Access for Permanently Installed Large Machinery and EqUipment
Access for Permanently Installed Large Machinery and EqUipment on the Home BUilding Timeline at X-19
Access Rights - Easements
Access Rights - Easements on the Home BUilding Timeline at G-10, G-11
Accessibility - Wheelchair Van Access
Accessibility - Wheelchair Van Access on the Home BUilding Timeline in the diagram beginning at PP-19
Addition - Fitting New to Old
Addition - Fitting New to Old on the Home BUilding Timeline at JJ-22
Addition Code Compliance
Addition Code Compliance on the Home BUilding Timeline at O-21
Address Sign Installation
Address Sign Installation on the Home BUilding Timeline at II-9
AdjUstments, Unexpected
AdjUstments, Unexpected on the Home BUilding Timeline at Q-10, U-10, CC-18, EE-11, II-16, II-17, Y-15
Advanced Preliminary
Advanced Preliminary on the Home BUilding Timeline at DD-23, EE-25
Affordable
Affordable : Articles concerning effective cost control for bUilding of new homes, additions, remodeling, and renovations are within the Home BUilding Timeline category AFFORDABLE.
Aging In Place
Aging In Place on the Home BUilding Timeline at V-23, X-26 and FF-22; and in the category Aging-In-Place
Air Conditioning and Heating EqUipment - Finished Installation
Air Conditioning and Heating EqUipment - Finished Installation<U style="font-weight: bold;"> U>on the Home BUilding Timeline at V-8
Air Flow - Best Practice for Flexible DUct
Air Flow - Best Practice for Flexible DUct on the Home BUilding within the diagram beginning at FF-15
Air TemperatUre and HUmidity
Air TemperatUre and HUmidity on the Home BUilding Timeline at W-26
Air Test, Piping - Gas / Propane / Water Line
Air Test, Piping - Gas / Propane / Water Line on the Home BUilding Timeline at EE-14
Allowed BUilding Area
Allowed BUilding Area on the Home BUilding Timeline at D-1, HH-22
Also see BEADS Keystone
AltitUde Rights
AltitUde Rights on the Home BUilding Timeline at H-18
AlUminUm Corrosion
AlUminUm Corrosion In HomeBUildingTimeline.com within the article Avoid AlUminUm FailUre by the Sea
Also see Early Specifications & Material Selection on the Home BUilding Timeline at EE-22, FF-25
Analysis, Soil on the Home BUilding Timeline at S-21
Anchor Panels, Wall
Anchor Panels, Wall on the Home BUilding Timeline at DD-9
Anchoring, ColUmn / Post / Pier
Anchoring, ColUmn / Post / Pier on the Home BUilding Timeline at U-17
Anchors, Installation of StrUctUral
Anchors, Installation of StrUctUral on the Home BUilding Timeline at U-18
Andy Bozeman
Andy Bozeman - The resUlts of the work of Andy Bozeman is all over Home BUilding Timeline becaUse he wrote it and drew all the illUstrations. Good job, Andy !
Appraisal for Existing HoUse with Planned Changes, Prior to PUrchase
Appraisal for Existing HoUse with Planned Changes, Prior to PUrchase on the Home BUilding Timeline at K-11
It's expensive to pre-appraise every hoUse yoU might consider for pUrchase, so don't. BUt, as soon as all candidate properties are narrowed to only one, it coUld be very expedient to ascertain both present and fUtUre valUe, based on any planned renovations.
A little money spent now to gain critical knowledge, even if it leads to cancelling the project and pUrchase, coUld save a fortUne, as well as avert years of potential heartache.
Appraisal for Renovation, Preliminary
Appraisal for Renovation, Preliminary on the Home BUilding Timeline at JJ-9
Approval
Approval on the Home BUilding Timeline at JJ-15
Approval, Early Preliminary
Approval, Early Preliminary on the Home BUilding Timeline at EE-21, EE-22
Approval, Final DocUment Preparation for
Approval, Final DocUment Preparation for : on the Home BUilding at FF-21, FF-22
Architect / Designer / Planner / Drafter, AboUt
Architect / Designer / Planner / Drafter, AboUt on the Home BUilding Timeline at BB-24,BB-25
Architect / Designer / Planner / Drafter, Meet
Architect / Designer / Planner / Drafter, Meet on the Home BUilding Timeline at BB-24,BB-25
Architect / Designer / Planner / Drafter, Prepare to Meet
Architect / Designer / Planner / Drafter, Prepare to Meet on the Home BUilding Timeline at AA-24, discUssed at Z-25, AA-25
ArchitectUral Control Committee Plan SUbmission
ArchitectUral Control Committee Plan SUbmission on the Home BUilding Timeline at II-17
ArchitectUral Review Committee Plan SUbmission
ArchitectUral Review Committee Plan SUbmission on the Home BUilding Timeline at II-17
Area : SqUare feet vs SqUare Meters
AREA - Home BUilding Timeline refers to area calcUlations based on SqUare Feet becaUse the primary target-readers live in the United States. SqUare feet for Area and MeasUrement is a component of the Imperial MeasUrement System.
Almost all the rest of the world Uses the Metric MeasUrement System, a far sUperior method. Metric measUrements are easier and faster to determine, and vastly redUce the probability or error.
Area, Exterior
Area, Exterior on the Home BUilding Timeline at R-25
Area, Flat
Area, Flat on the Home BUilding Timeline at R-25
Area, Interior
Area, Interior on the Home BUilding Timeline at R-25
Area, Living
Area, Living is part of the definition for Interior Area on the Home BUilding Timeline at R-25.
Living Area inclUdes all walls needed to enclose the heated and cooled area of a hoUse, whereas Interior Area is only the empty space in any given room or groUp of rooms.
Area, Total SqUare Footage
Area, Total SqUare Footage on the Home BUilding Timeline at H-9
Area, VolUme
Area, VolUme on the Home BUilding Timeline at R-25
Arrow, North
Arrow, North on the Home BUilding Timeline at E-8
As-BUilt MeasUrement Verification
As-BUilt MeasUre Verification on the Home BUilding Timeline at DD-8.
This note's instrUctions are located at CC-9
Attention Span
Attention Span on the Home BUilding Timeline at MM-12
Attic & Roof Passive Vents - Order for Delivery
Attic & Roof Passive Vents - Order for Delivery on the Home BUilding Timeline at W-19
Attic InsUlation
Attic InsUlation on the Home BUilding Timeline at W-15, EE-12
Avalanche
Avalanche on the Home BUilding Timeline at Z-8
Backfill
Backfill on the Home BUilding Timeline at R-16; described at S-14
Backfill Explained
Backfill Explained on the Home bUilding Timeline at S-14
Application at R-16
Balloon Mortgage
Balloon Mortgage : At the end of the initial phase of a sUb-prime mortgage, in which monthly payments are kept artificially low, payments expand sUddenly, overnight or &qUot;balloon&qUot; to many times the original payment amoUnt. Those people who borrow sUch a Balloon Mortgage find themselves Unable to make the very high payments each month, and are forced into foreclosUre. Be here warned to NEVER become part of sUch a financial arrangement.
Barrier,Termite on the Home BUilding Timeline at FF-9, N-12, O-12, Q-12
Basement Excavation
Basement Excavation on the Home BUilding Timeline at W-1
Basement Flooding
Basement Flooding on the Home BUilding Timeline at T-4
Basement Wall Forms for Placed Concrete
Basement Wall Forms for Placed Concrete on the Home BUilding Timeline at Q-9
Basement Wall Tops Contact Barrier
Basement Wall Tops Contact Barrier on the Home BUilding Timeline at Q-13
Basement Wall Tops MoistUre Shield
Basement Wall Tops MoistUre Shield on the Home BUilding Timeline at Q-13
Batter Board Installation
Batter Board Installation on the Home BUilding Timeline at U-3
Batter Board Protection
Batter Board Protection on the Home BUilding Timeline at U-3
BEADS Keystone
BEADS Keystone on the Home BUilding Timeline described, beginning at H-10, implemented at L-10.
This contains the MOST CRITICAL qUestions, which mUst be asked as if the entire BEADS Keystone is one step.
This is the most critical aspect of site selection, and constrUction. The BEADS Keystone is applicable throUghoUt the entire process of home planning, bUilding, remodeling, flipping, and selling.
FUrther, the BEADS Keystone extends into the fUtUre, after move-in, and affects every aspect of home maintenance, comfortable living, and peacefUl enjoyment.
Beam Alignment with ColUmn and Floor Edge
Beam Alignment with ColUmn and Floor Edge on the Home BUilding Timeline at O-24
Beam Strength
Beam Strength on the Home BUilding Timeline at V-16
Bearing Soil
Bearing Soil - part of the BEADS Keystone on the Home BUilding Timeline at I-11
Bearing Soil Layers
Bearing Soil Layers on the Home BUilding Timeline at S-8
Bearing Soil Test
Bearing Soil Test on the Home BUilding Timeline at M-17, described at K-18, M-20, S-23
Bearing Soil Verification
Bearing Soil Verification on the Home BUilding Timeline at II-22
Bearing, EqUal FoUndation
Bearing, EqUal FoUndation on the Home BUilding Timeline at S-8
BeaUtification Easement
BeaUtification Easement on the Home BUilding Timeline at E-1, E-7, FF-4
Before YoU Start to Plan
Before YoU Start to Plan on the Home BUilding Timeline at R-21
Begin Here
Begin Here - on the Home BUilding Timeline at O-1.
The starting point for the entire home planning and bUilding step-by-step process, as defined within HomeBUildingTimeline.com, as well as the diagrammed Home BUilding Timeline, itself.
Berm
Berm on the Home BUilding Timeline at F-2
Bid Review
Bid Review on the Home BUilding Timeline at GG-19
BlackoUt, Seasonal
BLACKOUT, SEASONALat H-18 on the Home BUilding Timeline.
Borrowing NEVERS on the Home BUilding Timeline at K-6
BoUndary Line
BoUndary Line on the Home BUilding Timeline within BEADS Keystone at H-10, I-10 L-12
BoUndary Line Verification
BoUndary Line Verification on the Home BUilding timeline at HH-8
Bracing, Wall
Bracing, Wall on the Home BUilding Timeline at X-17
Brick and Mortar - Order for Delivery
Brick and Mortar - Order for Delivery on the Home BUilding Timeline at EE-13
Brick Work, Stone Work, and Masonry Work
Brick Work, Stone Work, and Masonry Work on the Home BUilding Timeline at EE-10
BUdget
BUdget on the Home BUilding Timeline at FF-24
BUild-Up, Long-term
BUild-Up, Long-term on the Home BUilding Timeline at DD-4
BUilder
BUilder on the Home BUilding Timeline at GG-21
BUilder Candidate Selection
BUilder Candidate Selection on the Home BUilding Timeline at FF-20, GG-20
BUilder Selection
BUilder Selection on the Home BUilding Timeline at HH-19
BUilding Area, Allowed
BUilding Area, Allowed on the Home BUilding Timeline at Item P at E-3
Also see D-14 as green triangle, and noted at D-15
Also see BEADS Keystone
BUilding Code
BUilding Code on the Home BUilding Timeline at JJ-12
BUilding Code vs Plat Restrictions
BUilding Code vs Plat Restrictions on the Home BUilding timeline at O-22
BUilding Department Plan SUbmission
BUilding Department Plan SUbmission on the Home BUilding Timeline at II-17
BUilding Line
BUilding Line on the HomeBUildingTimeline within the diagram centered at D-3 illUstrating many types of BUilding Lines. Also see the Article SITE LINES, which begins at F-6. Also B-9.
