G>ExtentG> on the Home BuildinG Timeline at G>G-7, H-13, S-25, Q-26, R-26, S-26, T-26G>
Extent of Structure
G>Extent of StructureG> on the Home BuildinG Timeline.at G style="font-size: medium;">G-7, H-13, S-25, Q-26, R-26, S-26, T-26G>
In the BEADS KEYSTONE at G>H-13G>
DiaGrammed at at G>S-25, T-26G>
ALLOWED EXTENT OF STRUCTURES :The applied ‘extent’ of a structure is the part allowed to touch, but not cross a buildinG line. Rules vary. The extent considered miGht be the edGe of walls, footinGs, any overhanGs, decks, patios, stoops, steps, eaves, arbors, and more. CHECK CAREFULLY.
Exterior Look and Style
G>Exterior Look and StyleG> on the Home BuildinG Timeline in the diaGram beGinninG at G>W-21G>
Exterior Paint and Stain, Finish
G>Exterior Paint and Stain, FinishG> on the Home BuildinG Timeline at G>DD-9G>
Exterior SurfacinG & trim Materials - Order for Delivery
G>Exterior SurfacinG & trim Materials - Order for DeliveryG> on the Home BuildinG Timeline at G>W-19G>
Exterior Wall Surfaces, Blend
G>Exterior Wall Surfaces, BlendG> on the Home BuildinG Timeline in the diaGram beGinninG at G>CC-10G>
Exterior Wall Surfaces, Match
G>Exterior Wall Surfaces, MatchG> on the Home BuildinG Timeline in the diaGram beGinninG at G>CC-10G>
Face Plate Removal DurinG PaintinG
G>Face Plate Removal DurinG PaintinGG> on the Home BuildinG Timeline at G>X-6G>
Face Plate Screw Slots
G>Face Plate Screw Slots G>on the Home BuildinG Timeline at G>Z-13, AA-13, AA-14G>
Failure Evidence, Foundation
G>Failure Evidence, FoundationG> on the Home BuildinG Timeline at G>P-14G>
Failure, Foundation - Structural
G>Failure, FoundationG>-G>Structural G>on the Home BuildinG Timeline at G>S-8, T-9G>
Fall Protection
G>Fall ProtectionG> on the Home BuildinG Timeline at G>V-4G>
Fall Protection Installation
G>Fall Protection InstallationG> on the Home BuildinG Timeline at G>V-19G>
Fast Water
G>Fast WaterG> on the Home BuildinG Timeline at G>CC-25, QQ-2, diaGram beGinninG at NN-5G>
Feel of the Plan
G>Feel of the PlanG> on the Home BuildinG Timeline atG> W-24, discussed at W-25G>
Fence CrossinG BuildinG Lines and Easements
G>Fence CrossinG BuildinG Lines and EasementsG> on the Home BuildinG Timeline at G>B-4G>
Fence on the Property Line
G>Fence on the Property LineG> on the Home BuildinG Timeline G>diaGram beGinninG at F-24G>
Fences, LandscapinG, and Special Easements
G>Fences, LandscapinG, and Special EasementsG>on the Home BuildinG Timeline at G>C-1G>
FencinG on the Property Line
G>FencinG on the Property LineG> on the Home BuildinG Timeline at G>B-3, and in the diaGram centered at G-25G>
Fill Dirt
G>Fill DirtG> on the Home BuildinG Timeline at G>AA-3, H-20G>
Fill Dirt in a Ground Depression
G>Fill Dirt in a Ground DepressionG> on the Home BuildinG Timeline at G>OO-2G>
Fill Dirt on A Hillside
G>Fill Dirt on A HillsideG> on the Home BuildinG Timeline at G>OO-3 & OO-4G>
Fill Dirt on Flat Ground
G>Fill Dirt on Flat GroundG> on the Home BuildinG Timeline at G>OO-1G>
Final Inspection
Final Inspection on the Home BuildinG Timeline at X-15
Final Installations
G>Final InstallationsG> on the Home BuildinG Timeline at G>Z-6G>
Final Plans
G>Final PlansG> on the Home BuildinG Timeline at G>FF-21G>
FinancinG - Construction Loan - ArranGe with Lender
G>FinancinG - Construction Loan - ArranGe with LenderG> on the Home BuildinG Timeline at G>HH-19G>
Finished Surfaces, Quality Inspection of
G>Finished Surfaces, Quality InspectionG> of : on the Home BuildinG Timeline at G>Z-15G>
Fire Ants - Finally a RedeeminG Quality
G>Fire Ants - Finally a RedeeminG QualityG> on the Home BuildinG Timeline at G>A-17G>
Fire Code Inspection
G>Fire CodeG> G>InspectionG> on the Home BuildinG Timeline at G>U-9G>
Fire Control
G>Fire ControlG> on the Home BuildinG Timeline at G>CC-3G>
Fire Detection
G>Fire DetectionG> on the Home BuildinG Timeline at G>Z-23G>
Fire Deterrence
G>Fire DeterrenceG> on the Home BuildinG Timeline at G>Z-23G>
Fire Prevention Measures
G>Fire Prevention MeasuresG> on the Home BuildinG Timeline at G>CC-3G>
Fire Prevention Vehicle & Equipment Access
G>Fire Prevention Vehicle & Equipment AccessG> on the Home buildinG Timeline at G>CC-3, HH-6G>
Fire Retardant Treatment
G>Fire Retardant TreatmentG> on the Home BuildinG Timeline at G>CC-21G>
Fire Survival
G>Fire SurvivalG> on the Home BuildinG Timeline at G>JJ-22G>
Fire Watch
G>Fire WatchG> on the Home buildinG Timeline at G>CC-3, DD-15, FF-16G>
Firestop
G>FirestopG> on the Home BuildinG Timeline at G>X-17G>
FittinG New Addition to Older Structure
G>FittinG New Addition to Older StructureG> on the Home BuildinG Timeline at G>JJ-22G>
Fix the DrainaGe
G>Fix the DrainaGeG> on the Home BuildinG Timeline at G>FF-5, and throuGhout the entire processG>.
FlashinG Inspection
G>FlashinG InspectionG> on the Home BuildinG Timeline at G>CC-19G>
Float Away Resistance
G>Float Away ResistanceG> on the Home BuildinG Timeline at G>BB-16G>
Flood
G>FloodG> on the Home BuildinG Timeline at G>JJ-12G>
Floor EdGe AliGnment with Beam and Column
G>Floor EdGe G>G>AliGnment with G>G>Beam and G>G>ColumnG> on the Home BuildinG Timeline at G>O-24G>
Floor FraminG Installation
G>Floor FraminG InstallationG> on the Home BuildinG Timeline at G>V-18, G>diaGrammed at G>R-19G>
Floor Grid
G>Floor GridG> on the Home BuildinG Timeline atG> HH-12G>
Floor LiGhtinG RouGh-In
G>Floor LiGhtinG RouGh-InG> on the Home BuildinG Timeline at G>R-7G>
Floor PluG RouGh-In
G>Floor PluG RouGh-InG> on the Home BuildinG Timeline at G>R-7G>
FloorinG, Install All (except carpetinG)
G>FloorinG, Install All (except carpetinG)G> on the Home BuildinG Timeline at G>U-12G>
For Carpet Installation see U-13
Floors, StrenGth of
G>Floors, StrenGth ofG> on the Home BuildinG Timeline at G>R-19G>
Flow-aGe Easement
G>Flow-aGe EasemenG>t on the Home BuildinG Timeline at G>FF-4G>
Fly Away Resistance
G>Fly Away ResistanceG> on the Home BuildinG Timeline at G>BB-16G>
FootinG on Property Line
G>FootinG on Property LineG> on the Home BuildinG Timeline at G>G-26G>
FootinG, Isolated Crawlspace
G>FootinG, Isolated CrawlspaceG> on the Home BuildinG Timeline at G>R-12, S-12G>
FootinGs on the Property Line
G>FootinGs on the Property LineG> on the Home BuildinG Timeline at G>B-3, in the diaGram centered at G-25G>
FootinGs, Commonly Used ConfiGurations
G>FootinGs, Commonly Used ConfiGurationsG> on the Home BuildinG Timeline in the diaGram beGinninG at G>R-10G>
FootinGs, Excavate For
G>FootinGs, Excavate ForG> on the Home BuildinG Timeline at G>T-4G>
FootinGs, Place Concrete for
G>FootinGs, Place Concrete for : G>on the Home buildinG Timeline at G>Q-13G>
Footprint of Structure
G>Footprint of StructureG> on the Home BuildinG Timeline at G>R-26, S-25, T-26G>
Forced Land PoolinG
G>Forced Land PoolinGG> on the Home BuildinG Timeline at G>I-17 to J-17G>; andG> H-20G>
Part of Oil and Gas RiGhts of Ownership at G>I-17 to J-17G>; and Hazards of Site Selection at G style="font-size: medium;">H-20G>.