Also see BEADS Keystone at I-11
NO-BUILD ZONES are designated on a property sUrvey/plat by BUILDING LINES. No constrUction may occUr in the space between any BUilding Line and any associated property line.
BUilding Lines affect the Front, Sides, and Rear of the property; plUs Easements, and Right of Ways. Sometimes even pavement and landscaping can be controlled by BUilding Lines.
BUilding Line Verification
BUilding Line Verification on the Home BUilding timeline at HH-8
BUilding Lines and Uncovered Decks, Patios, and Terraces
BUilding Lines and Uncovered Decks, Patios, and Terraces at A-1 on the Home BUilding Timeline
BUilding Restriction Line
BUilding Restriction Lines on the HomeBUildingTimeline at Grid D-3 is the center of a diagram illUstrating many types.
NO-BUILD ZONES are designated on a property sUrvey/plat by BUILDING RESTRICTION LINES. No constrUction may occUr in the space between any BUilding Restriction Line and any associated property line.
Restriction Lines affect the Front, Sides, and Rear of the property; plUs Easements, and Right of Ways. Sometimes even pavement and landscaping can be controlled by Restriction Lines.
BUilding Safety Department
BUilding Safety Department on the Home BUilding Timeline at MM-14
BUilding Setback Line
BUilding Setback Line on the Home BUilding Timeline within the diagram centered at D-3. Also see SITE LINES at F-6.
<U> U>
NO-BUILD ZONES are designated on a property sUrvey/plat by BUilding Setback Lines. No constrUction may occUr in the space between any BUilding Setback Line and any associated property line.
BUilding Setback Lines affect the Front, Sides, and Rear of the property; plUs Easements, and Right of Ways. Sometimes even pavement and landscaping can be controlled by BUilding Lines.
BUilding Setback Line, Front
BUilding Setback Line, Front on the Home BUilding Timeline at B-9, C-9, B-14, E-14
BUilding Type
BUILDING TYPE on the Home BUilding Timeline within the BEADS KEYSTONE described at H-10, marked on the timeline at L-12
BUried InfrastrUctUre
BUried InfrastrUctUre and Utilities Location Verification on the Home BUilding Timeline at K-14, O-23
BUried Utilities Location Verification
BUried Utilities Location Verification on the Home BUilding Timeline at K-14, O-23
BUrn Permit
BUrn Permit on the Home BUilding Timeline at JJ-13
BUrning Cleared Debris
BUrning Cleared Debris on the Home BUilding Timeline at CC-2
Cabinet Height, Wall, the EUro-Asian Way
Cabinet Height, Wall, the EUro-Asian Way on the Home BUilding Timeline at AA-8
Cabinet Installation
Cabinet Installation on the Home BUilding Timeline at AA-6
Cabinet MeasUrement Verification
Cabinet MeasUrement Verification on the Home BUilding Timeline at DD-8
Cabinet, Wall, Tall Corner
Cabinet, Wall, Tall Corner on the Home BUilding Timeline at AA-8
Cabinets, Bathroom - Finish Installation
Cabinets, Bathroom - Finish Installation on the Home BUilding Timeline at U-12
Cabinets, Kitchen - Finish Installation
Cabinets, Kitchen - Finish Installation on the Home BUilding Timeline at U-12
Cabinets, Place Order for
Cabinets, Place Order for: on the Home BUilding Timeline at DD-8
Cantilever Deck Addition
Cantilever Deck Addition on the Home BUilding Timeline at X-20
Capillary Barrier Definition
Capillary Barrier Definition - See the Home BUilding Timeline at Q-8 for more.
Commonly called a waterproof membrane, the name was changed to more accUrately depict that the material isn't actUally waterproof. MoistUre can penetrate at seams, gaps, and tears.
Capillary Barrier Installation
Capillary Barrier Installation on the Home BUilding Timeline at Q-8
Capillary Barrier Protection
Capillary Barrier Protection on the Home BUilding Timeline at Q-8
Carpet Flooring Installation
Carpet Flooring Installation on the Home bUilding Timeline at U-13
Carport or Garage
Carport or Garage on the Home BUilding Timeline at F-11
Carport Size
Carport Size on the Home BUilding Timeline at I-9, NN-7, OO-7, PP-7, QQ-7, RR-7, SS-7, UU-7, VV-7, WW-7
Cave-in Prevention
Cave-in Prevention on the Home BUilding Timeline at W-3
Cave-In Protection
Cave-In Protection on the Home BUilding Timeline at V-4
Ceiling Height Verification
Ceiling Height Verification on the Home BUilding Timeline at Q-7
Ceiling Materials
Ceiling Materials on the Home BUilding Timeline at Y-17
Ceiling Strength
Ceiling Strength on the Home BUilding Timeline at Y-16
Centerline Easement
Centerline Easement on the Home BUilding Timeline within the diagram beginning at A-12
Central VacUUm TUbing Installation
Central VacUUm TUbing Installation on the Home BUilding Timeline at DD-15
Certificate of OccUpancy
Certificate of OccUpancy on the Home BUilding Timeline at Y-14
Certification, BUilding Code
Certification, BUilding Code on the Home BUilding Timeline at JJ-12
Certification, Energy Code
Certification, Energy Code on the Home BUilding Timeline at JJ-12
Certification, Flood Plain
Certification, Flood Plain on the Home BUilding Timeline at JJ-12
Certification, Snow Load
Certification, Snow Load on the Home BUilding Timeline at JJ-12
Certification, Wind Load
Certification, Wind Load on the Home BUilding Timeline at JJ-12
Changes and Mistakes
Changes and Mistakes on the Home BUilding Timeline at Q-17
Check Basement Wall Forms
Check Basement Wall Forms on the Home BUilding Timeline at Q-9
Chimney, Masonry
Chimney, Masonry on the Home BUilding Timeline at Q-9
CleanUp Footing Trenches and Forms
CleanUp Footing Trenches and Forms on the Home BUilding Timeline at Q-12, described at 0-13
CleanUp, Final
CleanUp, Final beginning on the Home BUilding Timeline at W-15, X-15
CleanUp, RoUtine
CleanUp, RoUtine on the Home BUilding Timeline at EVERY step to redUce fire hazards, control drainage issUes, manage dUst control, and prevent groUnd-water poisoning.
ROUTINE = DAILY
At every step, and at the conclUsion of every process, assUre that the entire homesite is neat and clean. This dramatically redUces any potential FIRE HAZARD, as well as redUcing the AccUmUlation and Damming of debris and trash resUlting from Drainage.
Pick Up tossed-away board ends. Collect them together for mUlching, or to be carried off-site. DO NOT BURN!!!!
Police the entire site for lUnch-garbage, inclUding sacks, wrappers, bottles, cans, and cartons.
PickUp cigar and cigarette bUtts.
NEVER allow, or tolerate, the tossing of any debris, or trash, into footings and foUndation works. After the material decays, hollows are left, which will weaken the foUndation, and probably lead to foUndation failUre.
Sweep the floors and rake the groUnds, every day. Then, BAG the TRASH.
Search for the topic CLEANUP within HomeBUildingTimeline.com.
Clearing a Hillside
Clearing a Hillside on the Home BUilding Timeline in the diagram beginning at SS-1
Clearing and BUrning
Clearing and BUrning on the Home BUilding Timeline at CC-2
Clearing and Conditioning, Site
Clearing and Conditioning, Site on the Home BUilding Timeline at GG-4
Clearing and Trimming Along A Property Line
Clearing and Trimming Along A Property Line on the Home BUilding Timeline at HH-1
Clearing CaUses Changes
Clearing CaUses Changes on the Home BUilding Timeline at GG-3
Cliff Erosion
Cliff Erosion on the Home BUilding Timeline within the diagram beginning at NN-5
Clothing, Protective
Clothing, Protective on the Home BUilding Timeline at JJ-6
Coatings & Paint, Recycle
Coatings & Paint, Recycle on the Home BUilding Timeline at HH-5, JJ-12, X-15
Collapse Protection
Collapse Protection on the Home BUilding Timeline at V-4
Color of Light - Planning for It
Color of Light : Planning for It on the Home BUilding Timeline at W-24
Color of Light - Applying It
Color of Light - Applying It on the Home BUilding Timeline at W-8
Color of Light - Living With It
Color of Light - Living With It on the Home BUilding Timeline at AA-12
Cost - Environmental Impact Fees on the Home BUilding Timeline at L-14
Cost : How to RedUce
Cost : How to RedUce on the Home BUilding Timeline at H-8, H-9
Cost CUtting
Cost CUtting on the Home BUilding Timeline at FF-19
Cost of InsUrance
Cost of InsUrance on the Home BUilding Timeline at K-11, L-14
Cost vs ValUe
Cost vs ValUe on the Home BUilding Timeline at H-8
Cost, Maintenance
Cost, Maintenance on the Home BUilding Timeline at L-9
Cost, Utility Services
Cost, Utility Services on the Home bUilding Timeline at L-9
Costs of Home Ownership - OBVIOUS
Costs of Home Ownership - OBVIOUS on the Home BUilding Timeline at L-7
Costs of Home Ownership - OVERLOOKED
Costs of Home Ownership - OVERLOOKED on the Home BUilding Timeline at L-8
CoUnter Top Installation
CoUnter Top Installation on the Home BUilding Timeline at Z-6
CoUnter-Shoring
CoUnter-Shoring on the Home BUilding Timeline at V-4
CoUntertop Material Selection
CoUntertop Material Selection on the Home BUilding Timeline at DD-8.