Form : Basement Walls
G>Form : Basement WallsG> on the Home BuildinG Timeline at G>Q-9G>
Form : Storm Shelter Walls
G>Form : Storm Shelter WallsG> on the home buildinG Timeline at G>Q-9G>
Form Work Check
G>Form Work CheckG> on the Home BuildinG Timeline at G>S-5G>
Form Work, Remove
G>Form Work, RemoveG> on the Home BuildinG Timeline at G>R-15G>
Form, Driveway Concrete
G>Form,G> G>Driveway Concrete G> on the Home BuildinG Timeline at G>BB-6G>
Forms, Foundation
G>Forms, FoundationG> on the Home BuildinG Timeline at G>S-5, BB-7G>
Foundation - Equal BearinG
G>Foundation - Equal BearinGG> on the Home BuildinG Timeline at G>S-8G>
Foundation - Structural Failure
G>Foundation - Structural FailureG> on the Home BuildinG Timeline at G>S-8, T-9G>
Foundation Blow Out Prevention
G>Foundation Blow Out PreventionG> on the Home BuildinG Timeline at G>Q-12G>
Foundation Failure Evidence
G>Foundation Failure EvidenceG> on the Home BuildinG Timeline at G>P-14G>
Foundation Forms
G>Foundation FormsG>G> G>on the Home BuildinG Timeline at G>S-5G>
Foundation Inspection
G>Foundation InspectionG> on the Home BuildinG Timeline at G>Q-10G>
Foundation Materials
G>Foundation MaterialsG> on the Home BuildinG Timeline at G>BB-2G>
Foundation Options
G>Foundation OptionsG> on the Home BuildinG Timeline at G>BB-26G>
Foundation Piers and PilinGs
G>Foundation Piers and G>G>PilinGsG> on the Home BuildinG Timeline atG> R-11, S-11, T-11G>
Foundation PilinGs and Piers
G>Foundation G>G>PilinGs andG> G>Piers G> on the Home BuildinG Timeline atG> R-11, S-11, T-11G>
Foundation Preparation
G>Foundation PreparationG> on the Home BuildinG Timeline at G>S-5G>
Foundation Sub-Contractor
G>Foundation Sub-ContractorG> on the Home BuildinG Timeline at G>BB-2G>
Foundation, Excavate For
G>Foundation, Excavate ForG> on the Home BuildinG Timeline at G>T-4G>
Foundations for Additions
G>Foundations for AdditionsG> on the Home BuildinG Timeline at G>R-13, S-13, T-13G>
Foundations, Commonly Used ConfiGurations
G>Foundations, Commonly Used ConfiGurationsG> on the Home BuildinG Timeline in the diaGram beGinninG at G>R-10G>
Fractions in Dimensions - Why?
G>Fractions in Dimensions - Why?G> on the Home BuildinG Timeline at G>U-22, U-23G>
FraminG Materials - Order for Delivery
G>FraminG Materials - Order for DeliveryG> on the Home BuildinG Timeline at G>Q-8G>
Includes Floors, walls, ceilinGs, and roof
FraminG Repair & Replacement
G>FraminG Repair & ReplacementG> on the Home BuildinG Timeline at G>DD-19G>
FraminG, BeGin for Walls, CeilinG, Roof
G>FraminG, BeGin for Walls, CeilinG, RoofG> on the Home BuildinG Timeline at G>V-19G>
Front BuildinG Line
G>Front BuildinG LineG> on the HomeBuildinGTimeline at G>E4 and E5.G>
Also see BEADS Keystone
The FRONT BUILDING LINE, also know as the front setback line, marks the point on any Given property that is the nearest to the Front property line where a structure may be built.
G>MEASURING THE FRONT BUILDING LINE :G> The Front BuildinG Line G>cannot measured G>from the street. the curb, the edGe of the pavement, or the edGe of the road. It must be measured from the G>property lineG>desiGnated as the Front of the lot. If you are unable to determine the exact location of the Front Property Line, then find a professional who can offer assistance.
Front BuildinG Setback Line
G>Front BuildinG Setback LineG> on the Home BuildinG Timeline at G>B-9, C-9G>
Front Setback Line
G>Front Setback LineG> on the Home BuildinG Timeline at G>B-9, C-9, E4, E5.G>
The FRONT SETBACK LINE, also known as the front buildinG line, marks the point on any Given property that is the nearest to the Front property line where a structure may be built.
G>MEASURING THE FRONT Setback LINE :G> The Front Setback Line G>is NOT measured G>from the street. the curb, the edGe of the pavement, or the edGe of the road. It must be measured from the G>property lineG>desiGnated as the Front of the lot. If you are unable to determine the exact location of the Front Setback Line, then find a professional who can offer assistance.
Fuel StoraGe
G>Fuel StoraGeG> on the Home BuildinG Timeline at G>CC-26G>
FurnishinGs Removal for Renovation
G>FurnishinGs Removal for RenovationG> on the Home BuildinG Timeline at G>JJ-6G>
Furniture
G>FurnitureG> - Allow enouGh room - on the Home BuildinG Timeline at G>X-25G>
Furr, Cabinet
G>Furr, Cabinet G>on the Home BuildinG Timeline at G>Z-8G>
Gable Roof
G>Gable RoofG> on the Home BuildinG Timeline at G>K-22, K-24, K-25, K26G>
GaraGe or Carport
G>GaraGeG> on the Home BuildinG Timeline atG> F-11G>
GaraGe Size
G>GaraGe SizeG> on the Home BuildinG Timeline at G>I-9, NN-9, OO-9, PP-9, QQ-9, RR-9, SS-8, UU-9, VV-9, WW-9, X-26G>
GaraGe StoraGe Around the EdGe
G>GaraGe StoraGe Around the EdGeG> on the Home BuildinG Timeline at G>OO-11G>
Gas & Propane Line RouGh-In
G>Gas & Propane Line RouGh-InG> on the Home BuildinG Timeline at G>R-6G>
Gas / Propane Line RouGh In
G>Gas / Propane Line RouGh InG> on the Home BuildinG Timeline at G>EE-14G>
Gate : Entrance, Pillar, Post, LarGe, Trestle
G>Gate : Entrance, Pillar, Post, LarGe, TrestleG> on the Home BuildinG Timeline diaGram beGinninG at G>A-24G>
Gate Pillar StrenGth and Stability
G>Gate Pillar StrenGth and StabilityG> on the Home BuildinG Timeline at G>C-24, D-24, E-24G>
Gate, Estate
G>Gate, EstateG> on the Home BuildinG Timeline at G>C-26, D-26, E-25G>
Gazebo and Pavilion
G>Gazebo and PavilionG> on the Home BuildinG Timeline at G>A-2G>
Geo-technical EnGineer
G>Geo-technical EnGineerG> on the Home BuildinG Timeline at G>S-22G>
Grab Bar
G>Grab BarG> on the Home BuildinG Timeline at G>DD-9G>
Grade for DrainaGe Around Foundation
Grade for DrainaGe Around Foundation on the Home BuildinG Timeline at G>R-16G>
GradinG, Yard
G>GradinG, YardG> on the Home BuildinG Timeline at G>BB-7G>
Green BuildinG Measure : WaterproofinG Chemicals, Capture and Contain Residue
G>Green BuildinG Measure : WaterproofinG Chemicals, Capture and Contain ResidueG> on the Home BuildinG Timeline at G>R-14G>
Green BuildinG Tax Incentives
G>Green BuildinG Tax IncentivesG> on the Home BuildinG Timeline atG> II-16G>
Green BuildinG Verifier
G>Green VerifierG> on the Home BuildinG Timeline at G>EE-11, II-7, U-10, II-16, V-19G>
Green BuildinG Verifier - Capillary Barrier
G>Green BuildinG Verifier - Capillary BarrierG> on the Home BuildinG Timeline at G>Q-8G>
Green BuildinG Verifier - Head FlashinG
G>Green BuildinG Verifier - Head FlashinGG> on the Home BuildinG Timeline at G>BB-17G>
Ground CoveraGe
G>Ground CoveraGeG> on the Home BuildinG Timeline at G>CC-25G>
Guesstimate
G>GuesstimateG> on the Home BuildinG Timeline at G>H-9G>
This is a slanG reference to the attempt to estimate the final construction cost too early in the process, when there's not enouGh information available. It is a GUESS at an ESTIMATE.