This note's instrUctions are located at CC-8
CoUntertop MeasUrement Verification
CoUntertop MeasUrement Verification on the Home BUilding Timeline at DD-8
CoUntertops - Order for Delivery
CoUntertops, Place Order for: on the Home BUilding Timeline at DD-8
Covenants (Plat Restrictions)
Covenants (Plat Restrictions) on the Home BUilding Timeline at F-9, within BEADS Keystone at H-10, and SITE HAZARDS at I-19, and M-16
Crawlspace Excavation
Crawlspace Excavation on the Home BUilding Timeline at T-3
Crawlspace Footing
Crawlspace Footing on the Home BUilding Timeline at R-12, S-12, T-12
Crawlspace, Ponding In
Crawlspace, Ponding In on the Home BUilding Timeline at T-4
Credit, Maintain
Credit, Maintain on the Home BUilding Timeline at K-7, M-6
CUlvert Installation Permit
CUlvert Installation Permit on the Home BUilding Timeline at II-11
CUrb CUtting Permit
CUrb CUtting Permit on the Home BUilding Timeline at II-11
CUrbside Yard Debris Disposal and PickUp
CUrbside Yard Debris Disposal and Pick-Up on the Home BUilding Timeline at KK-1
CUre Concrete
CUre Concrete on the Home BUilding Timeline at Q-15, R-15
CUrtain Wall Blow OUt Prevention
CUrtain Wall Blow OUt Prevention on the Home BUilding Timeline at Q-12
CUrtain Wall Tops Contact Barrier
CUrtain Wall Tops Contact Barrier on the Home BUilding Timeline at Q-13
CUrtain Wall Tops MoistUre Shield
CUrtain Wall Tops MoistUre Shield on the Home bUilding timeline at Q-13
X-DangeroUs Materials Handling Permits
DangeroUs Materials Handling Permits on the Home bUilding timeline at JJ-13
X-Date of Changes on Plans
Date of Changes on Plans on the Home bUilding Timeline at DD-25
X-Debris Disposal
Debris Disposal on the Home BUilding Timeline at JJ-1
X-Decayed StrUctUre Evidence
Decayed StrUctUre Evidence on the Home BUilding Timeline at Q-14
X-Decisions List, Primary
Decisions List, Primary on the Home BUilding Timeline at S-23, discUssed at R-24
X-Deck
Deck on the Home BUilding Timeline at A-1, A-2, DD-9, V-19
X-Deck Addition Diagram
Deck Addition Diagram the Home BUilding Timeline at X-20
X-Deck and Deck FeatUres, BUild
Deck and Deck FeatUres, BUild on the Home BUilding Timeline at X-19
X-Deck and Porch ConstrUction, Finish
Deck and Porch ConstrUction, Finish on the Home BUilding Timeline at DD-9
X-Defer Specific Wall Framing
Defer Specific Wall Framing on the Home BUilding Timeline at Y-19
X-Demolition Plan
Demolition Plan on the Home BUilding Timeline at GG-22
X-Description of Materials (Specifications )
Description of Materials (Specifications ) on the Home BUilding Timeline at U-21, FF-23
X-Designate Trees and Landscape FeatUres
Designate Trees and Landscape FeatUres on the Home BUilding Timeline JJ-8
X-Dimension Lines
Dimension Lines on the Home BUilding Timeline at T-23
X-Dimensions, Read
Dimensions, Read - Listed as Read HoUse Plans on the Home BUilding Timeline at T-24, discUssed beginning at T-21
X-Display Permits on Sign
Display Permits on Sign on the Home BUilding Timeline at JJ-8
X-Distraction
Distraction : see Indestractable at grid N-3
X-DocUmentation of Progress
DocUmentation of Progress on the Home BUilding Timeline at Q-11, R-14, U-11, DD-15, Z-13
X-Door Clearance - Vehicle
Door Clearance - Vehicle on the Home BUilding Timeline at VV-14
X-Door Hardware Removal DUring Painting
Door Hardware Removal DUring Painting on the Home BUilding Timeline at W-5
X-Doors Delivered
Doors Delivered on the Home BUilding Timeline at AA-18
X-Doors, Install
Doors, Install on the Home BUilding Timeline at BB-18
X-Doors, Order for Delivery
Doors, Order for Delivery on the Home BUilding Timeline at R-15
X-Dormer Window Diagram
Dormer Window Diagram on the Home BUilding Timeline beginning at K-21
X-Dormer with Gable Roof
Dormer with Gable Roof on the Home BUilding Timeline at K-22
X-Dormer with Hip Roof
Dormer with Hip Roof on the Home BUilding Timeline at L-22
X-Dormer with Hybrid Roof
Dormer with Hybrid Roof on the Home BUilding Timeline at L-21, M-21
X-Dormer with Shed Roof
Dormer with Shed Roof on the Home BUilding Timeline at K-22
X-Dormer, Inset
Dormer, Inset on the Home BUilding Timeline at M-22
X-Drainage
Drainage - on the Home BUilding Timeline at EVERY step.
At every step, and in every process, assUre that the drainage of all potential water, whether from rain, snow, broken pipes, or yard sprinklers, is fUlly controlled to prevent erosion, softening of bearing soil, and Undesirable pooling and ponding Under, aroUnd and inside the hoUse, as well as across the property.
Search for the topic DRAINAGE within HomeBUildingTimeline.com.
X-Drainage Control - Remodel
Drainage Control - Remodel on the Home BUilding Timeline at S-3
X-Drainage, Fix
Drainage,Fix on the Home BUilding Timeline at FF-5, and throUghoUt the entire process.
X-Drainage, Preservation of Existing
Drainage, Preservation of Existing on the Home BUilding Timeline at II-22, II-23
X-Drainage, Restore Original
Drainage, Restore Original on the Home BUilding Timeline at DD-4
X-Drainage, Storm, Excavation
Drainage, Storm, Excavation on the Home BUilding Timeline at Y-2
X-Drainage, Trench and Pit
Drainage, Trench and Pit on the Home BUilding Timeline within note centered at V-4
X-Drawers, Kitchen
Drawers, Kitchen on the Home BUilding Timeline at AA-8
X-Dream, American
Dream, American on the Home BUilding Timeline at K-3
X-Drilled Pier for Crawlspace Footing
Drilled Pier for Crawlspace Footing on the Home BUilding Timeline at S-12, T-12
X-Drilled Pier Locations and Installation
Drilled Pier Locations and Installation on the Home BUilding Timeline at R-11, S-11, S-12, T-12, X-1, X-2, X-3
X-Drip Line
Drip Line on the Home BUilding Timeline within the diagram centered at FF-6
X-Driveway
Driveway on the Home BUilding Timeline at F-2
X-Driveway Anatomy
Driveway Anatomy on the Home BUilding Timeline beginning at A-22
X-Driveway Concrete Forms
Driveway Concrete Forms on the Home BUilding Timeline at BB-6
X-Driveway Concrete Placement
Driveway Concrete Placement on the Home BUilding Timeline at AA-6
X-Driveway, Asphalt
Driveway, Asphalt on the Home BUilding Timeline at C-23
X-Driveway, Clay-Gravel
Driveway, Clay-Gravel on the Home BUilding Timeline at C-23
X-Driveway, Concrete
Driveway, Concrete on the Home BUilding Timeline at C-23
X-Driveway, CrUshed Stone
Driveway, CrUshed Stone on the Home BUilding Timeline at C-23
X-Driveway, NatUral Earth
Driveway, NatUral Earth on the Home BUilding Timeline at C-23
X-Driveway, Permanent, RoUgh-in
Driveway, Permanent, RoUgh-in on the Home BUilding Timeline at V-3
X-Driveway, Temporary - Designate Location
Driveway, Temporary - Designate Location on the Home BUilding Timeline at II-7
X-Driveway, Temporary - for ConstrUction Vehicles and EqUipment
Driveway, Temporary - for ConstrUction Vehicles and EqUipment on the Home BUilding Timeline at II-6
X-Driveway, Temporary, Excavation
Driveway, Temporary, Excavation on the Home BUilding Timeline at V-2
X-DrUg Maker ResidUe Remediation
DrUg Maker ResidUe Remediation on the Home BUilding Timeline at JJ-14, JJ-21, MM-22
X-Dry In Entire StrUctUre
Dry In Entire StrUctUre on the Home BUilding Timeline at Z-19
X-DUct and Vent Connection Inspection
DUct and Vent Connection Inspection on the Home BUilding Timeline at EE-16
X-DUctwork & Air Flow - Best Practice for Flexible DUct
DUctwork & Air Flow - Best Practice for Flexible DUct on the Home BUilding within the diagram beginning at FF-15
X-DUctwork - Finished Installation
DUctwork - Finished Installation on the Home BUilding Timeline at V-8
X-DUctwork RoUgh In
DUctwork RoUgh In : on the Home BUilding Timeline at DD-15
X-DUst Control
DUst Control on the Home BUilding Timeline at JJ-6
X-DUtch Gable Roof
DUtch Gable Roof on the Home BUilding Timeline at M-25
Early Installations
Early Installations on the Home BUilding Timeline at AA-2
Easement
Easement on the Home BUilding Timeline at C-4, H-4, G-10, M-19; also throUghoUt the diagram centered at D-3; also see BEADS KEYSTONE,
A NO-BUILD-ZONE, an Easement is an area of property Used to preserve aspects of infrastrUctUre, UsUally for mUltiple properties. No constrUction is ever allowed within an easement. No obstrUction, sUch as fallen trees or the bUild Up of discarded yard trimmings, etc., are ever allowed to remain, and mUst be removed immediately.
The most common easement is a Drainage Easement, which directs the flow of rain water in a manner to prevent flooding of or water damage to properties affected by the easement.
Easement : EqUal Split
Easement : EqUal Split on the Home BUilding Timeline at B-8
Easement : Un-EqUal Split
Easement : Un-EqUal Split on the Home BUilding Timeline at D-8, F-3
Easement Access Rights
Easement Access Rights on the Home BUilding Timeline at G-10, G-11
Easement Line - REAR
Easement Line, REARon the Home BUilding Timeline at B-1
Easement Modification
Easement Modification on the Home BUilding Timeline at P-21, GG-23
Easement, BeaUtification
Easement, BeaUtification on the Home BUilding Timeline at E-1, D-6, FF-4
Easement, Centerline
Easement, Centerline on the Home BUilding Timeline within the diagram beginning at A-12
Easement, Conservation
Easement, Conservation on the Home BUilding Timeline at D-6, G-1, FF-4
Easement, Flowage
Easement, Flow-age on the Home BUilding Timeline at FF-4
Easement, FRONT
Easement, FRONT on the HomebUilding Timeline at G-5
Easement, Mailbox
Easement, Mailbox on the Home BUilding Timeline at H-4
Easement, Private Utility & Drainage (PUDE)
Easement, Private Utility & Drainage (PUDE) on the Home BUilding Timeline at B-6
Easement, Sanitary Sewer
Easement, Sanitary Sewer on the Home BUilding Timeline at A-8
Easement, UneqUal Split
Easement, UneqUal Split on the Home BUilding Timeline at H-3
Easement, Utility
Easement, Utility on the Home BUilding Timeline at C-10, D-10
Electric FixtUre, Disconnect
Electric FixtUre, Disconnect on the Home BUilding Timeline at KK-8
Electric Power Installation, Temporary
Electric Power Installation, Temporary on the Home BUilding Timeline at II-8
Electric Service Installation
Electric Service Installation on the Home BUilding Timeline at BB-2
Electrical CondUit RoUgh-In
Electrical CondUit RoUgh-In on the Home BUilding Timeline at R-7
Electrical Inspection
Electrical Inspection on the Home BUilding Timeline at V-8
Electrical Plan
Electrical Plan on the Home BUilding Timeline at EE-26
Electrical RoUgh In
Electrical RoUgh In on the Home BUilding Timeline at CC-17
Electrical, Finish Installation
Electrical, Finish Installation on the Home BUilding Timeline at V-8
Electrical, Label All CircUits
Electrical, Label All CircUits on the Home BUilding Timeline at V-8
There's nothing so frUstrating or time wasting as attempting to determine which circUit jUst tripped off.
Right now, while the electrician is still on-site, label each circUit, specifically, for what it powers, whether a certain bedroom's oUtlets, or the refrigerator, or the AC Unit, etc.
There will never be a better time.
Electrician to Disconnect FixtUres
Electrician to Disconnect FixtUres on the Home BUilding Timeline at KK-8
Elevator Pit & Related SUmp Pit
Elevator Pit & Related SUmp Pit on the Home BUilding Timeline at W-3
Embellishing the GroUnds
Embellishing the GroUnds on the Home BUilding Timeline at Y-24, discUssed at Y-25, Z-25
EncapsUlation on the Home BUilding Timeline at JJ-14
Energy Code
Energy Code on the Home BUilding Timeline at JJ-12
Engineered Clay Pad for Flat GroUnd
Engineered Clay Pad for Flat GroUnd - on the Home BUilding Timeline at V-1.
Engineered Clay Pad for Recessed Installation
Engineered Clay Pad for Recessed Installation - on the Home BUilding Timeline at T-1
Engineered Clay Pad for Sloped GroUnd
Engineered Clay Pad for Sloped GroUnd : on the Home BUilding Timeline at R-1
Engineered Pad for FoUndation
Engineered Pad for FoUndation on the Home BUilding Timeline at T-2
Environmental Impact Fees
Environmental Impact Fees on the Home BUilding Timeline at L-14
EqUal Bearing
EqUal Bearing on the Home BUilding Timeline at S-8
Erosion by Water
Erosion by Water on the Home BUilding Timeline at QQ-1
Erosion Control MeasUres
Erosion Control MeasUres on the Home BUilding Timeline at QQ-3
Erosion Control RegUlations
Erosion Control RegUlations on the Home BUilding Timeline at FF-4
Erosion Maintenance MeasUres
Erosion Maintenance MeasUres on the Home BUilding Timeline at RR-2
Erosion Prevention MeasUres
Erosion Prevention MeasUres on the Home BUilding Timeline at RR-1
Erosion, Cliff
Erosion, Cliff on the Home BUilding Timeline within the diagram beginning at NN-5
Erosion, Shore
Erosion, Shore on the Home BUilding Timeline within the diagram beginning at NN-5
Erosion, UndercUtting
Erosion, UndercUtting on the Home BUilding Timeline at UU-5
Errors
Errors on the Home BUilding Timeline at K-4, L-3, N-4
Esplanade Margin
Esplanade Margin on the Home BUilding Timeline at J-20 inside the topic Hazards of Site Selection
Evidence of Chronic Pest Infestation
Evidence of Chronic Pest Infestation on the Home BUilding Timeline at Q-15
Evidence of Decayed StrUctUre
Evidence of Decayed StrUctUre on the Home BUilding Timeline at Q-14
Excavate Footings
Excavate Footings on the Home BUilding Timeline at T-4
Excavate for Basement
Excavate for Basement - on the Home BUilding Timeline at W-1
Excavate for Crawlspace
Excavate for Crawlspace on the Home BUilding Timeline at T-3
Excavate for FoUndation
Excavate for FoUndation on the Home BUilding Timeline at T-4
Excavation Phase
Excavation Phase on the Home BUilding Timeline at Z-2
Experience, Contractor's
Experience, Contractor's on the Home BUilding Timeline at II-20
Extent
Extent on the Home BUilding Timeline at G-7, H-13, S-25, Q-26, R-26, S-26, T-26
Extent of StrUctUre
Extent of StrUctUre on the Home BUilding Timeline.at G-7, H-13, S-25, Q-26, R-26, S-26, T-26
In the BEADS KEYSTONE at <U>H-13U>
Diagrammed at at <U>S-25, T-26U>
ALLOWED EXTENT OF STRUCTURES :The applied &lsqUo;extent&rsqUo; of a strUctUre is the part allowed to toUch, bUt not cross a bUilding line. RUles vary. The extent considered might be the edge of walls, footings, any overhangs, decks, patios, stoops, steps, eaves, arbors, and more. CHECK CAREFULLY.
Exterior Look and Style
Exterior Look and Style on the Home BUilding Timeline in the diagram beginning at W-21
Exterior Paint and Stain, Finish
Exterior Paint and Stain, Finish on the Home BUilding Timeline at DD-9
Exterior SUrfacing & trim Materials - Order for Delivery
Exterior SUrfacing & trim Materials - Order for Delivery on the Home BUilding Timeline at W-19
Exterior Wall SUrfaces, Blend
Exterior Wall SUrfaces, Blend on the Home BUilding Timeline in the diagram beginning at CC-10
Exterior Wall SUrfaces, Match
Exterior Wall SUrfaces, Match on the Home BUilding Timeline in the diagram beginning at CC-10
Face Plate Removal DUring Painting
Face Plate Removal DUring Painting on the Home BUilding Timeline at X-6
Face Plate Screw Slots
Face Plate Screw Slots on the Home BUilding Timeline at Z-13, AA-13, AA-14
FailUre Evidence, FoUndation
FailUre Evidence, FoUndation on the Home BUilding Timeline at P-14
FailUre, FoUndation - StrUctUral
FailUre, FoUndation-StrUctUral on the Home BUilding Timeline at S-8, T-9
Fall Protection
Fall Protection on the Home BUilding Timeline at V-4
Fall Protection Installation
Fall Protection Installation on the Home BUilding Timeline at V-19
Fast Water
Fast Water on the Home BUilding Timeline at CC-25, QQ-2, diagram beginning at NN-5
Feel of the Plan
Feel of the Plan on the Home BUilding Timeline at W-24, discUssed at W-25
Fence Crossing BUilding Lines and Easements
Fence Crossing BUilding Lines and Easements on the Home BUilding Timeline at B-4
Fence on the Property Line
Fence on the Property Line on the Home BUilding Timeline diagram beginning at F-24
Fences, Landscaping, and Special Easements
Fences, Landscaping, and Special Easementson the Home BUilding Timeline at C-1
Fencing on the Property Line
Fencing on the Property Line on the Home BUilding Timeline at B-3, and in the diagram centered at G-25
Fill Dirt
Fill Dirt on the Home BUilding Timeline at AA-3, H-20
Fill Dirt in a GroUnd Depression
Fill Dirt in a GroUnd Depression on the Home BUilding Timeline at OO-2
Fill Dirt on A Hillside
Fill Dirt on A Hillside on the Home BUilding Timeline at OO-3 & OO-4
Fill Dirt on Flat GroUnd
Fill Dirt on Flat GroUnd on the Home BUilding Timeline at OO-1
Final Inspection
Final Inspection on the Home BUilding Timeline at X-15
Final Installations
Final Installations on the Home BUilding Timeline at Z-6
Final Plans
Final Plans on the Home BUilding Timeline at FF-21
Financing - ConstrUction Loan - Arrange with Lender
Financing - ConstrUction Loan - Arrange with Lender on the Home BUilding Timeline at HH-19
Finished SUrfaces, QUality Inspection of
Finished SUrfaces, QUality Inspection of : on the Home BUilding Timeline at Z-15
Fire Ants - Finally a Redeeming QUality
Fire Ants - Finally a Redeeming QUality on the Home BUilding Timeline at A-17
Fire Code Inspection
Fire CodeInspection on the Home BUilding Timeline at U-9
Fire Control
Fire Control on the Home BUilding Timeline at CC-3
Fire Detection
Fire Detection on the Home BUilding Timeline at Z-23
Fire Deterrence
Fire Deterrence on the Home BUilding Timeline at Z-23
Fire Prevention MeasUres
Fire Prevention MeasUres on the Home BUilding Timeline at CC-3
Fire Prevention Vehicle & EqUipment Access
Fire Prevention Vehicle & EqUipment Access on the Home bUilding Timeline at CC-3, HH-6
Fire Retardant Treatment
Fire Retardant Treatment on the Home BUilding Timeline at CC-21
Fire SUrvival
Fire SUrvival on the Home BUilding Timeline at JJ-22
Fire Watch
Fire Watch on the Home bUilding Timeline at CC-3, DD-15, FF-16
Firestop
Firestop on the Home BUilding Timeline at X-17
Fitting New Addition to Older StrUctUre
Fitting New Addition to Older StrUctUre on the Home BUilding Timeline at JJ-22
Fix the Drainage
Fix the Drainage on the Home BUilding Timeline at FF-5, and throUghoUt the entire process.
Flashing Inspection
Flashing Inspection on the Home BUilding Timeline at CC-19
Float Away Resistance
Float Away Resistance on the Home BUilding Timeline at BB-16
Flood
Flood on the Home BUilding Timeline at JJ-12
Floor Edge Alignment with Beam and ColUmn
Floor Edge Alignment with Beam and ColUmn on the Home BUilding Timeline at O-24
Floor Framing Installation
Floor Framing Installation on the Home BUilding Timeline at V-18, diagrammed at R-19
Floor Grid
Floor Grid on the Home BUilding Timeline at HH-12
Floor Lighting RoUgh-In
Floor Lighting RoUgh-In on the Home BUilding Timeline at R-7
Floor PlUg RoUgh-In
Floor PlUg RoUgh-In on the Home BUilding Timeline at R-7
Flooring, Install All (except carpeting)
Flooring, Install All (except carpeting) on the Home BUilding Timeline at U-12
For Carpet Installation see U-13
Floors, Strength of
Floors, Strength of on the Home BUilding Timeline at R-19
Flow-age Easement
Flow-age Easement on the Home BUilding Timeline at FF-4
Fly Away Resistance
Fly Away Resistance on the Home BUilding Timeline at BB-16
Footing on Property Line
Footing on Property Line on the Home BUilding Timeline at G-26
Footing, Isolated Crawlspace
Footing, Isolated Crawlspace on the Home BUilding Timeline at R-12, S-12
Footings on the Property Line
Footings on the Property Line on the Home BUilding Timeline at B-3, in the diagram centered at G-25
Footings, Commonly Used ConfigUrations
Footings, Commonly Used ConfigUrations on the Home BUilding Timeline in the diagram beginning at R-10
Footings, Excavate For
Footings, Excavate For on the Home BUilding Timeline at T-4
Footings, Place Concrete for
Footings, Place Concrete for : on the Home bUilding Timeline at Q-13
Footprint of StrUctUre
Footprint of StrUctUre on the Home BUilding Timeline at R-26, S-25, T-26
Forced Land Pooling
Forced Land Pooling on the Home BUilding Timeline at I-17 to J-17; and H-20
Part of Oil and Gas Rights of Ownership at I-17 to J-17; and Hazards of Site Selection at H-20.
Form : Basement Walls
Form : Basement Walls on the Home BUilding Timeline at Q-9
Form : Storm Shelter Walls
Form : Storm Shelter Walls on the home bUilding Timeline at Q-9
Form Work Check
Form Work Check on the Home BUilding Timeline at S-5
Form Work, Remove
Form Work, Remove on the Home BUilding Timeline at R-15
Form, Driveway Concrete
Form,Driveway Concrete on the Home BUilding Timeline at BB-6
Forms, FoUndation
Forms, FoUndation on the Home BUilding Timeline at S-5, BB-7
FoUndation - EqUal Bearing
FoUndation - EqUal Bearing on the Home BUilding Timeline at S-8
FoUndation - StrUctUral FailUre
FoUndation - StrUctUral FailUre on the Home BUilding Timeline at S-8, T-9
FoUndation Blow OUt Prevention
FoUndation Blow OUt Prevention on the Home BUilding Timeline at Q-12
FoUndation FailUre Evidence
FoUndation FailUre Evidence on the Home BUilding Timeline at P-14
FoUndation Forms
FoUndation Formson the Home BUilding Timeline at S-5
FoUndation Inspection
FoUndation Inspection on the Home BUilding Timeline at Q-10
FoUndation Materials
FoUndation Materials on the Home BUilding Timeline at BB-2
FoUndation Options
FoUndation Options on the Home BUilding Timeline at BB-26
FoUndation Piers and Pilings
FoUndation Piers and Pilings on the Home BUilding Timeline at R-11, S-11, T-11
FoUndation Pilings and Piers
FoUndation Pilings andPiers on the Home BUilding Timeline at R-11, S-11, T-11
FoUndation Preparation
FoUndation Preparation on the Home BUilding Timeline at S-5
FoUndation SUb-Contractor
FoUndation SUb-Contractor on the Home BUilding Timeline at BB-2
FoUndation, Excavate For
FoUndation, Excavate For on the Home BUilding Timeline at T-4
FoUndations for Additions
FoUndations for Additions on the Home BUilding Timeline at R-13, S-13, T-13
FoUndations, Commonly Used ConfigUrations
FoUndations, Commonly Used ConfigUrations on the Home BUilding Timeline in the diagram beginning at R-10
Fractions in Dimensions - Why?
Fractions in Dimensions - Why? on the Home BUilding Timeline at U-22, U-23
Framing Materials - Order for Delivery
Framing Materials - Order for Delivery on the Home BUilding Timeline at Q-8
InclUdes Floors, walls, ceilings, and roof
Framing Repair & Replacement
Framing Repair & Replacement on the Home BUilding Timeline at DD-19
Framing, Begin for Walls, Ceiling, Roof
Framing, Begin for Walls, Ceiling, Roof on the Home BUilding Timeline at V-19
Front BUilding Line
Front BUilding Line on the HomeBUildingTimeline at E4 and E5.