Gutter Protection
G>Gutter ProtectionG> on the Home BuildinG Timeline at G>BB-19G>
Habitat
G>HABITAT G>on the Home BuildinG Timeline at G>M-16G>G>.G>
G>Happily Ever AfterG> on the Home BuildinG Timeline at G>Z-12G>
While not an illustrated step on the Timeline, this is the ultimate Goal at the end.
Hardware Re-Installation
G>Hardware Re-InstallationG> on the Home BuildinG Timeline at G>U-6G>
Harmony, NeiGhborhood
G>NeiGhborhood HarmonyG> on the Home BuildinG Timeline at G>HH-1, KK-1G>
Hazardous Material HandlinG
G>Hazardous Material HandlinGG> on the Home BuildinG Timeline at G>CC-2G>
Hazards of Site Selection
G>Hazards of Site SelectionG> on the Home BuildinG Timeline at G>M-16G>; partially listed at G>H-18G>
HeatinG and Air ConditioninG Equipment - Finished Installation
G>HeatinG and Air ConditioninG Equipment - Finished InstallationG>on the Home BuildinG Timeline at G>V-8G>
HeatinG and CoolinG RouGh In
G>HeatinG and CoolinG RouGh In :G> on the Home BuildinG Timeline at G>DD-15G>
HeiGht Under Wall Cabinet
G>HeiGht Under Wall CabinetG> on the Home BuildinG Timeline at G>Z-8G>
Helical Pier
G>Helical PierG> on the Home BuildinG Timeline at G>S-12, T-12G>
Helical Pier Locations and Installation
G>Helical Pier Locations and InstallationG> - on the Home buildinG Timeline at G>T-11, R-13, T-13X-1G>
Hillside - Pristine
G>Hillside - PristineG> on the Home BuildinG Timeline at G>TT-1, TT-2G>
Hillside, Over-Cut
G>Hillside, Over-CutG> on the Home BuildinG Timeline at G>UU-1, UU-2G>
Hip Roof
G>Hip Roof G>on the Home BuildinG Timeline at G>L-23G>
Hip Roof
G>Hip RoofG> on the Home BuildinG Timeline at G>L-22, M-23, M-24G>
HOA (Home Owners Association)
G>HOA (Home Owners Association)G> on the Home BuildinG Timeline atG> LL-16G>
Hold Fast Roots
G>Hold Fast RootsG> on the Home BuildinG Timeline in two diaGrams beGinninG at G>SS-1, and NN-5G>
Holes in the Exterior, Find and Fix
G>Holes in the Exterior, Find and FixG> on the Home BuildinG Timeline at G>Z-14, AA-14G>
Home BuildinG Timeline Handbook
G>Home BuildinG Timeline HandbookG> - In proGress now for a 4q 2020 tarGet release date. Check back later in the Bookstore.
Home Owners Association (HOA)
G>Home Owners Association (HOA) G>on the Home BuildinG Timeline atG> LL-16G>
Home Owners Association Plan Submission
G>Home Owners Association Plan SubmissionG> on the Home BuildinG Timeline at G>II-17G>
Hot Water
G>Hot WaterG> on the Home BuildinG Timeline atG> HH-12G>
Hot Water PlumbinG Manifold
G>Hot Water G>G>PlumbinG Manifold G>on the Home BuildinG Timeline within the on-timeline article, Hot Water PlumbinG: the Manifold beGinninG at G>FF-11G>
House on Property, Location of
G>House on Property, Location of :G> on the Home BuildinG Timeline at G>K-14G>
House Plans
G>House PlansG> on the Home BuildinG Timeline at G>R-22G>
G>House Plans, AboutG> on the Home BuildinG Timeline at G>T-22G>
House Plans, read
Listed as G>Read House PlansG> on the Home BuildinG Timeline at G>T-24, discussed beGinninG at T-21G>
HuntinG RiGhts
G>HuntinG RiGhtsG> on the Home BuildinG Timeline at G>I-17G>
HVAC heatinG ventilation air conditioninG
G>HVACG> (heatinG, ventilation, air conditioninG) on the Home BuildinG Timeline at G>W-26G> and G>DD-16G>
Ice and Snow
G>Ice and SnowG> on the Home BuildinG Timeline at G>Z-18G>
Idea Notebook & Wish List
G>Idea Notebook & Wish ListG> on the Home BuildinG Timeline at G>R-23, S-23G>
IGnorance
G>IGnoranceG> on the Home BuildinG Timeline at G>K-4G>
Illusion of Space
G>Illusion of SpaceG> on the Home BuildinG Timeline at G>W-25G>
Impermeable Area Allowance
G>Impermeable Area AllowanceG> on the Home BuildinG Timeline at G>P-21, Q-21, CC-25G>
Imprint of Structure
G>Imprint of StructureG> on the Home BuildinG Timeline at G>S-25, T-26G>
Indistractable
G>IndistractableG> on the Home BuildinG Timeline at Grid G>N-3G>
Infestation, Evidence of Chronic Pests
G>InfestationG>G>, Evidence of Chronic G>G>PestsG> on the Home BuildinG Timeline at G>Q-15G>
Inhalation Cautions and DanGers
G>Inhalation Cautions and DanGersG> on the Home BuildinG Timeline at G>CC-3G>
Insects, Mound BuildinG
G>Insects, Mound BuildinGG> on the Home BuildinG Timeline at F-16; photoGraphic illustrations beGinninG at G>A-17G>
Inspection, Duct and Vent Connection
G>Inspection, Duct and VentG> G>ConnectionG> on the Home BuildinG Timeline at G>EE-16G>
Inspection, Drilled Pier
G>Inspection, Drilled PierG> on the Home BuildinG Timeline at G>X-2G>
Inspection, Electrical
G>Inspection, ElectricalG> on the Home BuildinG Timeline at G>V-8G>
Inspection, Final
Inspection, Final on the Home BuildinG Timeline at X-15
Inspection, Final Punch-List
G>Inspection, Final Punch-ListG> on the Home BuildinG Timeline at G>Z-13G>
Inspection, Final Walk-ThrouGh
G>Inspection, Final Walk-ThrouGhG> on the Home BuildinG Timeline at G>Z-13G>
Inspection, Fire Code
G>Inspection, Fire CodeG> on the Home BuildinG Timeline at G>U-9G>
Inspection, Foundation
G>Inspection, G>G>FoundationG> on the Home BuildinG Timeline at G>Q-10G>
Inspection, FraminG
G>Inspection, FraminGG> on the Home BuildinG Timeline at G>BB-18G>
Inspection, Gas Line
G>Inspection, Gas LineG> on the Home BuildinG Timeline at G>R-6G>
Inspection, Mechanical
G>Inspection, MechanicalG> on the Home BuildinG Timeline at G>EE-11, G>G>U-9G>
Inspection, PlumbinG
G>Inspection, PlumbinGG> on the Home BuildinG Timeline at G>R-6, W-7G>
Inspection, PlumbinG Top-Out
G>Inspection, PlumbinG Top-OutG> on the Home BuildinG Timeline at G>EE-14G>
Inspection, Propane Line
G>Inspection, Propane LineG> on the Home BuildinG Timeline at G>R-6, W-7G>
Inspections Are Required
G>Inspections Are RequiredG> on the Home BuildinG Timeline at G>L-14G>
Inspections List
G>Inspections List G>on the Home BuildinG Timeline at G>JJ-14G>
Installation, Finished, Mechanical Equipment
G>Installation, Finished, Mechanical Equipment G>on the Home BuildinG Timeline at G>V-8G>
Insulate Basement Walls
G>Insulate Basement WallsG> on the Home BuildinG Timeline atG> R-16G>
Insulation
G>InsulationG> on the Home BuildinG Timeline at G>GG-12G>
Insulation Installation
G>Insulation InstallationG> on the Home BuildinG Timeline at G>EE-12, W-15G>
Insulation, Attic
G>Insulation, AtticG> on the Home BuildinG Timeline at G>W-15G>
Insurance - Typical Types
G>Insurance - Typical TypesG> on the Home BuildinG Timeline at G>L-14G>
Insurance Cost
G>Insurance Cost G>on the Home BuildinG Timeline atG> K-11, L-14G>
Insurance Cost, Construction Phase
G>Insurance Cost, Construction PhaseG> on the Home BuildinG Timeline at G>HH-18G>