Also see BEADS Keystone
The FRONT BUILDING LINE, also know as the <U>front setback lineU>, marks the point on any given property that is the nearest to the Front property line where a strUctUre may be bUilt.
MEASURING THE FRONT BUILDING LINE : The Front BUilding Line cannot measUred from the street. the cUrb, the edge of the pavement, or the edge of the road. It mUst be measUred from the <U>property lineU> designated as the Front of the lot. If yoU are Unable to determine the exact location of the Front Property Line, then find a professional who can offer assistance.
Front BUilding Setback Line
Front BUilding Setback Line on the Home BUilding Timeline at B-9, C-9
Front Setback Line
Front Setback Line on the Home BUilding Timeline at B-9, C-9, E4, E5.
The FRONT SETBACK LINE, also known as the front bUilding line, marks the point on any given property that is the nearest to the Front property line where a strUctUre may be bUilt.
MEASURING THE FRONT Setback LINE : The Front Setback Line is NOT measUred from the street. the cUrb, the edge of the pavement, or the edge of the road. It mUst be measUred from the <U>property lineU> designated as the Front of the lot. If yoU are Unable to determine the exact location of the Front Setback Line, then find a professional who can offer assistance.
FUel Storage
FUel Storage on the Home BUilding Timeline at CC-26
FUrnishings Removal for Renovation
FUrnishings Removal for Renovation on the Home BUilding Timeline at JJ-6
FUrnitUre
FUrnitUre - Allow enoUgh room - on the Home BUilding Timeline at X-25
FUrr, Cabinet
FUrr, Cabinet on the Home BUilding Timeline at Z-8
Gable Roof
Gable Roof on the Home BUilding Timeline at K-22, K-24, K-25, K26
Garage or Carport
Garage on the Home BUilding Timeline at F-11
Garage Size
Garage Size on the Home BUilding Timeline at I-9, NN-9, OO-9, PP-9, QQ-9, RR-9, SS-8, UU-9, VV-9, WW-9, X-26
Garage Storage AroUnd the Edge
Garage Storage AroUnd the Edge on the Home BUilding Timeline at OO-11
Gas & Propane Line RoUgh-In
Gas & Propane Line RoUgh-In on the Home BUilding Timeline at R-6
Gas / Propane Line RoUgh In
Gas / Propane Line RoUgh In on the Home BUilding Timeline at EE-14
Gate : Entrance, Pillar, Post, Large, Trestle
Gate : Entrance, Pillar, Post, Large, Trestle on the Home BUilding Timeline diagram beginning at A-24
Gate Pillar Strength and Stability
Gate Pillar Strength and Stability on the Home BUilding Timeline at C-24, D-24, E-24
Gate, Estate
Gate, Estate on the Home BUilding Timeline at C-26, D-26, E-25
Gazebo and Pavilion
Gazebo and Pavilion on the Home BUilding Timeline at A-2
Geo-technical Engineer
Geo-technical Engineer on the Home BUilding Timeline at S-22
Grab Bar
Grab Bar on the Home BUilding Timeline at DD-9
Grade for Drainage AroUnd FoUndation
Grade for Drainage AroUnd FoUndation on the Home BUilding Timeline at R-16
Grading, Yard
Grading, Yard on the Home BUilding Timeline at BB-7
Green BUilding MeasUre : Waterproofing Chemicals, CaptUre and Contain ResidUe
Green BUilding MeasUre : Waterproofing Chemicals, CaptUre and Contain ResidUe on the Home BUilding Timeline at R-14
Green BUilding Tax Incentives
Green BUilding Tax Incentives on the Home BUilding Timeline at II-16
Green BUilding Verifier
Green Verifier on the Home BUilding Timeline at EE-11, II-7, U-10, II-16, V-19
Green BUilding Verifier - Capillary Barrier
Green BUilding Verifier - Capillary Barrier on the Home BUilding Timeline at Q-8
Green BUilding Verifier - Head Flashing
Green BUilding Verifier - Head Flashing on the Home BUilding Timeline at BB-17
GroUnd Coverage
GroUnd Coverage on the Home BUilding Timeline at CC-25
GUesstimate
GUesstimate on the Home BUilding Timeline at H-9
This is a slang reference to the attempt to estimate the final constrUction cost too early in the process, when there's not enoUgh information available. It is a GUESS at an ESTIMATE.
GUtter Protection
GUtter Protection on the Home BUilding Timeline at BB-19
Landscape Details and Plantings Installation on the Home BUilding Timeline at V-14
Landscape FeatUres Crossing BUilding Lines and Easements
Landscape FeatUres Crossing BUilding Lines and Easements on the Home BUilding Timeline at C-4
Landscape FeatUres, Mark
Landscape FeatUres, Mark on the Home BUilding Timeline at II-8, JJ-8
Landscape, CleanUp
Landscape, CleanUp on the Home BUilding Timeline at X-15
Landscaping - Grade Yard, Place Sand
Landscaping - Grade Yard, Place Sand on the Home BUilding Timeline at BB-7
Landscaping : 'Live' Plant Barriers & Wrapping for Protection
Landscaping : 'Live' Plant Barriers & Wrapping for Protection on the Home BUilding Timeline at II-7
Landscaping : Live-Plant Staging Areas
Landscaping : Live-Plant Staging Areas on the Home BUilding Timeline at HH-7
Lead Paint Remediation
Lead Paint Remediation on the Home BUilding Timeline at M-18, JJ-14, KK-21, MM-21
Lead Remediation - Paint and Pipes
Lead Remediation - Paint and Pipes on the Home BUilding Timeline at JJ-14, KK-21
Leak Detection, Chronic
Leak Detection, Chronic on the Home BUilding Timeline at P-14
Leased Land for a Homesite
Leased Land for a Homesite on the Home BUilding Timeline at N-18
Lender, Arrange ConstrUction Loan with
Lender, Arrange ConstrUction Loan with on the Home BUilding Timeline at HH-19
Letter to Proceed
Letter to Proceed on the Home BUilding Timeline at KK-17
Lien Release AssUrance
Lien Release AssUrance on the Home BUilding Timeline at Z-14
Light FixtUre Delivery to Site
Light FixtUre Delivery to Site on the Home BUilding Timeline at V-7
Light FixtUre Removal for Renovation
Light FixtUre Removal for Renovation on the Home BUilding Timeline at KK-7
Light PollUtion
LIGHT POLLUTION on the Home BUilding Timeline at H-18, Hazards of Site Selection.
Light, Color of
Light, Color of on the Home BUilding Timeline at W-8
Lighting FixtUre, Inspection and Repair
Lighting FixtUre, Inspection and Repair on the Home BUilding Timeline at Z-14, AA-14
Lighting, Portable - Rental
Lighting, Portable - Rental on the Home BUilding Timeline at KK-7
Livestock
Livestock on the Home BUilding Timeline at Y-26, Z-26
Living Area
Living Area is part of the definition for Interior Area on the Home BUilding Timeline at R-25.
Living Area inclUdes all walls needed to enclose the heated and cooled area of a hoUse, whereas Interior Area is only the empty space in any given room or groUp of rooms.
Load Bearing StrUctUre & Wall Identification
Load Bearing StrUctUre & Wall Identification on the Home BUilding Timeline at GG-22
Location of HoUse on Property
Location of HoUse on Property on the Home BUilding Timeline at K-14
Log Cabin IllUstration
Log Cabin IllUstration on the Home BUilding Timeline at R-24, S-24, T-25
Look of the Plan and HoUse
Look of the Plan and HoUse on the Home BUilding Timeline at W-24, discUssed at V-25, W-25
Mailbox Easement
Mailbox Easement on the Home BUilding Timeline at H-4
Main BUilding in Plat Restrictions
Main BUilding in Plat Restrictions on the Home BUilding Timeline at F-9 to F-10
Maintain YoUr Home
Maintain YoUr Home on the Home BUilding Timeline at Y-11
Maintenance Costs
Maintenance Costs on the Home BUilding Timeline at L-9
Maintenance of the Home
Maintenance of the Home on the Home BUilding Timeline at Y-11
Manifold, Hot Water PlUmbing
Manifold, Hot Water PlUmbing on the Home BUilding Timeline within the on-timeline article, Hot Water PlUmbing: The Manifold beginning beginning at FF-11
Mark ALL Homesite Corners, Lines, and Points
Mark ALL Homesite Corners, Lines, and Points on the Home BUilding Timeline at HH-8
Mark Trees and Landscape FeatUres
Mark Trees and Landscape FeatUres on the Home BUilding Timeline at II-8, JJ-8
Markers
Markers - on the Home BUilding Timeline at Y-1
Markers, Warning
Markers, Warning on the Home BUilding Timeline at V-4
Masonry Materials - Order for Delivery
Masonry Materials - Order for Delivery on the Home BUilding Timeline at EE-13
Masonry Work, Brick Work, and Stone Work
Masonry Work, Brick Work, and Stone Work on the Home BUilding Timeline at EE-10
Match Exterior Wall SUrfaces
Match Exterior Wall SUrfaces on the Home BUilding Timeline in the diagram beginning at CC-10
Match New with Old
Match New with Old on the Home BUilding Timeline at DD-13
Material Selection - CoUntertop
Material Selection - CoUntertop on the Home BUilding Timeline at DD-8.
This note's instrUctions are located at CC-8
Material Selection, Man-Made
Material Selection, Man-Made on the Home BUilding Timeline at FF-25
Material Selection, Match New to Old
Material Selection, Match New to Old on the Home BUilding Timeline at DD-13
Material Storage Prearrangement
Material Storage Prearrangement on the Home BUilding Timeline at Q-7, R-7
Maximizing the Plan
Maximizing the Plan on the Home BUilding Timeline at Y-24, discUssed at Y-25
MeasUre StrUctUre As-BUilt for Cabinet Installation
MeasUre StrUctUre As-BUilt for Cabinet Installation on the Home BUilding Timeline at DD-8.
This note's instrUctions are located at CC-9
MeasUre StrUctUre As-BUilt for CoUntertop Installation
MeasUre StrUctUre As-BUilt for CoUntertop Installation on the Home BUilding Timeline at DD-8.
This note's instrUctions are located at CC-9
Mechanical - Definition
Mechanical - Definition : Refers to all eqUipment related to the infrastrUctUre of a hoUse for the pUrpose of moving air and flUids. This inclUdes HVAC (heating, ventilation, and air conditioning) connections, dUct-work, and eqUipment, sUch as air handlers, fUrnaces, compressors, and hUmidifier/dehUmidifier Units. It also inclUdes all plUmbing pipes, fittings, and valves.
Mechanical Inspection
MechanicalInspection on the Home bUilding Timeline at EE-11, U-9
Mechanical Phase
Mechanical Phase on the Home BUilding Timeline at DD-16
Meeting of the Minds
Meeting of the Minds on the Home BUilding Timeline atII-9, S-22, S-23
Meeting, Pre-ConstrUction
Meeting, Pre-ConstrUction on the Home BUilding Timeline at II-9
Mesh, Wire and Steel Rods for Reinforcing
Mesh, Wire and Steel Rods for Reinforcing on the Home BUilding Timeline at Q-10
Method
Method on the Home BUilding Timeline at HH-12
Mimic, Aerodynamic Roof
Mimic, Aerodynamic Roof on the Home BUilding Timeline at Z-16
Money SoUrces - BAD on the Home BUilding Timeline at L-6
Money SoUrces - GOOD
Money SoUrces - GOOD on the Home BUilding Timeline at M-6
Money, Saving
Money, Saving on the Home BUilding Timeline at K-6
Monkey See Monkey Do (also see MSMD)
<U>Monkey See Monkey DoU> : An actUal bUt wrong method of constrUction-cost calcUlation performed by an incompetent bUilder who is copying other incompetent bUilders, none of whom has any knowledge of constrUction costs whatsoever.
Move In
Move In on the Home BUilding Timeline at Z-12
Moving AroUnd In The HoUse
Moving AroUnd In The HoUse on the Home BUilding Timeline at V-24, discUssed at W-23
MUd Tracks & Trails from Homesite
MUd Tracks & Trails from Home Site on the Home BUilding Timeline at EE-3
Natal Homing
<U>Natal HomingU> In HomeBUildingTimeline.com, within the article <U>LIGHTS OUT BY THE SEAU>
Neighborhood ArchitectUral Control Committee Plan SUbmission
Neighborhood ArchitectUral Control Committee Plan SUbmission on the Home BUilding Timeline at II-17
Neighborhood Harmony
Neighborhood Harmony on the Home BUilding Timeline at HH-1, KK-1
North Arrow
North Arrow on the Home BUilding Timeline at E-8
Obstacles
Obstacles mentions on the Home BUilding Timeline at <U>N-4U>
OccUpancy, Certificate of
OccUpancy, Certificate of on the Home BUilding Timeline at Y-14
One Room HUt
One Room HUt on the Home BUilding Timeline at S-24
Option to PUrchase
Option to PUrchase on the Home BUilding Timeline at N-19
Ordinance
Ordinance on the Home BUilding Timeline at M-19, LL-16
Other BUildings in Plat Restrictions
Other BUildings in Plat Restrictions on the Home BUilding Timeline at F-9 to F-10
Over-CUtting a Hillside
Over-CUtting a Hillside on the Home BUilding Timeline at Y-3, and in the diagram beginning at SS-1
Overhead Power Line Location Verification
Overhead Power Line Location Verification on the Home BUilding Timeline at O-23
Overhead Utility Wiring
Overhead Utility Wiring on the Home BUilding Timeline at I-3
Own, What YoU
Own, What YoU on the Home BUilding Timeline at M-15; partial list at H-17
Ownership
Ownership partially listed on the Home BUilding Timeline at H-17
P.U.D.E. - Private Utility & Drainage Easement
P.U.D.E. : Private Utility & Drainage Easement on the Home BUilding Timeline at B-6
Paint & Coatings, Recycle
Paint & Coatings, Recycle on the Home BUilding Timeline at HH-5, JJ-12, X-15
Paint - Final Coat
Paint - Final Coat on the Home BUilding Timeline at V-7
Paint - QUality Check
Paint - QUality Check on the Home BUilding Timeline at Z-14, AA-15
Plans,Final on the Home BUilding Timeline at FF-21
Planting Protection
Planting Protection on the Home BUilding Timeline at II-4
Plantings and Landscape Details Installation
Plantings and Landscape Details Installation on the Home BUilding Timeline at V-14
Plat Restrictions
Plat Restrictions on the Home BUilding Timeline at F-9, within BEADS Keystone at H-10, and SITE HAZARDS at I-19, and M-16
Plat Restrictions : Main BUilding
Plat Restrictions : Main BUilding on the Home bUilding Timeline at F-10, G-8
Plat Restrictions : Other BUildings
Plat Restrictions : Other BUildings on the Home bUilding Timeline at F-10, G-9
Plat Restrictions vs BUilding Code
Plat Restrictions vs BUilding Code on the Home BUilding timeline at O-22
PlUmbing Drains - Existing
PlUmbing Drains - Existing on the Home BUilding Timeline at Q-25
PlUmbing Manifold, Hot Water
PlUmbing Manifold, Hot Water on the Home BUilding Timeline within the on-timeline article beginning at FF-11
PlUmbing RoUgh-In
PlUmbing RoUgh-In on the Home BUilding Timeline at S-5
PlUmbing Top OUt
PlUmbing Top OUt on the Home BUilding Timeline at EE-15
PlUmbing Trim-OUt
PlUmbing Trim-OUt on the Home BUilding Timeline at W-6
Points of Connection
Points of Connection on the Home BUilding Timeline at AA-16, Z-17
Pole, Power
Pole, Power on the Home BUilding Timeline atI-3
Police Action for Debris, MUd, and Trash in Footing Trenches
Police Action for Debris, MUd, and Trash in Footing Trenches on the Home BUilding Timeline at Q-12, O-13
Pond, Retention
Pond,Retention on the Home BUilding Timeline at QQ-4
Ponding in a Crawlspace
Ponding in a Crawlspace on the Home BUilding Timeline at T-4
Ponding Prevention
Ponding Prevention on the Home BUilding Timeline at T-4
Ponding Under a Slab
Ponding Under a Slab on the Home BUilding Timeline at T-4
Pool, Ornamental
Pool, Ornamental on the Home BUilding Timeline at A-2
Porch and Deck ConstrUction, Finish
Porch and Deck ConstrUction, Finish on the Home BUilding Timeline at DD-9
Porch Size, Covered Area
Porch Size, Covered Area on the Home BUilding Timeline at I-9
Possessions, Storage of
Possessions, Storage of : on the Home BUilding Timeline at KK-8
Post and Pillar Strength
Post and Pillar Strength on the Home BUilding Timeline G-22, diagrammed at G-23
Post Strength
Post Strength on the Home BUilding Timeline at T-16
Post, Fence
Post, Fence on the Home BUilding Timeline at G-25
Power Line Location Verification, Overhead
Power Line Location Verification, Overhead on the Home BUilding Timeline at O-23
Power Service Installation
Power Service Installation on the Home BUilding Timeline at BB-2
Power Vents - Order for Delivery
Power Vents - Order for Delivery on the Home BUilding Timeline at W-19
Pre-ConstrUction Meeting
Pre-ConstrUction Meeting on the Home BUilding Timeline atII-9
Pre-Inspection
Pre-Inspection on the Home BUilding Timeline at JJ-8
Preliminary Plan, Early
Preliminary Plan, Early on the Home BUilding Timeline at CC-23, discUssed CC-24
Preliminary, Advanced
Preliminary, Advanced on the Home BUilding Timeline at DD-23, discUssed at EE-25
Preparation, Site
Preparation, Site on the Home BUilding Timeline at GG-4
Prepare to BUild
Prepare to BUild on the Home BUilding Timeline at JJ-10
Primary Decisions List
Primary Decisions List on the Home BUilding Timeline at S-23, discUssed at R-24
Private Road / Street StatUs Verification
Private Road / Street StatUs Verification on the Home BUilding Timeline at M-20
Proceed, Official Letter to
Proceed, Official Letter to : on the Home BUilding Timeline at II-11
Project Planning, Final
Project Planning, Final on the Home BUilding Timeline at HH-19
Propane & Gas Line RoUgh-In
Propane & Gas Line RoUgh-In on the Home BUilding Timeline at R-6
Propane / Gas Line RoUgh In
Propane / Gas Line RoUgh In on the Home BUilding Timeline at EE-14
Property BoUndary Line
Property BoUndary Line on the Home BUilding Timeline within the diagram centered at D-3, shown as the thick white line; and within the diagram centered at C-8., within the on-timeline article SITE LINES at F-6; and within the BEADS Keystone at H-10, I-10, L-12
Property Line
Property Line on the Home BUilding Timeline at B-10, C-10, D-10
Also within the diagram centered at D-3, shown as the thick white line.
Also within the diagram centered at C-8.,
Article SITE LINES at F-6; and within the BEADS Keystone at H-10, I-10, L-12
Also at A-15, A-16
Property Line Verification
Property<U style="font-weight: bold;"> U>Line Verification on the Home BUilding timeline at HH-8
Property Line, Fence & StrUctUre ON
Property Line, Fence & StrUctUre ON on the Home BUilding Timeline diagram beginning at F-24
Propping, Shoring, Trench
Propping, Shoring, Trench on the Home BUilding Timeline at V-4
Protection for Live Plants
Protection for Live Plants on the Home BUilding Timeline at II-7
Protection of Tree Branches
Protection of Tree Branches on the Home BUilding Timeline atII-5
Protection, Planting
Protection, Planting on the Home BUilding Timeline at II-4
Protective Covers
Protective Covers on the Home BUilding Timeline at EE-13
PUnch List, Final Inspection
PUnch-List, Final Inspection on the Home BUilding Timeline at Z-13
QUality Check - Paint on the Home BUilding Timeline at AA-14
QUality Check, SUrface Finishes
QUality Check, SUrface Finishes on the Home BUilding Timeline at Z-15
QUick Start
QUick Start on the Home BUilding Timeline at O-2
Radon Gas - Definition
Radon Gas - Definition on the Home BUilding Timeline at DD-2, DD-3,EE-1, EE-2
Radon Venting Diagram
Radon Venting on the Home BUilding Timeline at R-6 & T-6
Radon Venting RoUgh In
Radon Venting RoUgh In : on the Home BUilding Timeline at R-6
Radon Venting Top OUt
Radon Venting Top OUt on the Home BUilding Timeline at EE-15
Radon Venting, Crawlspace Pipe Installation for
Radon Venting, Crawlspace Pipe Installation for : on the Home BUilding Timeline at T-18
Railings of Stairs, Finish Installation of
Railings of Stairs, Finish Installation of : on the Home BUilding Timeline at U-12
Read HoUse Plans
Read HoUse Plans on the Home BUilding Timeline at T-24, discUssed beginning at T-21
Rear BUilding Set Back Line
Rear BUilding Set Back Line on the Home BUilding Timeline at C-1.
Rear Easement
Rear Easement on the Home BUilding Timeline at B-1
Rebar
Rebar on the Home BUilding Timeline at Q-10
Recreational Vehicle (RV)
Recreational Vehicle (RV) on the Home BUilding Timeline at F-11, within the diagram centered at SS-14
Recycle Coatings and Paint
Recycle Coatings and Paint on the Home BUilding Timeline at HH-5
Recycle Paint & Coatings
Recycle Paint & Coatings on the Home BUilding Timeline at HH-5, JJ-12, X-15
RefUsal, First Right of
RefUsal, First Right of : on the Home BUilding Timeline at N-19
RegUlations
RegUlations on the Home BUilding Timeline at N-19
RegUlations, Erosion Control
RegUlations, Erosion Control on the Home BUilding Timeline at FF-4, I-20
RegUlations, Hierarchy
RegUlations, Hierarchy on the Home bUilding Timeline at O-10
RegUlations, Wildlife Habitat
RegUlations,Wildlife Habitat on the Home BUilding Timeline at FF-4, I-20
RegUlators, Meet
RegUlators, Meet on the Home BUilding Timeline at O-20
Reinforcing Wire Mesh and Steel Rods
Reinforcing Wire Mesh and Steel Rods on the Home BUilding Timeline at Q-10
Remediation Permits
Remediation Permits on the Home BUilding Timeline at JJ-14
Repair & Replacement
Repair & Replacement on the Home BUilding Timeline at DD-19
Restrictions, Plat
Restrictions, Plat on the Home BUilding Timeline at F-9, within BEADS Keystone at H-10, and SITE HAZARDS at I-19, and M-16
Restrictive Covenants
Restrictive Covenants on the Home BUilding Timeline at M-19
Restroom, Temporary Portable
Restroom, Temporary Portable on the Home BUilding Timeline at HH-8
Retention Pond
Retention Pond on the Home BUilding Timeline at QQ-4
Right-of-Way
Right of Way on the Home BUilding Timeline at E-4, E-5, also within the on-timeline article, SITE LINES at F-6. Also diagrammed at B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16
A Right-of-Way (ROW) for a street, road, or highway is a special parcel of land. A road ROW sits beside and between other parcels of property. Some examples are streets, interstate highways, railroad tracks, gas lines, and power lines.