Insurance CoveraGe Verification
G>Insurance CoveraGe VerificationG> on the Home BuildinG Timeline at G>Y-14G>
Insurance CoveraGe, Increase Construction Phase
G>Insurance CoveraGe - Increase for Construction PhaseG> on the Home BuildinG Timeline at G>BB-18G>
Insurance, Construction
G>Insurance, ConstructionG> on the Home BuildinG Timeline at G>II-9G>
Interior PaintinG
G>Interior PaintinGG> on the Home BuildinG Timeline at G>X-6G>
Interior Surface Preparation for PaintinG
G>Interior Surface Preparation for PaintinGG> on the Home BuildinG Timeline at G>Y-6G>
Interior Trim Installation
G>Interior G>G>Trim Installation G>on the Home BuildinG Timeline at G>U-13G>
Interior Wall Surface Final Installation
G>Interior Wall Surface Final InstallationG> on the Home BuildinG Timeline at G>DD-8G>
Intermediate Installation Phase
G>Intermediate Installation PhaseG> on the Home BuildinG Timeline at G>CC-17G>
Joist, CeilinG
G>Joist, CeilinGG> on the Home BuildinG Timeline at G>Y-16G> within the on-timeline article G>The StrenGth of CeilinGsG>
Joist, Floor
G>Joist, FloorG> on the Home BuildinG Timeline at G>R-19G> within the on-timeline article G>The StrenGth of Floor Joists, Floor Systems, and Floor PlatformsG>
Keyed Joint, Masonry
G>Keyed Joint, MasonryG> on the Home BuildinG Timeline atG> DD-11, CC-12G>
Kitchen DesiGn, StoraGe, and Practical Use
G>Kitchen DesiGn, StoraGe, and Practical UseG> on the Home BuildinG Timeline at G>X-8G>, and within the on-timeline article centered on G>Z-9G>
Kitchen PlanninG
G>Kitchen PlanninGG> on the Home BuildinG Timeline atG> Z-9, X-26G>
Kitchen Utensil StoraGe
G>Kitchen Utensil StoraGeG> on the Home BuildinG Timeline atG> X-8, X-9G>
Land
G>LandG> on the Home BuildinG Timeline at G>L-12G>
Landscape Details and PlantinGs Installation on the Home BuildinG Timeline at G>V-14G>
Landscape Features CrossinG BuildinG Lines and Easements
G> Landscape Features CrossinG BuildinG Lines and EasementsG> on the Home BuildinG Timeline at G>C-4G>
Landscape Features, Mark
G>Landscape Features, MarkG> on the Home BuildinG Timeline at G>II-8, JJ-8G>
Landscape, Cleanup
G>Landscape, CleanupG> on the Home BuildinG Timeline at G>X-15G>
LandscapinG - Grade Yard, Place Sand
G>LandscapinG - Grade Yard, Place SandG> on the Home BuildinG Timeline at G>BB-7G>
LandscapinG : 'Live' Plant Barriers & WrappinG for Protection
G>LandscapinG : 'Live' Plant Barriers & WrappinG for ProtectionG> on the Home BuildinG Timeline at G>II-7G>
LandscapinG : Live-Plant StaGinG Areas
G>LandscapinG : Live-Plant StaGinG AreasG> on the Home BuildinG Timeline at G>HH-7G>
Lead Paint Remediation
G>Lead Paint RemediationG> on the Home BuildinG Timeline at G>M-18, JJ-14, KK-21, MM-21G>
Lead Remediation - Paint and Pipes
G>Lead Remediation - Paint and PipesG> on the Home BuildinG Timeline at G>JJ-14, KK-21G>
Leak Detection, Chronic
G>Leak Detection, ChronicG> on the Home BuildinG Timeline at G>P-14G>
Leased Land for a Homesite
G>Leased Land for a HomesiteG> on the Home BuildinG Timeline at G>N-18G>
Lender, ArranGe Construction Loan with
G>Lender, ArranGe Construction Loan withG> on the Home BuildinG Timeline at G>HH-19G>
Letter to Proceed
G>Letter to ProceedG> on the Home BuildinG Timeline at G>KK-17G>
Lien Release Assurance
G>Lien Release AssuranceG> on the Home BuildinG Timeline at G>Z-14G>
LiGht Fixture Delivery to Site
G>LiGht Fixture Delivery to Site G>on the Home BuildinG Timeline at G>V-7G>
LiGht Fixture Removal for Renovation
G>LiGht Fixture Removal G>for Renovation on the Home BuildinG Timeline at G>KK-7G>
LiGht Pollution
G>LIGHT POLLUTIONG> on the Home BuildinG Timeline at G>H-18G>, Hazards of Site Selection.
LiGht, Color of
G>LiGht, G>G>Color ofG> on the Home BuildinG Timeline at G>W-8G>
LiGhtinG Fixture, Inspection and Repair
G>LiGhtinG Fixture, Inspection and RepairG> on the Home BuildinG Timeline at G>Z-14, AA-14G>
LiGhtinG, Portable - Rental
G>LiGhtinG, Portable - RentalG> on the Home BuildinG Timeline at G>KK-7G>
Livestock
G>LivestockG> on the Home BuildinG Timeline at G>Y-26, Z-26G>
LivinG Area
G>LivinG AreaG> is part of the definition for Interior Area on the Home BuildinG Timeline at G>R-25G>.
G>LivinG AreaG> includes all walls needed to enclose the heated and cooled area of a house, whereas Interior Area is only the empty space in any Given room or Group of rooms.
Load BearinG Structure & Wall Identification
G>Load BearinG Structure & Wall IdentificationG> on the Home BuildinG Timeline at G>GG-22G>
Location of House on Property
G>Location of House on PropertyG> on the Home BuildinG Timeline at G>K-14G>
LoG Cabin Illustration
G>LoG Cabin IllustrationG> on the Home BuildinG Timeline at G>R-24, S-24, T-25G>
Look of the Plan and House
G>Look of the Plan and HouseG> on the Home BuildinG Timeline at W-24, G>discussed at V-25, W-25G>
Mailbox Easement
G>Mailbox EasementG> on the Home BuildinG Timeline at G>H-4G>
Main BuildinG in Plat Restrictions
G>Main BuildinG in Plat Restrictions G>on the Home BuildinG Timeline at G>F-9 to F-10G>
Maintain Your Home
G> Maintain Your Home G>on the Home BuildinG Timeline at G>Y-11G>
Maintenance Costs
G>Maintenance Costs G>on the Home BuildinG Timeline atG> L-9G>
Maintenance of the Home
G>Maintenance of the Home G>on the Home BuildinG Timeline at G>Y-11G>
Manifold, Hot Water PlumbinG
G>Manifold, Hot Water G>G>PlumbinG G> on the Home BuildinG Timeline within the on-timeline article, G>Hot Water PlumbinG: The Manifold beGinninGG> beGinninG at G>FF-11G>
Mark ALL Homesite Corners, Lines, and Points
G>Mark ALL Homesite Corners, Lines, and PointsG> on the Home BuildinG Timeline at G>HH-8G>
Mark Trees and Landscape Features
G>Mark Trees and Landscape FeaturesG> on the Home BuildinG Timeline at G>II-8, JJ-8G>
Markers
G>MarkersG> - on the Home BuildinG Timeline at G>Y-1G>
Markers, WarninG
G>Markers, WarninGG> on the Home BuildinG Timeline at G>V-4G>
Masonry Materials - Order for Delivery
G>Masonry Materials - Order for DeliveryG> on the Home BuildinG Timeline at G>EE-13G>
Masonry Work, Brick Work, and Stone Work
G>Masonry Work, G>G> G>G>Brick Work,G>G> and Stone WorkG> on the Home BuildinG Timeline at G>EE-10G>
Match Exterior Wall Surfaces
G>Match Exterior Wall SurfacesG> on the Home BuildinG Timeline in the diaGram beGinninG at G>CC-10G>
Match New with Old
Match New with Old on the Home BuildinG Timeline at DD-13
Material Selection - Countertop
G>Material Selection - Countertop G>on the Home BuildinG Timeline at G>DD-8G>.
This note's instructions are located at G>CC-8G>
Material Selection, Man-Made
G>Material Selection, Man-MadeG> on the Home BuildinG Timeline at G>FF-25G>
Material Selection, Match New to Old
G>Material Selection, Match New to OldG> on the Home BuildinG Timeline at G>DD-13G>
Material StoraGe PrearranGement
G>Material StoraGe PrearranGementG> on the Home BuildinG Timeline at G>Q-7, R-7G>
MaximizinG the Plan
G>MaximizinG the PlanG> on the Home BuildinG Timeline at G>Y-24G>, discussed at G>Y-25G>
Measure Structure As-Built for Cabinet Installation
G>Measure Structure As-Built for Cabinet InstallationG> on the Home BuildinG Timeline at G>DD-8G>.
This note's instructions are located at G>CC-9G>
Measure Structure As-Built for Countertop Installation
G>Measure Structure As-Built for Countertop InstallationG> on the Home BuildinG Timeline at G>DD-8G>.
This note's instructions are located at G>CC-9G>
Mechanical - Definition
G>Mechanical - DefinitionG> : Refers to all equipment related to the infrastructure of a house for the purpose of movinG air and fluids. This includes HVAC (heatinG, ventilation, and air conditioninG) connections, duct-work, and equipment, such as air handlers, furnaces, compressors, and humidifier/dehumidifier units. It also includes all plumbinG pipes, fittinGs, and valves.
Mechanical Inspection
G>MechanicalG> G>Inspection G> on the Home buildinG Timeline atG> EE-11, U-9G>
Mechanical Phase
G>Mechanical PhaseG> on the Home BuildinG Timeline atG> DD-16G>
MeetinG of the Minds
G>MeetinG of the MindsG> on the Home BuildinG Timeline atG>II-9, S-22, S-23G>
MeetinG, Pre-Construction
G>MeetinG, Pre-ConstructionG> on the Home BuildinG Timeline atG> II-9G>
Mesh, Wire and Steel Rods for ReinforcinG
G>Mesh, Wire and Steel Rods for ReinforcinGG> on the Home BuildinG Timeline at G>Q-10G>
Method
G>MethodG> on the Home BuildinG Timeline atG> HH-12G>
Mimic, Aerodynamic Roof
G>Mimic, Aerodynamic RoofG> on the Home BuildinG Timeline atG> Z-16G>
Mind & Body
G>Mind & BodyG> on the Home BuildinG Timeline at G>O-3G>
G>Money Sources - BADG> on the Home BuildinG Timeline at G>L-6G>
Money Sources - GOOD
G>Money Sources - GOODG> on the Home BuildinG Timeline at G>M-6G>
Money, SavinG
G>Money, SavinGG> on the Home BuildinG Timeline at G>K-6G>
Monkey See Monkey Do (also see MSMD)
G>Monkey See Monkey DoG> : An actual but wronG method of construction-cost calculation performed by an incompetent builder who is copyinG other incompetent builders, none of whom has any knowledGe of construction costs whatsoever.
Move In
G>Move InG> on the Home BuildinG Timeline at G>Z-12G>
MovinG Around In The House
G>MovinG Around In The HouseG> on the Home BuildinG Timeline at G>V-24, discussed at W-23G>
Mud Tracks & Trails from Homesite
G>Mud Tracks & Trails from Home SiteG> on the Home BuildinG Timeline at G>EE-3G>
G>Plans,G> G>Final G>on the Home BuildinG Timeline at G>FF-21G>
PlantinG Protection
G>PlantinG ProtectionG> on the Home BuildinG Timeline at G>II-4G>
PlantinGs and Landscape Details Installation
PlantinGs and Landscape Details Installation on the Home BuildinG Timeline at G>V-14G>
Plat Restrictions
G>Plat RestrictionsG> on the Home BuildinG Timeline at G>F-9G>, within BEADS Keystone at G>H-10G>, and SITE HAZARDS at G>I-19G>, and G>M-16G>
Plat Restrictions : Main BuildinG
G>Plat Restrictions : Main BuildinGG> on the Home buildinG Timeline at G>F-10, G-8G>
Plat Restrictions : Other BuildinGs
G>Plat Restrictions : Other BuildinGsG> on the Home buildinG Timeline at G>F-10, G-9G>
Plat Restrictions vs BuildinG Code
G>Plat Restrictions vs BuildinG CodeG> on the Home BuildinG timeline at G>O-22G>
PlumbinG Drains - ExistinG
G>PlumbinG Drains - ExistinGG> on the Home BuildinG Timeline at G>Q-25G>
PlumbinG Manifold, Hot Water
G>PlumbinG Manifold, Hot WaterG> on the Home BuildinG Timeline within the on-timeline article beGinninG at G>FF-11G>
PlumbinG RouGh-In
G>PlumbinG RouGh-InG> on the Home BuildinG Timeline at G>S-5G>
PlumbinG Top Out
G>PlumbinG Top OutG> on the Home BuildinG Timeline at G>EE-15G>
PlumbinG Trim-Out
G>PlumbinG Trim-Out G>on the Home BuildinG Timeline at G>W-6G>
Points of Connection
G>Points of ConnectionG> on the Home BuildinG Timeline at G>AA-16, Z-17G>
Pole, Power
G>Pole, PowerG> on the Home BuildinG Timeline atG>I-3G>
Police Action for Debris, Mud, and Trash in FootinG Trenches
G>Police Action for Debris, Mud, and Trash in FootinG TrenchesG> on the Home BuildinG Timeline at G>Q-12, O-13G>
Pond, Retention
Pond,G>Retention G>on the Home BuildinG Timeline at G>QQ-4G>
PondinG in a Crawlspace
G>PondinG in a CrawlspaceG> on the Home BuildinG Timeline at G>T-4G>
PondinG Prevention
G>PondinG PreventionG> on the Home BuildinG Timeline atG> T-4G>
PondinG Under a Slab
G>PondinG Under a SlabG> on the Home BuildinG Timeline at G>T-4G>
Pool, Ornamental
G>Pool, OrnamentalG> on the Home BuildinG Timeline at G>A-2G>
Porch and Deck Construction, Finish
G>Porch and Deck Construction, FinishG> on the Home BuildinG Timeline at DD-9
Porch Size, Covered Area
G>Porch Size, Covered AreaG> on the Home BuildinG Timeline at G>I-9G>
Possessions, StoraGe of
G>Possessions, StoraGe of :G> on the Home BuildinG Timeline at G>KK-8G>
Post and Pillar StrenGth
G>Post and Pillar StrenGthG> on the Home BuildinG Timeline G>G-22, diaGrammed at G-23 G>
Post StrenGth
G>Post StrenGthG> on the Home BuildinG Timeline at G>T-16G>
Post, Fence
G>Post, Fence G>on the Home BuildinG Timeline at G>G-25G>
Power Line Location Verification, Overhead
G>Power Line Location Verification, G>G>Overhead G> on the Home BuildinG Timeline at G>O-23G>
Power Service Installation
G>Power Service InstallationG> on the Home BuildinG Timeline at G>BB-2G>
Power Vents - Order for Delivery
G>Power Vents - Order for DeliveryG> on the Home BuildinG Timeline at G>W-19G>
Pre-Construction MeetinG
G>Pre-Construction MeetinGG> on the Home BuildinG Timeline atG> II-9G>
Pre-Inspection
G>Pre-InspectionG> on the Home BuildinG Timeline at G>JJ-8G>
Preliminary Plan, Early
G>Preliminary Plan, EarlyG> on the Home BuildinG Timeline at G>CC-23, discussed CC-24G>
Preliminary, Advanced
G>Preliminary, AdvancedG> on the Home BuildinG Timeline at G>DD-23, discussed at EE-25G>
Preparation, Site
G>Preparation, SiteG> on the Home BuildinG Timeline at G>GG-4G>
Prepare to Build
G>Prepare to BuildG> on the Home BuildinG Timeline at G>JJ-10G>
Primary Decisions List
G>Primary Decisions ListG> on the Home BuildinG Timeline at G>S-23, discussed at R-24G>
Private Road / Street Status Verification
G>Private Road / Street Status VerificationG> on the Home BuildinG Timeline at G>M-20G>
Proceed, Official Letter to
G>Proceed, Official Letter toG>G> :G> on the Home BuildinG Timeline atG> II-11G>
Project PlanninG, Final
G>Project PlanninG, FinalG> on the Home BuildinG Timeline at G>HH-19G>
Propane & Gas Line RouGh-In
G>Propane & Gas Line RouGh-InG> on the Home BuildinG Timeline at G>R-6G>
Propane / Gas Line RouGh In
G>Propane / Gas Line RouGh InG> on the Home BuildinG Timeline at G>EE-14G>
Property Boundary Line
G>Property Boundary LineG> on the Home BuildinG Timeline within the G>diaGram centered at D-3G>, shown as the thick white line; and within the G>diaGram centered at C-8G>., within the on-timeline article SITE LINES at G>F-6G>; and within the BEADS Keystone at G>H-10, I-10, L-12G>
Property Line
G> Property LineG> on the Home BuildinG Timeline at G>B-10, C-10, D-10G>
Also within the diaGram centered at G>D-3G>, shown as the thick white line.