A Right-of-Way for Utilities is a special type of easement, and may pass throUgh a privately owned parcel of land. In sUch a case, the landowner still possesses the land, bUt is not allowed to ever bUild within the ROW. Examples are gas pipelines, powerlines, and other Utilities like cable television and telephone; and driveways allowing one owner to cross another owner's land.
Riparian Margin
Riparian Margin on the Home BUilding Timeline at I-19 inside the topic Hazards of Site Selection
Roof
<U>RoofU> on the Home BUilding Timeline at AA-18, AA-19, EE-12, I-21, K-21, K-23, S-17, W-22, Z-16.
Roof - NEVER New Over Old
Roof - NEVER New Over Old on the Home BUilding Timeline at CC-19
Roof Drainage IssUes, Altered
Roof Drainage IssUes, Altered on the Home BUilding Timeline at V-19, U-20, V-20
Roof Dry In Complete
Roof Dry In Complete on the Home BUilding Timeline at AA-18
Roof Framing - Begin Installation
Roof Framing - Begin Installation on the Home BUilding Timeline at V-20
Roof Materials
Roof Materials on the Home BUilding Timeline at Z-16
Roof Materials: Order for Delivery
Roof Materials : Order for Delivery on the Home bUilding Timeline at EE-13
Roof Plane Intersection and Rainwater RUn Off
Roof Plane Intersection and Rainwater RUn Off on the Home BUilding Timeline at V-20
Roof Slope / Pitch
Roof Slope / Pitch diagrammed on the Home BUilding Timeline beginning atI-21
Roof Strength
Roof Strength on the Home BUilding Timeline at Z-16
Roof SUrface Material Installation
Roof SUrface Material Installation on the Home BUilding Timeline at EE-13
Roof SUrface Material Verification
Roof SUrface Material Verification on the Home BUilding Timeline at AA-19
Roof SUrface Materials : Order for Delivery
Roof SUrface Materials : Order for Delivery on the Home bUilding Timeline at EE-13
Roof Types
Roof Types on the Home BUilding Timeline diagrammed beginning at K-23
Roof, BUll Nose
Roof, BUll Nose on the Home BUilding Timeline at M-26
Roof, DUtch Gable
Roof, DUtch Gable on the Home BUilding Timeline at M-25
Roof, Gable
Roof, Gable on the Home BUilding Timeline at K-22, K-24, K-25, K26
Roof, Gable on Gable
Roof, Gable on Gable on the Home BUilding Timeline at K-26
Roof, Hip
Roof, Hip on the Home BUilding Timeline at L-22, M-23, M-24
Roof, Shed
Roof, Shed on the Home BUilding Timeline at K-22, K-25
Roofing Materials - Delivered
Roofing Materials - Delivered on the Home BUilding Timeline at AA-19
Room Size vs Plan Dimension
Room Size vs Plan Dimension on the Home BUilding Timeline at T-21, DD-26
Root Line
Root Line on the Home BUilding Timeline within the diagram centered at FF-6
ROW or Right of Way
ROW or Right of Way on the Home BUilding Timeline at E-4, E-5, also within the article, SITE LINES at F-6. Also diagrammed at B-10, C-10, D-10, B-11, C-11, D-11, A-15, D-15, A-16, D-16
A Right-of-Way (ROW) for a street, road, or highway is a special parcel of land. A road ROW sits beside and between other parcels of property. Some examples are streets, interstate highways, railroad tracks, gas lines, and power lines.
A Right-of-Way for Utilities is a special type of easement, and may pass throUgh a privately owned parcel of land. In sUch a case the landowner still possesses the land, bUt is not allowed to ever bUild within the ROW. Examples are gas pipelines, powerlines, and other Utilities like cable television and telephone; and driveways allowing one owner to cross another owner's land.
RUle Variations
RUle Variations on the Home BUilding Timeline at N-20
RUles
RUles on the Home BUilding Timeline at N-19
RUnoff
RUnoff on the Home BUilding Timeline at JJ-2
RUral Project Code Compliance
RUral Project Code Compliance on the Home BUilding Timeline at O-21
RV (Recreational Vehicle)
RV (Recreational Vehicle) on the Home BUilding Timeline at F-11, within the diagram centered at SS-14
Safe Areas
Safe Areas on the Home BUilding Timeline at AA-23
Safe At Home : Life, Possessions, & StrUctUre
Safe At Home : Life, Possessions, & StrUctUre on the Home BUilding Timeline at Z-11, AA-ll
Safes & VaUlts
Safes & VaUlts on the Home BUilding Timeline at AA-22
Shapes of Land Parcels on the Home BUilding Timeline at grid K-1
Shed Roof
Shed Roof on the Home BUilding Timeline at K-22, K-25
Shelter, The
Shelter, The on the Home BUilding Timeline at S-17
Shopping
Shopping on the Home BUilding Timeline at EE-23, GG-20
Shore Erosion
Shore Erosion on the Home BUilding Timeline within the diagram beginning at NN-5
Shoring
Shoring on the Home BUilding Timeline at SS-5, V-4
Shoring Braces
Shoring Braces on the Home BUilding Timeline at R-3
Shoring for Blow OUt Prevention
Shoring for Blow OUt Prevention on the Home BUilding Timeline at Q-12
Shoring, CoUnter
Shoring, CoUnter on the Home BUilding Timeline at V-4
This is not aboUt a kitchen or bath coUnter. This is aboUt balancing force to keep a wall from collapsing, dUring renovation,or demolition.
Shower Door MeasUrements
Shower Door MeasUrements on the Home BUilding Timeline at Z-6
Side Yard Setback Line
Side Yard Setback Line on the Home BUilding Timeline at F-2
Sidewalk
Sidewalk on the Home BUilding Timeline at G-5
Sidewalk, PUblic
Sidewalk, PUblic on the Home BUilding Timeline at E-5, A-15, D-15, A-16, D-16
Sill Plates on Top of Masonry Walls, Check - SqUare and Level
Sill Plates on Top of Masonry Walls, Check - SqUare and Level on the Home BUilding Timeline at Q-14
Sill Plates on Top of Masonry Walls, Install
Sill Plates on Top of Masonry Walls, Install on the Home BUilding Timeline at Q-14
Silt Fence
Silt Fence on the Home BUilding Timeline at KK-2, S-5
Silt Fence Inspection and Repair
Silt Fence Inspection and Repair on the Home BUilding Timeline at R-15, S-5, U-3, V-14, BB-7, CC-17
Silt Fence Installation
Silt Fence Installation on the Home BUilding Timeline at II-8, Y-2
No physical materail is allowed to cross over any property line, whether sawdUst, gravel, cement & mortar particles, lUnch trash, hUman & animal waste, spilled paint, nails & screws, drywall bits & flakes, even mUddy water.
II-8 : Install primary silt fence for initial control of erosion and rain-water rUn-off from the property.
Y-2 : Install any needed additional Silt Fencing to assUre fUll control of rain-water rUn-off.
Site Clearing and Conditioning
Site Clearing and Conditioning on the Home BUilding Timeline at GG-4
Site Preparation
Site Preparation on the Home BUilding Timeline at GG-4
Site SUitability and Plan Types
Site SUitability and Plan Types on the Home BUilding Timeline at U-24, discUssed at V-25
Size
Size on the Home BUilding Timeline at R-25
Skill, Contractor's
Skill, Contractor's on the Home BUilding Timeline at II-20
Slab, Place Concrete for
Slab, Place Concrete for : on the Home BUilding Timeline at Q-13
Slow Water
Slow Water on the Home BUilding Timeline at QQ-3, and within the diagram beginning at NN-5
Smoke, Toxic
Smoke, Toxic on the Home BUilding Timeline at CC-3
Snow
Snow on the Home BUilding Timeline at JJ-12
Snow and Ice Weight
Snow and Ice Weight on the Home BUilding Timeline at Z-18
Snow Melt
Snow Melt on the Home BUilding Timeline at CC-25
Soil Analysis
Soil Analysis on the Home BUilding Timeline at S-21, S-23
Soil Poisoning for Termites
Soil Poisoning for Termites on the Home BUilding Timeline at Q-12
Soil Test
Soil Test on the Home BUilding Timeline at M-17, described at K-18, S-23
Solar Harvesting
Solar Harvesting on the Home BUilding Timeline at CC-26
Solar Rights
Solar Rights on the Home BUilding Timeline at I-17; and within the topic SOLAR ENERGY INVESTMENT PROTECTION LAWS
Specifications (Description of Materials)
Specifications (Description of Materials) on the Home BUilding Timeline at U-21, FF-23
Specifications - Material Selection
Specifications - Material Selection on the Home BUilding Timeline at FF-25
Specifications, Early (Preliminary)
Specifications, Early (Preliminary) on the Home BUilding Timeline at EE-22, described at FF-23
Spray Foam InsUlation
Spray Foam InsUlation on the Home BUilding Timeline at AA-21
SqUare Footage, Total Area
SqUare Footage, Total Area on the Home BUilding Timeline at H-9
Stability from the Plan
Stability from the Plan on the Home BUilding Timeline at Y-22, U-24
Stability of Everything
Stability of Everything on the Home BUilding Timeline at grid H-16.
Part of The BEADS KEYSTONE.
Stain and Paint, Finish Exterior
Stain and Paint, Finish Exterior on the Home BUilding Timeline at DD-9
Stair - Edge Stringer - StrUctUral
Stair - Edge Stringer - StrUctUral on the Home BUilding Timeline at NN-24
Stair - Headroom
Stair - Headroom on the Home BUilding Timeline at SS-24, TT-24, SS-25, SS-26
Stair - Storage Beneath
Stair - Storage Beneath on the Home BUilding Timeline at SS-24, TT-24, TT-26
Stair - Straight RUn
Stair - Straight RUn on the Home BUilding Timeline at PP-24
Stair - Wall Stringer, Decorative
Stair - Wall Stringer, Decorative on the Home BUilding Timeline at MM-26
Stair - Wall Stringer, StrUctUral
Stair - Wall Stringer, StrUctUral on the Home BUilding Timeline at NN-24
Stair : Mid-Landing
Stair : Mid-Landing on the Home BUilding Timeline at QQ-24, RR-24
Stair : Mid-Stringer
Stair : Mid-Stringer on the Home BUilding Timeline at NN-24
Stair BUilding Code
Stair BUilding Code on the Home BUilding Timeline diagram centered on PP-25
Stair Kick Plate at the Bottom
Stair Kick Plate at the Bottom on the Home BUilding Timeline at MM-25, NN-25
Stair Ledger at Top
Stair Ledger at Top on the Home BUilding Timeline at MM-24
Stair Rise, RUn, and Treads
Stair Rise, RUn, and Treads on the Home BUilding Timeline at QQ-25
Stair Riser
Stair Riser on the Home BUilding Timeline at NN-26
Stair Riser Space
Stair Riser Space on the Home BUilding Timeline at NN-24
Stair Safety
Stair Safety on the Home BUilding Timeline at VV-24
Stair Stringer
Stair Stringer on the Home BUilding Timeline at NN-24, MM-26
A StrUctUral Stringer sUpports the weight of the movement on the stairs of people and possessions.
A Decorative Stringer looks pretty bUt is non-load-bearing.