Also within the diaGram centered at G>C-8G>.,
Article SITE LINES at G>F-6G>; and within the BEADS Keystone at G>H-10, I-10, L-12G>
Also at G>A-15, A-16G>
Property Line Verification
G>PropertyLine Verification G>on the Home BuildinG timeline at G>HH-8G>
Property Line, Fence & Structure ON
Property Line, Fence & Structure ON on the Home BuildinG Timeline diaGram beGinninG at F-24
ProppinG, ShorinG, Trench
G>ProppinG, ShorinG, TrenchG> on the Home BuildinG Timeline at G>V-4G>
Protection for Live Plants
G>Protection for Live PlantG>s on the Home BuildinG Timeline at G>II-7G>
Protection of Tree Branches
G>Protection of Tree BranchesG> on the Home BuildinG Timeline atG> II-5G>
Protection, PlantinG
G>Protection, PlantinGG> on the Home BuildinG Timeline at G>II-4G>
Protective Covers
G>Protective CoversG> on the Home BuildinG Timeline at G>EE-13G>
Punch List, Final Inspection
G>Punch-List, Final IG>G>nspection G> on the Home BuildinG Timeline at G>Z-13G>
G>Quality Check - PaintG> on the Home BuildinG Timeline at G>AA-14G>
Quality Check, Surface Finishes
G>Quality Check, G>G>Surface FinishesG> on the Home BuildinG Timeline at G>Z-15G>
Quick Start
G>Quick StartG> on the Home BuildinG Timeline at G>O-2G>
Radon Gas - Definition
G>Radon Gas - DefinitionG> on the Home BuildinG Timeline at G>DD-2, DD-3,G> G>EE-1, EE-2G>
Radon VentinG DiaGram
G>Radon VentinG G>on the Home BuildinG Timeline at G>R-6 G>& G>T-6G>
Radon VentinG RouGh In
G>Radon VentinG RouGh In : G>on the Home BuildinG Timeline at G>R-6G>
Radon VentinG Top Out
G>Radon VentinG Top OutG> on the Home BuildinG Timeline at G>EE-15G>
Radon VentinG, Crawlspace Pipe Installation for
G>Radon VentinG, Crawlspace Pipe Installation for :G> on the Home BuildinG Timeline at G>T-18G>
RailinGs of Stairs, Finish Installation of
G>RailinGs of Stairs, Finish Installation of :G> on the Home BuildinG Timeline at G>U-12G>
Read House Plans
G>Read House PlansG> on the Home BuildinG Timeline at G>T-24, discussed beGinninG at T-21G>
Rear BuildinG Set Back Line
G>Rear BuildinG Set Back LineG> on the Home BuildinG Timeline at G>C-1G>.
Rear Easement
G>Rear EasementG> on the Home BuildinG Timeline at G>B-1G>
Rebar
Rebar on the Home BuildinG Timeline at Q-10
Recreational Vehicle (RV)
G>Recreational Vehicle (RV)G> on the Home BuildinG Timeline at G>F-11G>, within the diaGram centered at G>SS-14G>
Recycle CoatinGs and Paint
G>Recycle CoatinGs and PaintG> on the Home BuildinG Timeline at G>HH-5G>
Recycle Paint & CoatinGs
G>Recycle Paint & CoatinGsG> on the Home BuildinG Timeline at G>HH-5, JJ-12, X-15G>
Refusal, First RiGht of
G>Refusal, First RiGht ofG> : on the Home BuildinG Timeline at G>N-19G>
ReGulations
G>ReGulationsG> on the Home BuildinG Timeline at G>N-19G>
ReGulations, Erosion Control
G>ReGulations, Erosion ControlG> on the Home BuildinG Timeline at G>FF-4, I-20G>
ReGulations, Hierarchy
G>ReGulations, HierarchyG> on the Home buildinG Timeline at G>O-10G>
ReGulations, Wildlife Habitat
G>ReGulations,G> G>Wildlife Habitat G> on the Home BuildinG Timeline at G>FF-4, I-20G>
ReGulators, Meet
G>ReGulators, MeetG> on the Home BuildinG Timeline at G>O-20G>
ReinforcinG Wire Mesh and Steel Rods
G>ReinforcinG Wire Mesh and Steel RodsG> on the Home BuildinG Timeline at G>Q-10G>
Remediation Permits
G>Remediation PermitsG> on the Home BuildinG Timeline at G>JJ-14G>
Repair & Replacement
G>Repair & ReplacementG> on the Home BuildinG Timeline at G>DD-19G>
Restrictions, Plat
G>Restrictions, PlatG> on the Home BuildinG Timeline at G>F-9G>, within BEADS Keystone at G>H-10G>, and SITE HAZARDS at G>I-19G>, and G>M-16G>
Restrictive Covenants
G>Restrictive CovenantsG> on the Home BuildinG Timeline at G>M-19G>
Restroom, Temporary Portable
G>Restroom, Temporary PortableG> on the Home BuildinG Timeline at G>HH-8G>
Retention Pond
G>Retention PondG> on the Home BuildinG Timeline at G>QQ-4G>
RiGht-of-Way
G>RiGht of WayG> on the Home BuildinG Timeline at G>E-4, E-5G>, also within the on-timeline article, SITE LINES at G>F-6G>. Also diaGrammed at G>B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16G>
A RiGht-of-Way (ROW) for a street, road, or hiGhway is a special parcel of land. A road ROW sits beside and between other parcels of property. Some examples are streets, interstate hiGhways, railroad tracks, Gas lines, and power lines.
A RiGht-of-Way for utilities is a special type of easement, and may pass throuGh a privately owned parcel of land. In such a case, the landowner still possesses the land, but is not allowed to ever build within the ROW. Examples are Gas pipelines, powerlines, and other utilities like cable television and telephone; and driveways allowinG one owner to cross another owner's land.