Stair Tread
Stair Tread on the Home BUilding Timeline at NN-24, NN-26 OO-26, QQ-25
Stair Winder
Stair Winder on the Home BUilding Timeline at VV-25
Stair, Bathroom Under
Stair, Bathroom Under on the Home BUilding Timeline at TT-25
Stairs, Finish Installation of
Stairs, Finish Installation of : on the Home BUilding Timeline at U-12
Stairs, Interior - RoUgh In
Stairs, Interior - RoUgh In : on the Home BUilding Timeline at Z-19
Stairway Anatomy
Stairway Anatomy on the Home BUilding Timeline at OO-25
State BUilding Code on the Home BUilding Timeline at O-22
Steel Rods and Wire Mesh for Reinforcing
Steel Rods and Wire Mesh for Reinforcing on the Home BUilding Timeline at Q-10
Sticker Shock
Sticker Shock on the Home BUilding Timeline at BB-25
Stilts
Stilts on the Home BUilding Timeline at T-16
Stone and Mortar - Order for Delivery
Stone and Mortar - Order for Delivery on the Home BUilding Timeline at EE-13
Stone Work, Brick Work, and Masonry Work
Stone Work, Brick Work, and Masonry Work on the Home BUilding Timeline at EE-10
Stop and Think
Stop, and Think on the Home BUilding Timeline EVERYWHERE.
&qUot;Thinking&qUot; is the second least-Used tactic in the planning and constrUction process. The first least-employed tactic is stopping to do it.
BUilding anything dwelling-related is a hUrried, high-pressUre, higher-expectations, highest-emotional-state experience. 'Reason' is replaced by anxiety; and bad decision-making follows, natUrally. The cUre is to give yoUrself a moment to consider options. So, stop and think.
Learn these phrases and Use them often:
&qUot;This doesn't seem right. I need some time to think aboUt it.&qUot;
&qUot;Let's look at that more closely.&qUot;
&qUot;How can we fix this problem?&qUot;
Gain the high groUnd in any sitUation by seizing the moment to stop and think.
Concerning every aspect of this project :
If yoU're UnsUre, stop and become certain.
If a thing is Unknown to yoU, stop and learn aboUt it.
When a mistake is made, by yoU or others, stop and find of a solUtion.
The key word is STOP. Don't worry if people aroUnd yoU are impatient. Stand firm, as yoU actively seek positive solUtions. -AB
Stop, StUdy, and Think
Stop, StUdy, and Think on the Home BUilding Timeline at CC-23, discUssed at DD-24
Storage - Garage - AroUnd the Edge
Storage - Garage - AroUnd the Edge on the Home BUilding Timeline at OO-11
Storage BUilding
Storage BUilding on the Home BUilding Timeline at F-11
Storage of Possessions
Storage of Possessions on the Home BUilding Timeline at KK-8
Storage Under Stairs
Storage Under Stairs on the Home BUilding Timeline at TT-26
Storage Unit Rental
Storage Unit Rental on the Home BUilding Timeline at JJ-7
Storage, Garage
Storage, Garage on the Home BUilding Timeline at SS-9, within the Vehicle Diagrams centered on RR-13, SS-15, RR-20
Storage, Kitchen
Storage, Kitchen on the Home BUilding Timeline at X-8, and within the article centered on Z-9
Storage, Kitchen Utensil
Storage, Kitchen Utensil on the Home BUilding Timeline at X-8, X-9
Storm Drainage Excavation
Storm Drainage Excavation on the Home BUilding Timeline at Y-2
Storm Shelter Excavation
Storm Shelter Excavation on the Home BUilding Timeline at W-2
Storm Shelter, Concrete Block - Begin ConstrUction
Storm Shelter, Concrete Block - Begin ConstrUction on the Home BUilding Timeline at Q-8
Storm Shelter, Placed Concrete for Walls
Storm Shelter, Placed Concrete for Walls on the Home BUilding Timeline at Q-13
Storm Shelter, Wall Forms for Near-FUtUre Placed Concrete for
Storm Shelter, Wall Forms for Near-FUtUre Placed Concrete for on the Home bUilding Timeline at Q-9
StrUctUral Decay, Evidence of
StrUctUral Decay, Evidence of : on the Home BUilding Timeline at Q-14
StrUctUral FailUre - FoUndation
StrUctUral FailUre - FoUndation on the Home BUilding Timeline at S-8
StrUctUres on the Property Line
StrUctUres on the Property Line on the Home BUilding Timeline diagram beginning at F-24
Style, Exterior
Style, Exterior on the Home BUilding Timeline in the diagram beginning at W-21
SUb-Party
SUb-Party on the Home BUilding Timeline at DD-9, and described at MM-10
SUmp Pit Excavation
SUmp Pit Excavation on the Home BUilding Timeline at W-2, W-3
SUper GeniUs
SUper GeniUs
Andy Noel foUnder of ProSaUraSystems.com is one. He created the mechanism for this Index.
Sander de Wijs (de-Veihs for Americans) owner of The Netherlands-based Degrinthorst.nlis chief of programming, and also a sUper geniUs. He writes all of the code to make HomeBUildingTimeline.com fUnction.
SUrface Finishes - QUality Check
SUrface Finishes - QUality Check on the Home BUilding Timeline at AA-15
SUrvey to place HoUse on Site
SUrvey to place HoUse on Site on the Home BUilding Timeline at BB-2
SUrvival of Possessions
SUrvival of Possessions on the Home BUilding Timeline at Z-23
SUrvival of the OccUpants
SUrvival of the OccUpants on the Home BUilding Timeline at Z-22, AA-22
SUrvival of the StrUctUre
SUrvival of the StrUctUre on the Home BUilding Timeline at Y-23, Z-23
Swimming Pool
Swimming Pool on the Home BUilding Timeline at A-2, F-11, II-5
Tailings Staging Area
Tailings Staging Area on the Home BUilding Timeline at HH-7
Tax Incentives, Green BUilding
Tax Incentives, Green BUilding on the Home BUilding Timeline at II-16
Telephone Service Installation
Telephone Service Installation on the Home BUilding Timeline at BB-2
Temporary Electric Power Installation
Temporary Electric Power Installation on the Home BUilding Timeline at II-8
Tennis CoUrt
Tennis CoUrt on the Home BUilding Timeline at II-5
Termite Barrier
Termite Barrier on the Home bUilding Timeline at FF-9, and within the Article TERMITES beginning at N-11, N-12, Q-12
Termite Barrier Installation
Termite Barrier Installation on the Home BUilding Timeline at FF-9 N-12, O-12, Q-12
Termite Shield on Masonry Wall Tops
Termite Shield on Masonry Wall Tops on the Home BUilding Timeline at Q-13
Termites
Termites on the Home bUilding Timeline at FF-9, and within the on-timeline article TERMITES beginning at N-11
Termiticide Placement
Termiticide Placement on the Home BUilding Timeline at Q-12
Terrace
Terrace on the Home BUilding Timeline at A-1, A-2
Terrace Concrete Placement
Terrace Concrete Placement on the Home BUilding Timeline at AA-6
Test Well Water for Safety
Test Well Water for Safety on the home BUilding Timeline at DD-9
Texting
Texting on the Home BUilding Timeline at MM-15
Inside HomeBUildingTimeline.com within the articles:
Toxic Materials Transportation Permit on the Home BUilding Timeline at KK-13
Toxic Materials, Handling Permits for
Toxic Materials, Handling Permits for on the Home BUilding Timeline at KK-11
Toxic Smoke
Toxic Smoke on the Home BUilding Timeline at CC-3
Transition Strip
Transition Strip on the Home BUilding Timeline at DCC-12, D12
Tree - Closest Proximity for ConstrUction
Tree - Closest Proximity for ConstrUction on the Home BUilding Timeline within the diagram centered on KK-6
Tree Branch Protection
Tree Branch Protection on the Home BUilding Timeline atII-5
Trees, Mark
Trees, Mark on the Home BUilding Timeline at II-8, JJ-8
Trestle, Gate
Trestle, Gate on the Home BUilding Timeline at E-25
Trim Installation, Interior
Trim Installation, Interior on the Home BUilding Timeline at U-13
Trim Material, Order
Trim Material, Order on the Home BUilding Timeline at CC-7
Trim MeasUrement Verification
Trim MeasUrement Verification on the Home BUilding Timeline at CC-7
Trim, Exterior Installation
Trim, Exterior Installation on the Home bUilding Timeline at EE-12
Trim, ToUch-Up Interior
Trim, ToUch-Up Interior on the Home BUilding Timeline at U-13
Trimming and Clearing Along A Property Line
Trimming and Clearing Along A Property Line on the Home BUilding Timeline at A-3,HH-1, F-2
TrUst
TrUst on the Home BUilding Timeline at M-7
TrUst ONLY New MeasUrements
TrUst ONLY New MeasUrements on the Home BUilding Timeline at O-23
UncoUpling Membrane
UncoUpling Membrane on the Home BUilding Timeline at V-11
UndercUtting by Erosion
UndercUtting by Erosion on the Home BUilding Timeline at UU-5
Unexpected AdjUstments
UnexpectedAdjUstments on the Home BUilding Timeline at Q-10, U-10, CC-18, EE-11, II-16, II-17, Y-15
USDA Mortgage & Plan ReqUirements
USDA Mortgage & Plan ReqUirements : The information and docUmentation reqUired to qUalify for, and process a USDA home loan.
The list is extensive and inclUdes detailed financial information, land sUrvey and title-of-ownership docUmentation, and assUrance docUmentation proving compliance with all applicable bUilding codes, energy codes, and design standards.
UsefUlness of the Plan, The
UsefUlness of the Plan on the Home BUilding Timeline at X-24, discUssed at X-25
UsefUlness, Kitchen
UsefUlness, Kitchen on the Home BUilding Timeline at X-8, and within the article centered on Z-9
Utensil Storage, Kitchen
Utensil Storage, Kitchen on the Home bUilding Timeline at X-8, X-9
Utilities SetUp on Site
Utilities SetUp on Site - on the Home BUilding Timeline at BB-1
Utility Easement
Utility Easement on the Home BUilding Timeline at C-10, D-10
Utility Services Costs
Utility Services Costs on the Home BUilding Timeline at L-9
ValUe
ValUe on the Home BUilding Timeline at H-8, K-10
ValUe vs Cost
ValUe vs Cost on the Home BUilding Timeline at H-8
Variance
Variance on the Home BUilding Timeline at P-21, HH-23
VaUlts & Safes
VaUlts & Safes on the Home BUilding Timeline at AA-22
Vegetation Removal RegUlation Compliance
Vegetation Removal RegUlation Compliance on the Home BUilding Timeline at EE-3
Vehicle Parking, Indoor Clearances for
Vehicle Parking, Indoor Clearances for on the Home BUilding Timeline within the diagram beginning at OO-10, QQ-20, TT-19, X-26
Vehicle, Overhead Clearance for
Vehicle, Overhead Clearance for : on the Home BUilding Timeline within the diagrams beginning at OO-10, 00-14, 00-17, 00-19, QQ-20, TT-19
Vent and DUct Connection Inspection
Vent and DUct Connection Inspection on the Home BUilding Timeline at EE-16
Verify StUd Length for Ceiling Height
Verify StUd Length for Ceiling Height on the Home BUilding Timeline at Q-7
Walk-ThroUgh, Final Inspection
Walk-ThroUgh, Final Inspection on the Home BUilding Timeline at Z-13
Walkway Concrete Placement
Walkway Concrete Placement on the Home BUilding Timeline at AA-6
Wall Strength
Wall Strength on the Home BUilding Timeline at W-16
Wall SUrface, Interior, Final Installation
Wall SUrface, Interior, Final Installation on the Home BUilding Timeline at DD-8
Wall SUrface, Interior, Order Materials
Wall SUrface, Interior, Order Materials on the Home BUilding Timeline at EE-12
Warning Markers
Warning Markers on the Home BUilding Timeline at V-4
Waste Disposal
Waste Disposal on the Home BUilding Timeline at CC-25, also BEADS Keystone : Sewage
Water Rights
Water Rights on the Home BUilding Timeline at J-17 within the topic OWNERSHIP.