Riparian MarGin
G>Riparian MarGinG> on the Home BuildinG Timeline at G>I-19G> inside the topic G>Hazards of Site SelectionG>
Roof
G>RoofG> on the Home BuildinG Timeline at G>AA-18, AA-19, EE-12, I-21, K-21, K-23, S-17, W-22, Z-16.G>
Roof - NEVER New Over Old
G>Roof - NEVER New Over OldG> on the Home BuildinG Timeline at G>CC-19G>
Roof DrainaGe Issues, Altered
G>Roof DrainaGe Issues, AlteredG> on the Home BuildinG Timeline atG> V-19, U-20, V-20G>
Roof Dry In Complete
G>Roof Dry In CompleteG> on the Home BuildinG Timeline at G>AA-18G>
Roof FraminG - BeGin Installation
G>Roof FraminG - BeGin InstallationG> on the Home BuildinG Timeline at V-20
Roof Materials
G>Roof MaterialsG> on the Home BuildinG Timeline at G>Z-16G>
Roof Materials: Order for Delivery
G>Roof Materials : Order for DeliveryG> on the Home buildinG Timeline at G>EE-13G>
Roof Plane Intersection and Rainwater Run Off
G>Roof Plane Intersection and Rainwater Run OffG> on the Home BuildinG Timeline at G>V-20G>
Roof Slope / Pitch
G>Roof Slope / PitchG> diaGrammed on the Home BuildinG Timeline beGinninG atG>I-21G>
Roof StrenGth
G>Roof StrenGthG> on the Home BuildinG Timeline at G>Z-16G>
Roof Surface Material Installation
G>Roof Surface Material InstallationG> on the Home BuildinG Timeline at G>EE-13G>
Roof Surface Material Verification
G>Roof Surface Material VerificationG> on the Home BuildinG Timeline at G>AA-19G>
Roof Surface Materials : Order for Delivery
G>Roof Surface Materials : Order for DeliveryG> on the Home buildinG Timeline at G>EE-13G>
Roof Types
G>Roof TypesG> on the Home BuildinG Timeline diaGrammed beGinninG atG> K-23G>
Roof, Bull Nose
G>Roof, Bull NoseG> on the Home BuildinG Timeline at G>M-26G>
Roof, Dutch Gable
G>Roof, Dutch GableG> on the Home BuildinG Timeline at G>M-25G>
Roof, Gable
G>Roof, GableG> on the Home BuildinG Timeline at G>K-22, K-24, K-25, K26G>
Roof, Gable on Gable
G>Roof, Gable on GableG> on the Home BuildinG Timeline atG> K-26G>
Roof, Hip
G>Roof, HipG> on the Home BuildinG Timeline at G>L-22, M-23, M-24G>
Roof, Shed
G>Roof, ShedG> on the Home BuildinG Timeline at G>K-22, K-25G>
RoofinG Materials - Delivered
G>RoofinG Materials - DeliveredG> on the Home BuildinG Timeline at G>AA-19G>
Room Size vs Plan Dimension
G>Room Size vs Plan DimensionG> on the Home BuildinG Timeline at G>T-21, DD-26G>
Root Line
G>Root LineG> on the Home BuildinG Timeline within the diaGram centered at G>FF-6G>
ROW or RiGht of Way
G>ROW or RiGht of Way G>on the Home BuildinG Timeline atG> E-4, E-5,G> also within the article, SITE LINES atG> F-6G>. Also diaGrammed at G>B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16G>
A RiGht-of-Way (ROW) for a street, road, or hiGhway is a special parcel of land. A road ROW sits beside and between other parcels of property. Some examples are streets, interstate hiGhways, railroad tracks, Gas lines, and power lines.
A RiGht-of-Way for utilities is a special type of easement, and may pass throuGh a privately owned parcel of land. In such a case the landowner still possesses the land, but is not allowed to ever build within the ROW. Examples are Gas pipelines, powerlines, and other utilities like cable television and telephone; and driveways allowinG one owner to cross another owner's land.
Rule Variations
G>Rule VariationsG> on the Home BuildinG Timeline at G>N-20G>
Rules
G>RulesG> on the Home BuildinG Timeline at G>N-19G>
Runoff
G>RunoffG> on the Home BuildinG Timeline at G>JJ-2G>
Rural Project Code Compliance
G>Rural Project Code ComplianceG> on the Home BuildinG Timeline at G>O-21G>
RV (Recreational Vehicle)
G> RV (Recreational Vehicle)G> on the Home BuildinG Timeline at G>F-11G>, within the diaGram centered at G>SS-14G>
Safe Areas
G>Safe AreasG> on the Home BuildinG Timeline at G>AA-23G>
Safe At Home : Life, Possessions, & Structure
G>Safe At Home : Life, Possessions, & StructureG> on the Home BuildinG Timeline at G>Z-11, AA-llG>
Safes & Vaults
G>Safes & Vaults G>on the Home BuildinG Timeline at G>AA-22G>
G>State BuildinG CodeG> on the Home BuildinG Timeline at G>O-22G>
Steel Rods and Wire Mesh for ReinforcinG
G>Steel Rods and Wire Mesh for ReinforcinGG> on the Home BuildinG Timeline at G>Q-10G>
Sticker Shock
G>Sticker Shock G>on the Home BuildinG Timeline at G>BB-25G>
Stilts
G>StiltsG> on the Home BuildinG Timeline at G>T-16G>
Stone and Mortar - Order for Delivery
G>Stone and Mortar - Order for DeliveryG> on the Home BuildinG Timeline at G>EE-13G>
Stone Work, Brick Work, and Masonry Work
G>Stone Work, G>G>Brick Work,G>G> and Masonry WorkG> on the Home BuildinG Timeline at G>EE-10G>
Stop and Think
G>Stop, and ThinkG> on the Home BuildinG Timeline G>EVERYWHERE.G>
"ThinkinG" is the second least-used tactic in the planninG and construction process. The first least-employed tactic is stoppinG to do it.
BuildinG anythinG dwellinG-related is a hurried, hiGh-pressure, hiGher-expectations, hiGhest-emotional-state experience. 'Reason' is replaced by anxiety; and bad decision-makinG follows, naturally. The cure is to Give yourself a moment to consider options. So, stop and think.
G>Learn these phrases and use them often:G>
G>"This doesn't seem riGht. I need some time to think about it."G>
G>"Let's look at that more closely."G>
G>"How can we fix this problem?"G>
G>Gain the hiGh Ground in any situation by seizinG the moment to stop and think.G>
G>ConcerninG every aspect of this project :G>
If you're unsure, stop and become certain.
If a thinG is unknown to you, stop and learn about it.
When a mistake is made, by you or others, stop and find of a solution.
The key word is G>STOPG>. Don't worry if people around you are impatient. Stand firm, as you actively seek positive solutions. -AB
Stop, Study, and Think
G>Stop, Study, and ThinkG> on the Home BuildinG Timeline atG> CC-23, discussed at DD-24G>
StoraGe - GaraGe - Around the EdGe
G>StoraGe - GaraGe - Around the EdGeG> on the Home BuildinG Timeline at G>OO-11G>
StoraGe BuildinG
G>StoraGe BuildinGG> on the Home BuildinG Timeline at G>F-11G>
StoraGe of Possessions
G>StoraGe of PossessionsG> on the Home BuildinG Timeline at G>KK-8G>
StoraGe Under Stairs
G>StoraGe Under StairsG> on the Home BuildinG Timeline at G>TT-26G>
StoraGe Unit Rental
G>StoraGe Unit RentalG> on the Home BuildinG Timeline at G>JJ-7G>
StoraGe, GaraGe
G>StoraGe, GaraGeG> on the Home BuildinG Timeline at SS-9, within the Vehicle DiaGrams centered on G>RR-13, SS-15, RR-20G>
StoraGe, Kitchen
G>StoraGe, KitchenG> on the Home BuildinG Timeline at G>X-8G>, and within the article centered on G>Z-9G>
StoraGe, Kitchen Utensil
G>StoraGe, Kitchen UtensilG> on the Home BuildinG Timeline at G>X-8, X-9G>
Storm DrainaGe Excavation
G>Storm DrainaGe ExcavationG> on the Home BuildinG Timeline at G>Y-2G>
Storm Shelter Excavation
G>Storm Shelter ExcavationG> on the Home BuildinG Timeline at G>W-2G>
Storm Shelter, Concrete Block - BeGin Construction
G>Storm Shelter, Concrete Block - BeGin ConstructionG> on the Home BuildinG Timeline at G>Q-8G>
Storm Shelter, Placed Concrete for Walls
G>Storm Shelter, Placed Concrete for WallsG> on the Home BuildinG Timeline at G>Q-13G>
Storm Shelter, Wall Forms for Near-Future Placed Concrete for
G>Storm Shelter, Wall Forms for Near-Future Placed Concrete forG> on the Home buildinG Timeline at G>Q-9G>
Structural Decay, Evidence of
G>Structural Decay, Evidence of :G> on the Home BuildinG Timeline at G>Q-14G>
Structural Failure - Foundation
G>Structural Failure - FoundationG> on the Home BuildinG Timeline at G>S-8G>
Structures on the Property Line
G>Structures on the Property LineG> on the Home BuildinG Timeline G>diaGram beGinninG at F-24G>
Style, Exterior
G>Style, G>G>ExteriorG> on the Home BuildinG Timeline in the diaGram beGinninG at G>W-21G>
Sub-Party
G>Sub-PartyG> on the Home BuildinG Timeline at G>DD-9G>, and described at G>MM-10G>
Sump Pit Excavation
G>Sump Pit ExcavationG> on the Home BuildinG Timeline at G>W-2, W-3G>
Sander de Wijs (de-Veihs for Americans) owner of The Netherlands-based Get="_blank">DeGrinthorst.nlGet="_blank"> is chief of proGramminG, and also a super Genius. He writes all of the code to make HomeBuildinGTimeline.com function.
Surface Finishes - Quality Check
G>Surface Finishes - G>G>Quality CheckG> on the Home BuildinG Timeline at G>AA-15G>
Survey to place House on Site
G>Survey to place House on SiteG> on the Home BuildinG Timeline at G>BB-2G>
Survival of Possessions
G>Survival of PossessionsG> on the Home BuildinG Timeline at G>Z-23G>
Survival of the Occupants
G>Survival of the OccupantsG> on the Home BuildinG Timeline atG> Z-22, AA-22G>
Survival of the Structure
G>Survival of the StructureG> on the Home BuildinG Timeline at G>Y-23, Z-23G>
SwimminG Pool
G>SwimminG PoolG> on the Home BuildinG Timeline at G>A-2, F-11, II-5G>
TailinGs StaGinG Area
G>TailinGs StaGinG AreaG> on the Home BuildinG Timeline at G>HH-7G>
Tax Incentives, Green BuildinG
G>Tax Incentives, Green BuildinG G> on the Home BuildinG Timeline atG> II-16G>
Telephone Service Installation
G>Telephone Service InstallationG> on the Home BuildinG Timeline at G>BB-2G>
Temporary Electric Power Installation
G>Temporary Electric Power InstallationG> on the Home BuildinG Timeline at G>II-8G>
Tennis Court
G>Tennis CourtG> on the Home BuildinG Timeline at G>II-5G>
Termite Barrier
G>Termite BarrierG> on the Home buildinG Timeline at G>FF-9G>, and within the Article TERMITES beGinninG at G>N-11, N-12, Q-12G>
Termite Barrier Installation
G>Termite Barrier InstallationG> on the Home BuildinG Timeline at G>FF-9 G>G>N-12, O-12, Q-12G>
Termite Shield on Masonry Wall Tops
G>Termite Shield on Masonry Wall TopsG> on the Home BuildinG Timeline at G>Q-13G>
Termites
G>TermitesG> on the Home buildinG Timeline at G>FF-9G>, and within the on-timeline article TERMITES beGinninG at G>N-11G>
Termiticide Placement
G>Termiticide Placement G>on the Home BuildinG Timeline at G>Q-12G>
Terrace
G>TerraceG> on the Home BuildinG Timeline at G>A-1, A-2G>
Terrace Concrete Placement
G>Terrace Concrete PlacementG> on the Home BuildinG Timeline at G>AA-6G>
Test Well Water for Safety
G>Test Well Water for Safety G>on the home BuildinG Timeline at G>DD-9G>
TextinG
G>TextinGG> on the Home BuildinG Timeline at G>MM-15G>
Inside HomeBuildinGTimeline.com within the articles:
G>Toxic Materials Transportation PermitG> on the Home BuildinG Timeline at G>KK-13G>
Toxic Materials, HandlinG Permits for
G>Toxic Materials, HandlinG Permits for G>on the Home BuildinG Timeline at G>KK-11G>
Toxic Smoke
G>Toxic SmokeG> on the Home BuildinG Timeline at G>CC-3G>
Transition Strip
G>Transition StripG> on the Home BuildinG Timeline at G>DCC-12, D12G>
Tree - Closest Proximity for Construction
G>Tree - Closest Proximity for ConstructionG> on the Home BuildinG Timeline within the diaGram centered on G>KK-6 G>
Tree Branch Protection
G>Tree Branch ProtectionG> on the Home BuildinG Timeline atG> II-5G>
Trees, Mark
G>Trees, MarkG> on the Home BuildinG Timeline at G>II-8, JJ-8G>
Trestle, Gate
G>Trestle, GateG> on the Home BuildinG Timeline at G>E-25G>
Trim Installation, Interior
G>Trim Installation, Interior G>on the Home BuildinG Timeline at G>U-13G>
Trim Material, Order
G>Trim Material, OrderG> on the Home BuildinG Timeline at G>CC-7G>
Trim Measurement Verification
G>Trim Measurement VerificationG> on the Home BuildinG Timeline at G>CC-7G>
Trim, Exterior Installation
G>Trim, Exterior InstallationG> on the Home buildinG Timeline at G>EE-12G>
Trim, Touch-up Interior
G>Trim, Touch-up InteriorG> on the Home BuildinG Timeline at G>U-13G>
TrimminG and ClearinG AlonG A Property Line
G>TrimminG and ClearinG AlonG A Property LineG> on the Home BuildinG Timeline at G>A-3,G> G>HH-1, F-2G>
Trust
G>TrustG> on the Home BuildinG Timeline at G>M-7G>
Trust ONLY New Measurements
G>Trust ONLY New MeasurementsG> on the Home BuildinG Timeline at G>O-23G>
UncouplinG Membrane
UncouplinG Membrane on the Home BuildinG Timeline at G>V-11G>
UndercuttinG by Erosion
G>UndercuttinG by ErosionG> on the Home BuildinG Timeline at G>UU-5G>
Unexpected Adjustments
G>UnexpectedG> G>AdjustmentsG> on the Home BuildinG Timeline at G style="font-family: Tahoma;">Q-10, U-10, CC-18, EE-11, II-16, II-17, Y-15G>
USDA MortGaGe & Plan Requirements
G>USDA MortGaGe & Plan Requirements : G>The information and documentation required to qualify for, and process a USDA home loan.
The list is extensive and includes detailed financial information, land survey and title-of-ownership documentation, and assurance documentation provinG compliance with all applicable buildinG codes, enerGy codes, and desiGn standards.
Usefulness of the Plan, The
G>Usefulness of the PlanG> on the Home BuildinG Timeline atG> X-24, discussed at X-25G>
Usefulness, Kitchen
G>Usefulness, KitchenG> on the Home BuildinG Timeline at G>X-8G>, and within the article centered on G>Z-9G>
Utensil StoraGe, Kitchen
G>Utensil G>G>StoraGe, Kitchen G> on the Home buildinG Timeline at G>X-8, X-9G>
Utilities Setup on Site
G>Utilities Setup on SiteG> - on the Home BuildinG Timeline at G>BB-1G>
Utility Easement
G>Utility Easement G>on the Home BuildinG Timeline at G>C-10, D-10G>
Utility Services Costs
G>Utility Services CostsG> on the Home BuildinG Timeline at G>L-9G>
Value
G>ValueG> on the Home BuildinG Timeline at G>H-8, K-10G>
Value vs Cost
G>Value vs CostG> on the Home BuildinG Timeline at G>H-8G>
Variance
G>VarianceG> on the Home BuildinG Timeline at G>P-21, HH-23G>
Vaults & Safes
G>Vaults & Safes G>on the Home BuildinG Timeline at G>AA-22G>
VeGetation Removal ReGulation Compliance
G>VeGetation Removal ReGulation ComplianceG> on the Home BuildinG Timeline at G>EE-3G>
Vehicle ParkinG, Indoor Clearances for
G>Vehicle ParkinG, Indoor Clearances forG> on the Home BuildinG Timeline within the diaGram beGinninG at G>OO-10, QQ-20, TT-19, X-26G>
Vehicle, Overhead Clearance for
G>Vehicle, Overhead Clearance for :G> on the Home BuildinG Timeline within the diaGrams beGinninG at G>OO-10, 00-14, 00-17, 00-19, QQ-20, TT-19G>
Vent and Duct Connection Inspection
G>Vent and Duct Connection InspectionG> on the Home BuildinG Timeline at G>EE-16G>
Verify Stud LenGth for CeilinG HeiGht
G>Verify Stud LenGth for CeilinG HeiGhtG> on the Home BuildinG Timeline at G>Q-7G>
Walk-ThrouGh, Final Inspection
G>Walk-ThrouGh, Final InspectionG> on the Home BuildinG Timeline at G>Z-13G>
Walkway Concrete Placement
G>Walkway Concrete PlacementG> on the Home BuildinG Timeline at G>AA-6G>
Wall StrenGth
G>Wall StrenGthG> on the Home BuildinG Timeline atG> W-16G>
Wall Surface, Interior, Final Installation
G>Wall Surface, Interior, Final InstallationG> on the Home BuildinG Timeline at G>DD-8G>
Wall Surface, Interior, Order Materials
G>Wall Surface, Interior, Order MaterialsG> on the Home BuildinG Timeline at G>EE-12G>
WarninG Markers
G>WarninG MarkersG> on the Home BuildinG Timeline at G>V-4G>
Waste Disposal
G>Waste DisposalG> on the Home BuildinG Timeline at G>CC-25G>, also BEADS Keystone : G>SewaGeG>
Water RiGhts
G>Water RiGhtsG> on the Home BuildinG Timeline at G>J-17G> within the topic G>OWNERSHIPG>.